Skip to the record
Search everything, all in one place.

Council archive · source document

3000- Lot 7 & 8 SMP - June 2018 · OPW18/0155

Attached to the e-mail Operational Works Application OPW18/0155 - Stormwater Management Statement, Plans - (Email 2 of 4).msg.

of 25

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                RIP MANAGEMENT AND MAINTENANCE PLAN

ELEMENT:                                              MAINTENANCE OF RAPID
                                                      INFILTRATION PITS (RIP’s)
1.    Objective              To ensure ongoing function of RIP’s in reintroducing
                             runoff into the subsoil.

2.    Management Strategy    RIP to remain free of silt/sediment build-ups.

3.    Actions                Maintenance contractor        to service RIP’s   at
                             monthly intervals.

                             All removed sediment/silt to be placed in skips or
                             bins for disposal.

4.    Performance Indicators Body Corporate to ensure maintenance schedule
                             adhered to.
5.    Frequency/Deadline     Monthly inspections.
6.    Responsible    Person Body corporate to ensure maintenance schedule
      /Organisation          adhered to.

                             Maintenance contractor to make entries in
                             environmental diary noting date of RIP service,
                             condition of RIP, material removed and means of
                             disposal.

                             Random inspection by Council/EPA officers.
7.    Reporting and Review   Maintenance Contractor to make entries in
                             environmental diary noting date of RIP service,
                             condition of RIP, material removed and means of
                             disposal.

                             Random inspection by Council/EPA officers.

8.    Corrective Action      Review maintenance schedule as appropriate.

                             Replace BIDIM A14 filter yearly or more regularly
                             when necessary.

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

3000- Lot 7 & 8 SMP - June 2018.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.