Original PDF page 29, section 1. The text section number identifies this passage in the reader.

                                           GENERAL NOTES                                                                                                 TOPSOIL:
                                           1.      DO NOT SCALE DRAWINGS.                                                                                8.    PRIOR TO ANY EARTHWORKS ACTIVITIES, TREE STUMPS, BUILDING DEBRIS, ORGANIC RICH TOPSOIL AND SEVERELY               11. THE CONTRACTOR SHALL MAINTAIN A WRITTEN RECORD OF DATES OF ALL INSPECTIONS INCLUDING ANY CORRECTIVE
                                           2.     ALL DISCREPANCIES SHALL BE REFERRED TO THE SUPERINTENDENT FOR CLARIFICATION BEFORE PROCEEDING.               ROOT AFFECTED AREAS MUST BE REMOVED.                                                                                  ACTIONS TAKEN.

                                           3.     THE CONTRACTOR SHALL NOTIFY THE SUPERINTENDENT IN WRITING OF ALL VARIATIONS ARISING FROM THE           9.    ORGANIC RICH TOPSOIL MUST NOT BE USED IN FILL. IT SHALL BE STOCKPILED FOR RE-USE IN LANDSCAPING OR
                                                  CLARIFICATION OF THE DISCREPANCY.                                                                            DISPOSED OF TOPSOIL STOCKPILES SHALL NOT EXCEED 2m IN HEIGHT.                                                     EXISTING PAVEMENT:
                                           4.     THE CONTRACTOR SHALL SUBMIT DETAILS OF ANY ADDITIONAL COST ARISING FROM A VARIATION TO THE                                                                                                                                     1.   WHERE PAVEMENT WIDENING IS PROPOSED, THE EXISTING PAVEMENT IS TO BE SAW CUT TO FORM THE JOINT, AS PER
                                                  SUPERINTENDENT FOR APPROVAL, BEFORE PROCEEDING WITH THE WORKS.                                         SUBSOILS:                                                                                                                    STANDARD DRAWING IPWEAQ RS-170. THE DEPTH OF THE EXISTING PAVEMENT IS TO BE CONFIRMED AS PART OF THIS
                                           5.     ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT      10.    ENSURE SUITABLE GROUND COVER IS PROVIDED TO ALL EXPOSED SUBSOILS AS SOON AS PRACTICAL, TO MINIMISE                    PROCEDURE.
                                                  AUSTRALIAN STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY            THE RISK OF SOIL EROSION, ESPECIALLY IF THE SOILS ARE DISPERSIVE.                                                 2.   ALL EXISTING PAVEMENT SURFACES ARE TO BE SWEPT CLEAN OF ALL LOOSE DEBRIS/FOREIGN MATTER PRIOR TO
                                                  AND THE SUPERINTENDENT.                                                                                                                                                                                                             APPLICATION OF SEAL.
                                           6.     NO WORK IS TO COMMENCE ON SITE UNTIL THE APPROVAL OF THE COUNCIL HAS BEEN RECEIVED IN WRITING AND AN   SUBGRADES:                                                                                                              3.   AREAS OF EXISTING PAVEMENT CONTAINING POTHOLES, TO BE SAW CUT AND REPLACED WITH DEEP LIFT ASPHALT
                                                  OFFICIAL PRE-START MEETING WITH A REPRESENTATIVE OF COUNCIL AND THE ENGINEER HAVE BEEN HELD. THE                                                                                                                                    WITH A MINIMUM THICKNESS OF 100mm.
                                                  CONTRACTOR IS TO OBTAIN A COPY OF THE MINUTES OF THE PRE-START MEETING AND SHALL COMPLY WITH THE       11. SUBGRADES IN PAVEMENT AREAS SHALL BE PROOF ROLLED USING A MINIMUM FULLY LADEN WATER TRUCK (MIN. 20
                                                                                                                                                             TONNE) AND ANY SOFT SPOTS OR UNSUITABLE MATERIALS SHALL BE EXCAVATED AND REPLACED WITH SELECT FILL.                 4.   IF UNDERLYING GRAVEL IS EXPOSED DURING MILLING OPERATIONS A PRIMER SEAL SHALL BE PLACED OVER THE
                                                  REQUIREMENTS THEREOF.                                                                                                                                                                                                               AFFECTED AREA.
                                                                                                                                                             THE SUBGRADE IS TO BE INSPECTED BY THE SUPERINTENDENT BY MEANS OF A PROOF ROLL, BY A MINIMUM FULLY
                                           7.     ALL CONSTRUCTION SHALL COMPLY WITH THE RELEVANT WORK PLACE HEALTH AND SAFETY LEGISLATION.                  LADEN WATER TRUCK (MIN. 20 TONNE), PRIOR TO PLACEMENT OF ANY PAVEMENT LAYERS. THE SUBGRADE SHALL
                                           8.     A MINIMUM OF 23 HOURS NOTICE IS REQUIRED FOR ALL ENGINEERING INSPECTIONS, WHERE POSSIBLE.                  EXHIBIT NO VISIBLE SIGNS OF DEFORMATION UNDER PROOF ROLLING.                                                        SIGNS AND LINEMARKING
                                           9.     THE WORK AREA WILL BE MINIMISED TO FACILITATE CONSTRUCTION WHILST ENABLING CONTINUAL OPERATIONS OF     12. SUBGRADE TESTS SHALL BE UNDERTAKEN AND RESULTS SUPPLIED TO THE ENGINEER, TO DETERMINE THE                           1.   ALL ROAD SIGNS AND LINEMARKING SHALL BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL
                                                  THE NEIGHBOURING AREA, TO THE SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.                            ADEQUACY OF THE PAVEMENT DEPTH DETAILED ON THE DRAWINGS.                                                                 DEVICES (MUTCD), PUBLISHED BY THE DEPARTMENT OF MAIN ROADS.
                                           10. WORKING HOURS, COMMUNICATIONS PROTOCOLS, SITE ACCESS, AREA FOR CONTRACTORS FACILITIES/STORAGE AND         13. THE SUPERINTENDENT MAY REQUEST ADDITIONAL SUBGRADE TESTING OR SUBGRADE REPLACEMENT FOLLOWING                        2.   ALL SIGNS SHALL BE SIZE 'A' UNLESS NOTED OTHERWISE.
                                               SITE SECURITY TO BE AGREED WITH THE PRINCIPAL AND SUPERINTENDENT.                                             THIS INSPECTION.
                                                                                                                                                                                                                                                                                 3.   SIGNS LOCATED WITHIN MEDIANS OR TRAFFIC ISLANDS TO BE INSTALLED USING LOC SOCKET.
                                           11. THE FOLLOWING HOLD POINT INSPECTIONS WILL BE REQUIRED;
                                                  ● CONSTRUCTION PRE-START MEETING                                                                                                                                                                                               4.   ALL SIGN FOOTINGS TO BE CONCRETE IN ACCORDANCE WITH STANDARD DRAWING IPWEAQ RS-130.
                                                                                                                                                         STOCKPILE MANAGEMENT:
                                                  ● SET OUT                                                                                                                                                                                                                      5.   ALL ROAD SIGNS TO BE OFFSET A MINIMUM OF 600mm FROM FACE OF KERB.
                                                  ● DEMOLITION                                                                                           14. CONTRACTOR TO ENSURE STOCKPILES ARE NOT LOCATED IN A POSITION WHERE THEY COULD BE WASHED INTO A
                                                                                                                                                             GUTTER, DRAIN OR WATER BODY, SUCH AS:                                                                               6.   THE FINAL SIGN LOCATION IS TO BE AGREED ON SITE, TO ENSURE IT IS VISIBLE AND NOT OBSTRUCTED BY EXISTING
                                                  ● SUBGRADE PROOF-ROLLS                                                                                                                                                                                                              INFRASTRUCTURE OR VEGETATION ETC.
                                                  ● PRE-SEAL PROOF-ROLLS                                                                                        ● ON A ROAD PAVEMENT;
                                                  ● CONCRETE PRE-POURS                                                                                          ● WITHIN AN OVERLAND FLOW PATH;                                                                                  7.   ALL SIGNS SHALL BE MANUFACTURED, AND INSTALLED IN ACCORDANCE WITH MRTS14.
                                                  ● FINAL INSPECTION                                                                                            ● ADJACENT TO STREAM BANKS.                                                                                      8.   STREET NAME SIGNS TO BE IN ACCORDANCE WITH IPWEAQ RS-130 AND RS-131.
                                                  ● ADDITIONAL HOLD POINT INSPECTIONS MAY BE REQUIRED (TO BE DETERMINED)                                 15. CONTRACTOR TO ENSURE STOCKPILES ARE ADEQUATELY STABILISED. LONG TERM STOCKPILES CAN BE COVERED
                                                                                                                                                             WITH MULCH OR TEMPORARY VEGETATION (GRASS).
                                           12. THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PLAN,                                                                                                                                             STORMWATER DRAINAGE
                                               ENVIRONMENTAL MANAGEMENT PLAN AND WORK PLACE HEALTH AND SAFETY PLAN FOR REVIEW AND APPROVAL OF            16. ENSURE APPROPRIATE DUST CONTROL MEASURES EXIST FOR ALL STOCKPILES. ENSURE AN APPROPRIATE SEDIMENT                   GENERAL
                                               PRINCIPAL AND SUPERINTENDENT, PRIOR TO CONSTRUCTION.                                                          CONTROL SYSTEM IS LOCATED DOWN-SLOPE OF ALL STOCKPILES.
                                                                                                                                                                                                                                                                                 1.   EXCAVATION, BEDDING AND BACKFILLING OF STORMWATER DRAINAGE PIPES TO BE IN ACCORDANCE WITH STANDARD
                                           13. FOLLOWING COMPLETION OF THE WORKS THE CONTRACTOR SHALL CLEAN UP THE SITE AND DEMOBILISE TO THE                                                                                                                                         DRAWING IPWEAQ DS-0030 (TYPE 2).
                                               SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.                                                         SITE REHABILITATION:                                                                                                    2.   ALL MANHOLES TO BE 1050mm DIAMETER IN ACCORDANCE WITH STANDARD DRAWING IPWEAQ DS-010.
                                                                                                                                                         17. ENSURE THE SOIL SURFACE IS SCARIFIED PRIOR TO THE PLACEMENT OF TOPSOIL TO BREAK UP ANY EXCESSIVE                    3.   ALL MANHOLE COVERS LOCATED WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS D IN ACCORDANCE WITH
                                           SURVEY                                                                                                            COMPACTION, AND ENABLE THE APPROPRIATE KEYING OF THE SOIL LAYERS.                                                        STANDARD DRAWING IPWEAQ DS-019.
                                           1.      THIS DESIGN IS BASED ON SURVEY PROVIDED BY BENNETT+BENNETT SURVEYORS.                                 18. SCARIFY LIGHTLY COMPACTED SOILS TO A MINIMUM DEPTH OF 100mm AND HEAVILY COMPACTED SUBSOILS TO A                     4.   ALL MANHOLE COVERS LOCATED NOT WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS B IN ACCORDANCE
                                                                                                                                                             MINIMUM DEPTH OF 300mm.                                                                                                  WITH STANDARD DRAWING IPWEAQ DS-020.
                                           2.     ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM (AHD).
                                                                                                                                                         19. TURF MUST NOT BE PLACED ON EXCESSIVELY COMPACTED SOILS.                                                             5.   THE CONTRACTOR IS TO CONSIDER CONSTRUCTION LOADING ON EXISTING AND NEW STORMWATER PIPES AND
                                           3.     THE CONTRACTOR SHALL CONFIRM EXISTING LEVELS, FEATURES AND UTILITIES PRIOR TO CONSTRUCTION.
                                                                                                                                                         20. ALL SITE REHABILITATION MEASURES SHOULD BE MONITORED, PARTICULARLY AFTER RAINFALL.                                       STRUCTURES.
                                           4.     ALL ELEMENTS OF PROPOSED WORK TO BE SETOUT AND CHECKED BY THE CONTRACTOR'S LICENSED SURVEYOR AND
                                                                                                                                                                                                                                                                                 6.   ALL PIPE PENETRATIONS WILL BE FLUSH AND NEATLY MORTARED ON THE INSIDE FACE OF MANHOLES AND / OR PITS.
                                                  ANY DISCREPANCIES ARE TO BE REPORTED TO THE SUPERINTENDENT.
                                                                                                                                                         EROSION & SEDIMENT CONTROL                                                                                              7.   THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL TRENCH EXCAVATION AND CONSTRUCTION IS IN
                                                                                                                                                                                                                                                                                      ACCORDANCE WITH CURRENT CONSTRUCTION SAFETY ACT AND WORKPLACE HEALTH AND SAFETY LEGISLATION.
                                           EXISTING SERVICES                                                                                             OBJECTIVES:
                                                                                                                                                                                                                                                                                 8.   THE CONTRACTOR IS TO TAKE ALL POSSIBLE MEASURES TO ENSURE PROPER COMPACTION TO BACKFILLING OF
                                           1.     THE LOCATION OF ALL IN-GROUND AND OVERHEAD SERVICES HAS BEEN DETERMINED FROM FIELD SURVEY, BEFORE      1.    THESE DRAWINGS ARE PROVIDED FOR GUIDANCE ONLY. THE CONTRACTOR SHALL ASSESS WHAT MEASURES ARE
                                                                                                                                                                                                                                                                                      TRENCHES AND STRUCTURES.
                                                  YOU DIG AUSTRALIA ENQUIRIES AND INFORMATION PROVIDED BY THE SERVICE PROVIDERS / AUTHORITIES.                 REQUIRED TO SUIT THE PROPOSED CONSTRUCTION METHODOLOGY AND STAGING. SITE SPECIFIC CONSTRUCTION ESC
                                                                                                                                                               DRAWINGS TO BE UNDERTAKEN BY CPESC IN ACCORDANCE WITH ICEA REQUIREMENTS.                                          9.   THE CONTRACTOR IS TO PROVIDE A CCTV SURVEY OF ALL NEWLY CONSTRUCTED STORMWATER DRAINAGE ASSETS
                                           2.     THE SERVICES ARE SHOWN ON THESE DRAWINGS FOR INFORMATION ONLY AND NO RESPONSIBILITY IS TAKEN FOR                                                                                                                                    FOR APPROVAL BY THE ENGINEER AND / OR LOCAL AUTHORITY.
                                                  THE ACCURACY OR COMPLETENESS OF THE INFORMATION SUPPLIED.                                              2.    THE CONTRACTOR SHALL COMPLY WITH ALL STATUTORY REGULATIONS DURING THE CONSTRUCTION PHASE AND
                                                                                                                                                               MAINTENANCE PERIOD.                                                                                               10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DEMONSTRATE HE HAS CAUSED NO DAMAGE TO EXISTING
                                           3.     NOT ALL EXISTING SERVICES HAVE NECESSARILY BEEN IDENTIFIED AND SHOWN ON THE DRAWINGS.                                                                                                                                              STORMWATER INFRASTRUCTURE DURING THE CONSTRUCTION OF THESE WORKS.
                                                                                                                                                         3.    EROSION AND SEDIMENTATION CONTROL MAY BE AIDED BY MINIMISING THE AREA OF DISTURBANCE.
                                           4.     THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING SERVICES ON THE SITE PRIOR TO COMMENCING                                                                                                                              11. ALL DEFECTS IDENTIFIED BY THE CCTV SURVEY WILL BE REPAIRED TO A SATISFACTORY STANDARD BY THE
                                                  WORKS.                                                                                                 4.    PRIOR TO THE COMMENCEMENT OF ANY WORKS ONSITE, THE CONTRACTOR SHALL PREPARE SITE SPECIFIC CPESC
                                                                                                                                                                                                                                                                                     CONTRACTOR. PAYMENT FOR THESE REPAIRS WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR, UNLESS IT
                                                                                                                                                               CERTIFIED ESC PLANS AND SUBMIT TO THE SUPERINTENDENT FOR APPROVAL.
                                           5.     NO WORK IS TO BE UNDERTAKEN OVER OR WITHIN 3m OF EXISTING SERVICES PRIOR TO NOTIFICATION TO THE                                                                                                                                    CAN BE DEMONSTRATED THAT THE IDENTIFIED DAMAGE WAS PRE-EXISTING AND THE RESPONSIBILITY OF OTHER
                                                  APPROPRIATE AUTHORITIES.                                                                                                                                                                                                           PARTIES.
                                           6.     EXISTING VALVES, HYDRANTS, PITS, ACCESS CHAMBERS AND OTHER UTILITIES SHALL BE MODIFIED WHERE           MANAGEMENT PRINCIPLES:                                                                                                  12. UPON COMPLETION ALL STORMWATER DRAINAGE INFRASTRUCTURE WILL BE CLEAR OF DEBRIS AND OTHER
                                                  NECESSARY TO SUIT FINAL FINISHED SURFACE LEVELS.                                                       4. THE MANAGEMENT PRINCIPLES EMPLOYED IN THESE DRAWINGS ARE GENERALLY IN ACCORDANCE WITH THE 'BEST                          BLOCKAGES.
                                                                                                                                                         PRACTICE EROSION AND SEDIMENT CONTROL' MANUAL, PUBLISHED BY THE INTERNATIONAL EROSION CONTROL
                                                                                                                                                         ASSOCIATION (IECA). THE BASIC PRINCIPLES ARE TO:
                                           CLEARING, GRUBBING AND DISPOSAL                                                                                                                                                                                                       SUBSOIL DRAINAGE
                                                                                                                                                             ●     MINIMISE THE AREA OF DISTURBANCE;
                                           1.     CLEARING SHALL NOT OCCUR UNLESS PRECEDED BY THE INSTALLATION OF ALL NECESSARY EROSION AND SEDIMENT         ●     CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE;                                             13. SUBSOIL DRAINS SHALL BE SUPPLIED AND CONSTRUCTED IN ACCORDANCE WITH MRTS03.
                                                  CONTROL MEASURES. THE EXCEPTION WOULD BE ANY CLEARING NECESSARY TO ALLOW INSTALLATION OF THESE             ●     MINIMISE EROSION;                                                                                             14. SUBSOIL DRAINS ARE TO BE GRADED AT 1% MINIMUM (DESIRABLE) AND 0.5% (MINIMUM).
                                                  CONTROL MEASURES.                                                                                          ●     MINIMISE SEDIMENTATION;
                                                                                                                                                                                                                                                                                 15. SUBSOIL FLUSHING POINTS ARE TO BE PLACED AT A MAXIMUM DISTANCE OF 50m.
                                           2.     CLEARING SHALL BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.                             ●     PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE.
                                                                                                                                                             ·     RELEVANT DECISION NOTICE CONDITIONS.                                                                          16. THE MAXIMUM LENGTH OF ANY SUBSOIL DRAINAGE LINE SHALL BE 100m.
                                           3.     ESTABLISH ANY NON-DISTURBANCE OR EXCLUSION AREAS IDENTIFIED.
                                                                                                                                                                                                                                                                                 17. THE CONTRACTOR SHALL ENSURE THAT ANY EXISTING SUBSOIL DRAINS HAVE AN APPROPRIATE OUTLET.
                                           4.     WHERE APPROPRIATE, IDENTIFY, ISOLATE AND/OR PROTECT RETAINED VEGETATION.
                                                                                                                                                         CONSTRUCTION PRE-START MEETING:
                                           5.     CLEARING SHALL BE MINIMISED TO ONLY THE TREES AND VEGETATION NECESSARY TO UNDERTAKE THESE WORKS.
                                                                                                                                                         5.    THE CONSTRUCTION PRE-START MEETING IS AN OPPORTUNITY FOR ALL PARTIES TO DISCUSS CRITICAL ISSUES, SUCH
                                           6.     A SPOTTER-CATCHER SHALL BE PRESENT DURING ALL CLEARING OPERATIONS.
                                                                                                                                                               AS:
                                           7.     CLEARING AND GRUBBING INCLUDES REMOVAL OF THE MAIN TREE ROOTS TO A MINIMUM DEPTH OF 1.0m AND THE                 ● KEY OBJECTIVES OF THE EROSION AND SEDIMENT CONTROL PLAN;
                                                  REMOVAL OF SURFACE ROOTS AND VEGETABLE MATTER FROM THE TOP 0.3m BELOW THE NATURAL SURFACE LEVEL.                 ● REQUIRED WATER QUALITY OBJECTIVES;
                                           8.     DISPOSAL OF ALL CLEARED VEGETATION AND RUBBISH SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE               ● PERFORMANCE MONITORING AND INSPECTION PROCEDURES;
                                                  LOCAL AUTHORITY.                                                                                                 ● IDENTIFICATION OF THE RESPONSIBLE SITE OFFICERS;
                                                                                                                                                                   ● IDENTIFICATION OF CRITICAL ENVIRONMENTAL CONCERNS;
                                           9.     CLEARED VEGETATION CAN BE PROCESSED THROUGH WOOD CHIPPING AND THE MULCH PRODUCED PLACED IN
                                                                                                                                                                   ● REPORTING PROCEDURES FOR NON-COMPLIANCE ACTIVITIES AND EVENTS.
                                                  INTERIM STOCKPILES FOR LATER USE IN EROSION AND SEDIMENT CONTROL OR LANDSCAPING PURPOSES.
                                                                                                                                                         ●     RELEVANT DECISION NOTICE CONDITIONS.

                                           EARTHWORKS / EXCAVATION
                                                                                                                                                         SITE INSPECTION AND MONITORING:
                                       GENERAL:
                                                                                                                                                         6.    CONTRACTOR SHALL NOMINATE A PERSON RESPONSIBLE FOR INSTALLATION, MONITORING AND MAINTENANCE OF
                                           1.      ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND MARKED PRIOR TO COMMENCEMENT OF EXCAVATION.
                                                                                                                                                               CONTROL MEASURES (E.G. SITE FOREMAN).
                                           2.     ALL EARTHWORKS ACTIVITIES INCLUDING STRIPPING, EXCAVATION, FILLING, COMPACTION AND TESTING, IS TO BE
                                                                                                                                                         7.    ALL EROSION AND SEDIMENT CONTROL MEASURES SHOULD BE INSPECTED:
                                                  UNDERTAKEN IN ACCORDANCE WITH MRTS04, THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT AUSTRALIAN
                                                                                                                                                                   ● AT LEAST DAILY WHEN RAIN IS OCCURRING;
                                                  STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY AND THE
                                                                                                                                                                   ● AT LEAST WEEKLY (EVEN IF WORK IS NOT OCCURRING ON-SITE);
                                                  ENGINEER.
                                                                                                                                                                   ● WITHIN 24 HOURS PRIOR TO EXPECTED RAINFALL;
                                           3.     STOCKPILES SHALL BE PROPERLY STABILISED.                                                                         ● WITHIN 18 HOURS OF A RAINFALL EVENT.
                                           4.     EARTHWORKS SHALL AVOID THE EROSION OR SILTATION OF ADJOINING LANDS, STREAMS OR WATERCOURSES.           8.    CONTRACTOR TO CHECK AFTER RAINFALL FOR PERFORMANCE INDICATORS SUCH AS EVIDENCE OF EXCESSIVE FLOW
                                           5.     ALL EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND FULLY OPERATIONAL PRIOR TO COMMENCEMENT OF             CONCENTRATIONS, EROSION PATHS DEVELOPING, SILT AND SEDIMENT ACCUMULATION.
                                                  EARTHWORKS.                                                                                            9.    CONTRACTOR TO CHECK DURING RAIN THAT FLOWS ARE NOT BYPASSING CONTROL MEASURES.
                                           6.     EARTHWORKS SHALL BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.                       10. WHEN A SITE INSPECTION DETECTS A NOTABLE FAILURE IN THE ADOPTED MEASURES, THE SOURCE OF THIS FAILURE
                                           7.     ALL FILLING TO BE UNDERTAKEN UNDER LEVEL 1 SUPERVISION.                                                    MUST BE INVESTIGATED AND THE APPROPRIATE AMENDMENTS MADE TO THE SITE CONTROLS.




COPYRIGHT ©                                                                                       Associated Consultants           Client                                                                                         Drawn         Verified       Project                                                             Drawing Title                                                 Scale            Sheet Size
                                                                                                                                                                                                                                  M.K.P.        D.R.
This drawing is subject to
copyright in accordance with                                                                                                       DEVTEX NOMINEES                                                                                                             73-77 EUMUNDI-NOOSA ROAD                                            GENERAL NOTES                                                  AS SHOWN            A1
the agreement between TOD                                                                                                                                                                                                         Designed      Verified
Consulting Pty Ltd (tc) and tc's                                                                                                   PTY LTD                                                                                        M.K.P.        D.R.           NOOSAVILLE, QLD 4566                                                                                                              Drawing Number
client. This drawing shall only
be used for this specific project.                                                                                                                                                                                                Approved      RPEQ No        RP DESCRIPTION  LOTS 1, 2 3, 48, 49 AND 50 ON SP298783                                                                                    24572-C011
This drawing shall not be used                                                                                                                                           Noosa: 07 5449 9600       Sunshine Coast: 07 5329 3190   D. REYNOLDS   9072           LOCAL AUTHORITY NOOSA SHIRE COUNCIL
                                                                                                                                                                                                                                                               MCU APPROVAL                             HORIZ DATUM MGA DERIVED                    0     10     20     30    40     50      60   Sheet             Revision
for construction until marked as                                                                                                                                                    PO Box 61, Noosaville, QLD 4566               Signed
                                      A         23.01.25   ISSUED FOR APPROVAL             MKP                                                                                                                                                                 ROL APPROVAL                             VERT DATUM RL.13.595 AHD
'Issued For Construction' in the
revision description.                Rev         Date      Revision Description           Drawn
                                                                                                                                                                         [email protected]     www.todconsulting.com
                                                                                                                                                                                         ABN 39 128 805 336                                     23.01.25       OPW APPROVAL                             RL DATUM      PSM 53205                        MEASUREMENT BAR - INCREMENTS IN mm            2 OF 23          A
Log in to download the original file

REPS - Updated SWMP.pdf · 15.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.