GENERAL COMMITTEE MEETING AGENDA 16 JANUARY 2017
Building Design
8. All air conditioning units or other mechanical equipment must be fully enclosed or
screened such that they are not visible from the street frontages.
9. To improve street appearance the masonry wall to the northern side of the east
elevation must incorporate a mix of materials to provide depth and interest to the
façade. Amended plans must be to the satisfaction of the Chief Executive Officer and
submitted to Council prior to the pre-start meeting for operational works.
Water & Sewer Connections
10. An underground connection to reticulated water and sewerage must be provided to the
development site in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
11. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
ENGINEERING
12. A minimum of 26 car parking spaces and 2 motor cycle spaces must be provided on
the site which includes 1 disabled space.
13. Bicycle parking spaces and end of trip facilities must be provided in accordance with
the approved plans.
14. All car parking areas and access driveways must be line marked and maintained
exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition
at all times.
15. Any awnings and/or other structures must not obstruct or impact on the function of the
loading zone.
Stormwater Drainage
16. Stormwater runoff from the development must be disposed of on-site generally in
accordance with the approved engineering plans without causing scour or damage to
the subject site or any adjoining property.
Electricity and Telecommunication Services
17. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
Landscaping Works
18. The development site must be landscaped. The works must be undertaken in
accordance with the approved landscape plans and Planning Scheme Policy PSP 3
Landscaping Plants and Guidelines.
19. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
Page 30 of 146
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.