Council archive · source document
3000- Lot 7 & 8 SMP - June 2018 · OPW18/0155
Attached to the e-mail Operational Works Application OPW18/0155 - Stormwater Management Statement, Plans - (Email 2 of 4).msg.
- Contents - 1.0 INTRODUCTION ...................................................... 1 2.0 EXISTING CONDITIONS .......................................... 2 3.0 PROPOSED DEVELOPMENT ..................................... 2 4.0 STORMWATER TREATMENT & DISPOSAL ............... 2 5.0 RAPID INFILTRATION PITS (RIP’s) ........................... 3 6.0 CALCULATIONS ...................................................... 3 APPENDICES APPENDIX A – Engineering Drawings APPENDIX B – RIP Management & Maintenance Plan APPENDIX C – Prototype RIP Test Results APPENDIX D – Spreadsheet Model Results APPENDIX E – Detail Survey
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
3000- Lot 7 & 8 SMP - June 2018.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.