AS PUBLISHED Negotiated Decision Notice MCU23 0094 · MCU23/0094
62. Prior to issuing of a final compliance certificate, council must receive evidence that the results
for the in-situ hydraulic conductivity testing conducted in accordance with FAWB PRACTICE
NOTE 1: In Situ Measurement of Hydraulic Conductivity Belinda Hatt, Sebastien Le
Coustumer April 2008 for the bioretention filter media achieve the design criteria.
Erosion and Sediment Control
63. A ‘for construction’ Erosion and Sediment Control Plan (E&SCP) must be provided to
Council’s Delegate at least 2 weeks prior to the on-site pre-start meeting and prior to works
commencing. The E&SCP must:
a. be prepared by a suitably qualified and experienced professional;
b. relate to each phase of the works (including clearing, earthworks, civil construction,
services installation and landscaping) and detail the type, location, sequence and
timing of measures and actions to effectively minimise erosion, manage flows and
capture sediment;
c. be consistent with current best practice standards to the extent that the standards are
not inconsistent with the conditions of approval and taking into account all
environmental constraints including erosion hazard, season, climate, soil, and
proximity to waterways;
d. provide sufficient detail regarding the manner in which compliance with all conditions
of this permit relating to E&SC is to be achieved;
e. include details of proposed flocculants and automatic dosing systems for sediment
basins, including jar testing results. Demonstrate the suitability of the proposed
flocculant having regard to the downstream receiving environment and water quality;
and
f. include the results of all soil investigations undertaken for the site and on which the
E&SCP is based
64. Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must
not be released from the site or to waters within the site, or be likely to be released should
rainfall occur, unless all reasonable and practicable measures are taken to prevent or
minimise the release and concentration of contamination. These measures must be
designed, implemented and maintained in accordance with “Best Practice Erosion and
Sediment Control” published by the International Erosion Control Association (Australasian
Chapter) (IECA, 2008), to the extent that such measures and practices are also consistent
with the following:
a. Minimise Erosion
i. Restrict the extent of clearing to that necessary for access to and safe
construction of the approved works;
ii. Protect vegetation in all other areas of the site;
iii. Minimise the duration of soil exposure by undertaking land clearing and
stabilisation according to the rainfall erosion hazard as specified in IECA (2008)
Tables 4.4.2 and 4.4.7
iv. Prior to either the approval of the plan of survey for the development or
commencement of use, all site surfaces are to be effectively stabilised using
methods that will continue to achieve effective stabilisation in the medium to long
term. For the purpose of this condition, an effectively stabilised surface is defined
as one that does not, or is not likely to result in visible evidence of soil loss caused
by sheet, rill or gully erosion or lead to sedimentation, or lead to water
contamination.
b. Manage concentrated stormwater flows
Page 23 of 31
Document Set ID: 23011984
Version: 3, Version Date: 13/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records