Council archive · source document
3000- Lot 7 & 8 SMP - June 2018 · OPW18/0155
Attached to the e-mail Operational Works Application OPW18/0155 - Stormwater Management Statement, Plans - (Email 2 of 4).msg.
Pe 4B Cums.) 1.80 1.60 1.40 » 1.20 1.00 0,80 0.60 Water Depth in Pit (m) 0.40 0.20 0.00 20.0 40.0 Depth vs Time 10 Year ARI 60.0 80.0 ——5 min Storm ——— 10 min Storm 30 min Storm =—60 min Storm -———~ 120 min Storm =——6 hour Storm 100.0 120.0 Time (min) -0.20 22/06/2018 1:15PM Rapid Infiltration Pits - 4B West Comparison chart
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
3000- Lot 7 & 8 SMP - June 2018.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.