Council archive · source document
3000- Lot 7 & 8 SMP - June 2018 · OPW18/0155
Attached to the e-mail Operational Works Application OPW18/0155 - Stormwater Management Statement, Plans - (Email 2 of 4).msg.
TABLE 1.0
RESULTS OF PROTOTYPE INFILTRATION PIT (IP)
TESTING 23 JULY 2001
HEAD (M)
0 10 20 30 40 50
INFILTRATION RATE (mm/SEC)
—_— eRe ee eee
DRAWHIG STATUS Design: EDF, MR FATTSSOUL.cnmerRS PY LD J PROSECT: Ce
it a ABN. 26
7 or TAL E: ti see [SETTLERS COVE — HIGH DENSITY RESDEATAL INFILTRATION PIT TESTING RESULTS
: SH,
I Datum: AMD, , : eomEERe eRe oD 74 at SERENITY CLOSE, NOOSA HEADS DRAWING No: CIGS6/0S/MCU/IP2 Revision:
(ROFESSIONAL ENGIN! fotenetou
ev |DATE DESCRIPTION = for SETTLERS COVE DEVELOPMENT PTY LTD ancien sual Pet
SHAT TETPST CREST TTS TEE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
3000- Lot 7 & 8 SMP - June 2018.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.