Original source · versioned page text
Design Plans
Plans and drawings: the text below has words only, no drawings.
27 SIVYERS ROAD, TINBEERWAH, QLD - PROPOSED DWELLING - DD ISSUE DRAWING LIST - DESIGN DEVELOPMENT CURRENT SHEET # SHEET NAME REV. DATE DESCRIPTION DD-0.01 COVER SHEET 8 07.05.2025 DD ISSUE DD-0.02 ARTIST IMPRESSION 1 8 07.05.2025 DD ISSUE DD-0.04 ARTIST IMPRESSION 2 8 07.05.2025 DD ISSUE DD-0.05 ARTIST IMPRESSION 3 8 07.05.2025 DD ISSUE DD-1.01 SITE PLAN - OVERALL 8 07.05.2025 DD ISSUE DD-1.02 SITE PLAN - PARTIAL 8 07.05.2025 DD ISSUE DD-2.01 GROUND FLOOR PLAN - OVERALL 8 07.05.2025 DD ISSUE DD-2.02 GROUND FLOOR - PROPOSED (MAIN HOUSE) 8 07.05.2025 DD ISSUE DD-2.03 GROUND FLOOR - PROPOSED (STUDIO) 8 07.05.2025 DD ISSUE DD-2.04 GROUND FLOOR PLAN - EXISTING + DEMO PLAN 8 07.05.2025 DD ISSUE DD-2.05 EXISTING + DEMO + PROPOSED PLAN 8 07.05.2025 DD ISSUE DD-3.01 3D ELEVATIONS 1 - MAIN HOUSE 8 07.05.2025 DD ISSUE DD-3.02 ELEVATIONS 1 - MAIN HOUSE 8 07.05.2025 DD ISSUE DD-3.03 ELEVATIONS 2 - MAIN HOUSE 8 07.05.2025 DD ISSUE DD-3.04 SECTIONS - MAIN HOUSE 8 07.05.2025 DD ISSUE DD-3.05 3D ELEVATIONS 1 - STUDIO 8 07.05.2025 DD ISSUE DD-3.06 3D ELEVATIONS 2 - STUDIO 8 07.05.2025 DD ISSUE DD-3.07 ELEVATIONS - STUDIO 8 07.05.2025 DD ISSUE DD-3.08 ELEVATIONS & SECTIONS - STUDIO 8 07.05.2025 DD ISSUE DD-3.09 SECTIONS - STUDIO 8 07.05.2025 DD ISSUE DD-4.02 3D ELEVATIONS - OVERALL 8 07.05.2025 DD ISSUE DD-5.01 EXTERIOR 3D VIEW 8 07.05.2025 DD ISSUE DD-5.02 SUN STUDY - MAIN HOUSE 8 07.05.2025 DD ISSUE DD-5.03 INTERIOR VIEWS - MAIN HOUSE 8 07.05.2025 DD ISSUE DD-5.04 INTERIOR VIEWS - STUDIO 8 07.05.2025 DD ISSUE DATE ISSUE / AMENDMENT PROJECT TITLE COVER SHEET 04.10.2024 28.10.2024 1 2 CONCEPT FLOOR PLAN DD ISSUE 27 SIVYERS ROAD 25.03.2025 6 DD ISSUE 10.04.2025 7 DD ISSUE 07.05.2025 8 DD ISSUE TINBEERWAH, QLD DATE 07.05.2025 USE FIGURED DIMENSIONS. DO NOT SCALE FROM THE DRAWINGS. SCALE CONFIRM ALL DIMENSIONS ON SITE PRIOR TO CONSTRUCTION OR 1 : 100 PROJ No FABRICATION, ANY DISCREPENSIES TO BE NOTIFIED TO THE DESIGN AUTHORITY. IT REMAINS THE CONTRACTORS RESPONSIBILITY TO 24-066 DRAWN BMR CHECKED DC ENSURE COMPLIANCE WITH ALL RELEVANT CODES AND DRAWING No ISSUE REGULATIONS IS MAINTAINED AT ALL TIMES. SUBJECT TO LOCAL COVENANT & BUILDING APPROVAL. C:\Users\Brooke\DCM Building Design\CompanyData - Documents\PROJECTS\01 - CURRENT PROJECTS\24-066 - 27 Sivyers Rd, Tinbeerwah\MODEL\DD Model\24-066 - 27 Sivyers Rd, Tinbeerwah - DD.rvt 12/06/2025 12:13:38 PM Phone: 07 5493 2587 Email: [email protected] Website: www.dcmbuildingdesign.com.au QBCC: 15027404 CLIENT JULIE JORDAN & DAMIEN MCBAIN DD-0.01 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.