Skip to the record
Every meeting, every word.

Council archive · source document

3000- Lot 7 & 8 SMP - June 2018 · OPW18/0155

Attached to the e-mail Operational Works Application OPW18/0155 - Stormwater Management Statement, Plans - (Email 2 of 4).msg.

of 25

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

TABLE 1.0

RESULTS OF PROTOTYPE INFILTRATION PIT (IP)
TESTING 23 JULY 2001

HEAD (M)

 

0 10 20 30 40 50
INFILTRATION RATE (mm/SEC)

—_— eRe ee eee

 

    
  
 

   
  

   
  

 

 

 
    

 

 

 

DRAWHIG STATUS Design: EDF, MR FATTSSOUL.cnmerRS PY LD J PROSECT: Ce
it a ABN. 26
7 or TAL E: ti see [SETTLERS COVE — HIGH DENSITY RESDEATAL INFILTRATION PIT TESTING RESULTS
: SH,
I Datum: AMD, , :  eomEERe eRe oD 74 at SERENITY CLOSE, NOOSA HEADS DRAWING No: CIGS6/0S/MCU/IP2 Revision:
(ROFESSIONAL ENGIN! fotenetou
ev |DATE DESCRIPTION = for SETTLERS COVE DEVELOPMENT PTY LTD ancien sual Pet
SHAT TETPST CREST TTS TEE

 

 

 

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

3000- Lot 7 & 8 SMP - June 2018.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.