Original source · versioned page text
Design Plans
Plans and drawings: the text below has words only, no drawings.
3 2 1
DD-3.09 DD-3.09 DD-3.09
GF CEILING
600
GF JOINERY
0906 / 15CW
3000
1220 GLASS DOOR 1218 LV/LV 1209 LV OBS.
2400
2427PLD 2409FG 1200 GLASS 0609FG
GF FFL
1 - NORTH ELEVATION - STUDIO
SCALE 1 : 100
1
2 3
DD-3.09
DD-3.09 DD-3.09
GF CEILING
600
GF JOINERY
1220 GLASS DOOR
3000
2439SGD 2424SGD 2454SGD 2409 LV OBS. 2424SGD
2400
GF FFL
2 - SOUTH ELEVATION - STUDIO
SCALE 1 : 100
0 1 2 3 4 5m
DATE ISSUE / AMENDMENT PROJECT TITLE
ELEVATIONS - STUDIO
04.10.2024
28.10.2024
1
2
CONCEPT FLOOR PLAN
DD ISSUE
27 SIVYERS ROAD
25.03.2025 6 DD ISSUE
10.04.2025 7 DD ISSUE
07.05.2025 8 DD ISSUE TINBEERWAH, QLD
DATE
07.05.2025
USE FIGURED DIMENSIONS. DO NOT SCALE FROM THE DRAWINGS. SCALE
CONFIRM ALL DIMENSIONS ON SITE PRIOR TO CONSTRUCTION OR
As indicated
PROJ No
FABRICATION, ANY DISCREPENSIES TO BE NOTIFIED TO THE DESIGN
AUTHORITY. IT REMAINS THE CONTRACTORS RESPONSIBILITY TO
24-066 DRAWN
BMR
CHECKED
DC
ENSURE COMPLIANCE WITH ALL RELEVANT CODES AND
DRAWING No ISSUE
REGULATIONS IS MAINTAINED AT ALL TIMES.
SUBJECT TO LOCAL COVENANT & BUILDING APPROVAL.
C:\Users\Brooke\DCM Building Design\CompanyData - Documents\PROJECTS\01 - CURRENT PROJECTS\24-066 - 27 Sivyers Rd,
Tinbeerwah\MODEL\DD Model\24-066 - 27 Sivyers Rd, Tinbeerwah - DD.rvt 12/06/2025 12:14:03 PM
Phone: 07 5493 2587 Email: [email protected]
Website: www.dcmbuildingdesign.com.au QBCC: 15027404
CLIENT
JULIE JORDAN & DAMIEN MCBAIN DD-3.07 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.