GENERAL COMMITTEE MEETING                                                            17 JULY 2023


6.1     FINANCIAL PERFORMANCE REPORT – JUNE 2023


Author                Financial Services Manager (Acting), Pauline Coles
                      Corporate Services Department
Index                 ECM/ Subject / 22.09 – Monthly Financial Performance Report
Attachments           1.   Attachment 1 Statement of Income and Expenditure - Jun 2023
                      2.   Attachment 2 Statement of Financial Position - Jun 2023
                      3.   Attachment 3 Statement of Cashflows - Jun 2023
                      4.   Attachment 4 Key Materials & Services Expenditure - Jun 2023


EXECUTIVE SUMMARY
Financial performance for the 2022/23 year has resulted in an interim operating position of $10.0
million, capital revenue of $40.6 million and capital expenditure of $46.6 million.

Note that this is only an interim position, year-end financial adjustments are still in progress
which may have material impacts to the interim financial position. A further report on the final
2022/23 financial performance will be provided to Council in November 2023 following the
finalisation and independent audit of the financial statements in October 2023.




* Reflects constructed assets and intangibles only (excludes contributed)


The $9.8 million full year operating surplus comprises $5.4 million general operating surplus
from activities that are funded through Council’s general rate, regulatory fees and sales of goods
and services; as well an additional $0.1 million from holiday park operations, and $4.4 million in
unspent levy and separate charge funds which are constrained in reserve for future use. This
was offset by a small operating deficit of $0.1 million in waste operations. The general operating
surplus position is also augmented by a number of incomplete grant-funded programs.




* Includes Waste and Holiday Park operations as shown in the table below

Council elected to apply National Competition Policy (NCP) reforms to its Waste Management and
Holiday Parks which provides greater transparency and assists with removing anti-competitive
conduct and ensure the best allocation of Council's limited resources.
Log in to download the original file

FINANCIAL PERFORMANCE REPORT.pdf · 841 KB (small file)

Full text of the other 15 pages

Page 2

GENERAL COMMITTEE MEETING                                                           17 JULY 2023


A summary of the interim operational performance of these business activities for the year end 30th
June 2023 are outlined below.




Financial statements including Statement of Income & Expenditure, Statement of Financial Position
(balance sheet), and Statement of Cash Flows are included as attachments for information for
Council.

Figure 1: Actual Performance Compared to Budget




Council’s performance against key measures of financial sustainability has been calculated as at
June 2023. These statutory indicators enable the reader to assess Council’s success in managing
its budget, cash and debt as well as undertaking sustainable asset management. The table below
contains a snapshot of a number of key measures, with full detail included in the report.

 YTD Measures of Financial Sustainability

                                                Current
                                 Target                       Actual YTD         Status
                                                Budget
 Operating Surplus Ratio         0-10%            0.1%           8.0%           On Track
 Net Financial Liabilities
                                                                                On Track
 Ratio                            <60%           -12.8%         -33.6%
 Cash Cover Ratio               3 months      10.3 months     14.1 months       On Track
 Asset Sustainability Ratio      > 90%           176.7%         163.8%          On Track


RECOMMENDATION
That Council note the report by the Manager Financial Services (Acting) to the General Committee
Meeting dated 17 July 2023 outlining the interim 2022/23 full year financial performance against
budget, including key financial sustainability indicators.


REPORT
Operating Revenue (YTD Benchmark 100.0%)
Council has received 102.9% ($126.3 million) of its operating revenue budget ($122.7 million).
Commentary on each revenue category is provided below.

Page 3

GENERAL COMMITTEE MEETING                                                               17 JULY 2023


Category            Summary                   Comments
Rates and Levies    $83.2 million (100.0%)       •   Overall total rates and levies earned are in line
                    of the annual budget of          with the annual budget
                    $83.2 million has been
                    earned
Fees and Charges    $8.2 million (95.4%) of      •   Development Assessment $187.3k below
                    the annual budget of             budget (92.2% or $2.2 million of $2.4 million
                    $8.7 million has been            annual budget earned)
                    earned                       •   Building fees $112.0k below budget (87.3% or
                                                     $770.0k of $882.2k annual budget earned)
                                                 •   Plumbing fees $41.2k below budget (96.8% or
                                                     $1.2 million of $1.3 million annual budget
                                                     earned)
                                                 •   Local Laws $66.3k below budget (95.9% or
                                                     $1.5 million of $1.6 million annual budget
                                                     earned)
                                                 •   Waste Management $45.6k below budget
                                                     (95.27% of $918.8k of $964.4k annual budget
                                                     earned)
Sale of Goods and   $13.9 million (105.1%)       •   Holiday Park revenue $406.1k above budget
Services            of the annual budget of          (110.26% or $4.3 million of $4.0 million annual
                    $13.2 million has been           budget earned). Any revenue upside will be
                    earned                           generally offset by a corresponding increase in
                                                     associated operating costs
                                                 •   Community Facility fees $270.0k above
                                                     budget (108.7% or $3.4 million of $3.1 million
                                                     annual budget earned)
Interest Received   $4.4 million (138.5%)        •   Interest revenues continue to track above
                    of the $3.2 million              budget with Council investing surplus cash in
                    annual budget has                high yielding term deposits to maximise the
                    been earned                      return on its cash holdings. The interest rate
                                                     on the QTC and CBA facilities has also
                                                     increased in line with market pressures
                                                     generating increased interest revenue.
Other Revenue       $3.6 million (134.8%)        •   Waste Management sundry revenue $107.7k
                    of the $2.7 million              above budget (147.3% or $335.5k of $227.8k
                    annual budget has                annual budget earned)
                    been earned                  •   Community Facility revenue $71.3k above
                                                     budget (116.5% or $503.3k of $431.9k annual
                                                     budget earned)
                                                 •   Properties and Facilities revenue is $127.7k
                                                     above budget due to the receipt of an
                                                     insurance reimbursement for damage to
                                                     Council properties from the February 2022
                                                     flood event.
Operating Grants,   $6.9 million (120.9%)        •   Operating Grants and subsidies are above
Subsidies           of the $5.7 million              budget expectations due to the receipt of a
                    annual budget has                QRA Local Economic Recovery Grant, QRA
                    been received                    Emergent Works and Disaster Funding,
                                                     Queensland Arts Showcase Program Grant,
                                                     Illegal Dumping Grant, Eco-Certified Tourism
                                                     Destination Program and Public Health
                                                     Network Grant.
                                                 •   100% ($2.0 million) of the financial assistance
                                                     grant in respect to the FY 2023/24 year was
                                                     prepaid in June 2023. In previous years this
                                                     prepayment has been 50-75%. As such this
                                                     may impact on Council’s 2023/24 final

Page 4

GENERAL COMMITTEE MEETING                                                              17 JULY 2023


 Category            Summary                 Comments
                                                   operating position if the prepayment approach
                                                   is discontinued by the Australian government.
 Unitywater          On track                   • Unitywater distributions are fixed each year so
 Distributions                                     there is limited budget variance risk


Figure 2: Operating Revenue Position by Type (Excluding Rates)




Operating Expenditure (YTD Benchmark 100.0%)
Actual operating expenditure is currently 94.9% ($116.2 million) of full year budget ($122.5
million). Detailed commentary for each expenditure category is provided below.
 Category            Summary                        Comments
 Employee Costs      $41.4 million (97.5%) of the      •   Expenditure for permanent staff salaries
                     annual budget of $42.4                and wages underspent ($2.3 million) due
                     million has been expended             to position vacancies, partially offset by
                                                           additional spend on casual staff and
                                                           external labour hire ($1.4 million).
                                                       •   Training costs $23.8k under full year
                                                           budget (93.6% or $350.3k of $374.0k
                                                           annual budget spent)
 Materials and       $53.6 million (91.1%) of the      •   Civil Operations $408.5k above budget
 Services            $58.9 million annual budget           (104.7% or $9.1 million of $8.7 million
                     has been expended.                    annual budget spent)
                                                       •   Holiday Parks $306.1k above budget
                                                           (113.2% or $2.6 million of $2.3 million
                                                           annual budget spent) – offset by additional
                                                           revenue.
                                                       •   Community Facilities $94.5k above budget
                                                           (103.8% or $2.6 million of $2.5 million
                                                           annual budget spent)
                                                       •   Governance $53.5k above budget
                                                           (106.3% or $902.4k of $848.9k annual
                                                           budget spent)
                                                       •   Environmental Services $1.9 million below
                                                           budget (61.2% or $3.1 million of $5.0
                                                           million annual budget spent) Note: $420k
                                                           relates to levy funded projects any net
                                                           balance of levy funds will be transferred to
                                                           reserves for future use.
                                                       •   Asset Management $557.9k below budget
                                                           (57.2% or $744.5k of $1.3 million annual
                                                           budget spent) Note: $476.4k relates to
                                                           levy funded projects any net balance of

Page 5

GENERAL COMMITTEE MEETING                                                17 JULY 2023


Category        Summary              Comments
                                           levy funds will be transferred to reserves
                                           for future use.
                                        • Library and Galleries $480.5k below
                                           budget (77.5% or $1.6 million of $2.1
                                           million annual budget spent) Note:
                                           $213.4k relates to levy funded projects any
                                           net balance of levy funds will be
                                           transferred to reserves for future use.
                                        • Strategic Land Use Planning $429.1k
                                           below budget (41.6% or $305.7k of
                                           $734.8k annual budget spent.
                                        • Sustainable Transport program $280.6k
                                           below budget (73.4% or $775.9k of a $1.0
                                           million annual budget spent) Note: any
                                           balance of levy funded projects will be
                                           transferred to reserves for future use
                                        • Economic Development $178.7k below
                                           budget (95.4% or $3.7 million of $3.9
                                           million annual budget spent)
                                        • Digital Hub $98.7k below budget (84.9% or
                                           $553.1k of $651.8k annual budget spent)
                                        • Information Communication & Technology
                                           $251.4l below budget (93.9% or $3.9
                                           million of $4.1 million annual budget spent)
                                        • Infrastructure Planning, Design & Delivery
                                           $208.7k below budget (51.5% or $221.2k
                                           of $429.9k annual budget spent)
                                        • Building and Facilities $206.1k below
                                           budget (81.1% or $883.7k of $1.1 million
                                           annual budget spent)
                                        • Waste Management $194.5 below budget
                                           (98.5% or $13.0 million of $13.2 million
                                           annual budget spent)
                                        • Development Assessment $189.7k below
                                           budget (86.3% or $1.2 million of $1.4
                                           million annual budget spent)
                                        • Procurement $177.8k below budget
                                           (87.0% or $1.2 million of $1.4 million
                                           annual budget spent)
                                        • Community Development $173.5k below
                                           budget (87.9% or $1.2 million of $1.4
                                           million annual budget spent)
                                        • Fleet $86.2k below budget (94.0% or $1.3
                                           million of $1.4 million annual budget spent)
                                        • Council properties $69.4k below budget
                                           (88.0% or $505.8k of $574.9k annual
                                           budget spent)
Finance Costs   Currently on track      • Whilst existing loan borrowings are set
                                           with fixed interest rates, any further RBA
                                           rate rises will impact finance costs on new
                                           loan borrowings.
Depreciation    Currently on track      • Current inflationary conditions for
                                           construction inputs will continue to impact
                                           the value of Council’s infrastructure assets
                                           and depreciation. The annual asset
                                           revaluation cycle will quantify the financial
                                           risk by end of financial year.

Page 6

GENERAL COMMITTEE MEETING                                                           17 JULY 2023


 Category            Summary                       Comments
 Other Expenses      Currently on track            Nil


Figure 3: Operating Expenditure Position by Type




Tourism and Economic Development Investment Summary
Council resolved to report on a monthly basis, investment details for tourism and economic
development. Expenditure at 30 June 2023 is outlined below:


 Expenditure                Annual Budget          FY Actual        Variance
                                      $m                 $m              $m
 Payment    to    Tourism                                                   -
                                      $2.65              $2.65
 Noosa
 Economic Development                 $1.27              $1.09          $0.18

 Total                                $3.92              $3.74          $0.18


All instalments payable under the Tourism Noosa agreement for the 2022-23 financial year have
been made. The renewal of the Tourism Noosa agreement was endorsed by Council at the April
Ordinary Meeting.

Economic Development expenditure is slightly under the full year budget with the development of
the Destination Management Plan progressing.

Tourism and economic development activity is funded through the general rate, with 5.8% of the
annual general rate committed towards tourism and economic development. Should actual general
rate revenue fall below budget, this does not impact Council’s contractual commitment to fully fund
its contribution to Tourism Noosa and all associated tourism activity. Any general rate revenue
shortfall is funded through other general revenue sources to ensure all planned activities are
undertaken in full.

Page 7

GENERAL COMMITTEE MEETING                                                        17 JULY 2023


Legal Cost Summary
An update on legal costs and associated expenditure is provided on a quarterly
basis. Expenditure as at 30 June 2023 is outlined below.




Legal and associated costs are $26.5k below budget (98.6% or $1.59 million of $1.61 million of
annual budget spent).

Consultancy Cost Summary
Council requested an overview of expenditure on consultancy costs at the General Committee
Meeting on the 15th May 2023. Expenditure as at 30 June 2023 is outlined below.

Page 8

GENERAL COMMITTEE MEETING                                                             17 JULY 2023




Consultancy costs are $488.3k below budget (77.2% or $1.6 million of $2.1 million of annual budget
spent).

The requirement for expenditure on external consultancy is dependent on the type and specialist
nature of projects being undertaken and may fluctuate as a result. They may also relate to initiatives
underway during 2023/23, not yet complete and some may carry over into 2023/24.

Note: the above amounts relate to operational projects only and do not reflect consultancy
expenditure incurred in respect to capital projects.

Capital Revenue
Full Year Capital revenue of $40.6 million received comprises cash contributions from
developers ($3.2 million) and capital grants ($36.9 million). Note that the timing of capital grant
receipts are generally dependent on the timing of grant conditions and also capital delivery
performance, and that the timing of the receipt of developer contributions (both cash and
contributed) is unpredictable.

Council has received funding approval from the Queensland Reconstruction Authority for
reconstruction works relating to the Black Mountain landslip and several other flood impacted
sites, which occurred during the February 2022 rain event. Following this approval, Council has
received upfront payments of $23.9 million to fund these works.

Figure 4: Capital Revenue by Type

Page 9

GENERAL COMMITTEE MEETING                                                        17 JULY 2023




Capital Program
Actual capital expenditure (excluding commitments) is $46.6 million (FY budget $56.6 million).
Detailed discussion of progress in the delivery of the capital works program is provided through
a separate quarterly report by the infrastructure team.

Figure 5: Capital Program Delivery Performance




Cash Management and Investment Performance
Total cash on hand at the end of June was $115.4 million. Included in this balance are funds
held in trust and for restricted purposes (e.g. unexpended levy and grant funds), prepaid grants
including the financial assistance grant, QRA disaster funding and other capital works grants,
prepayment of Waste Levy subsidy (4 years), and unspent monies committed for funding capital
projects which are underway and will continue during the financial year.

The following pie charts present the mix of cash held at June 2023 by agency (graph on the left)
and by credit risk rating (graph on the right). All funds have been invested in accordance with
the Investment Policy and in consideration of the principles of ethical investment, preservation
of capital, return on investment and counterparty thresholds.


Figure 6: Closing Cash Held by Agency and Credit Rating

Page 10

GENERAL COMMITTEE MEETING                                                        17 JULY 2023




The following chart monitors the 12 month trend on total cash and the agencies invested. To
maximise the return on in its cash holdings Council has invested $50 million in higher yielding
term deposits. These investments were made in line with Council’s Investment of Surplus Funds
policy.

Figure 7: 12 Month Trend of Cash Invested by Agency




Quarterly Supplementary Information - Cash Components

An update detailing the composition of Council’s cash reserves is provided quarterly. Council’s
cash balance comprises a number of components – restricted cash (reserves), committed cash,
financial sustainability requirements and unrestricted cash. These are outlined below.

Restricted Cash - In accordance with Council’s Management of Restricted Cash Policy, funds
are set aside and restricted for a specific purpose. This can be either to meet regulatory
requirements, allocate against specific future projects and activities, and to ensure sufficient
working capital to meet current and long term financial obligations.

Page 11

GENERAL COMMITTEE MEETING                                                               17 JULY 2023


Committed Cash - A portion of cash reserves are committed to undertake current year capital
works. At the start of the financial year, this commitment will be increased for any unfinished
capital works from previous year which are carried over as part of the budget review process to
ensure the projects can be completed.

Sustainability Requirement – Cash expense cover is a key statutory indicator to measure
liquidity, ensure going concern and is a key measure considered in Council achieving its current
credit rating (Sound with a Neutral Outlook) to ensure borrowing capacity. Cash expense cover
calculates how long Council can continue to pay its day-to-day expenses without needing to
seek borrowings or other external funding. A target minimum of three month’s cash cover is to
be held in any given financial year to minimise financial risk.

Unrestricted Cash – These are funds where there is no regulatory, policy or budgetary
commitment to retain funds for specific purposes. These funds can be separated into the
following:
    •   Working Capital – The cycle of revenue received twice yearly through rates that is held in
        the bank and spent over the following six months on operations and capital.
    •   Long Term Surplus – Uncommitted cash set aside to fund the 10-year capital works
        program.

Overall, Council’s $115.4 million total cash balance compromises:
        •   $51 million (44%) in restricted cash. This has increased since the previous quarter by
            $11 million relating to advance payment for QRA Feb 22 flood event disaster works
            (Black Mountain) and a total of $4.0 million expended year to date.
        •   $19 million (17%) committed for capital works, comprising $9 million current year projects
            pushed to FY 2024 and $10 million expected to carryover from projects currently
            underway.
        •   $7 million in working capital to pay for operations until the next rates and levies issue in
            July.
        •   $5 million (4%) in unrestricted free cash, which is the cash available to fund emergent or
            new capital works projects. There is no funding to replenish this unless Council generates
            a surplus operating position.
        •   $9 million (8%) in interim operating result, which is higher than forecast, but subject to
            the finalisation of levy and reserve balances and accounting adjustments and allocations
            being finalised.

Figure 7: 12 Allocation of Cash Balances

Page 12

GENERAL COMMITTEE MEETING                                                            17 JULY 2023




Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current emerging risks regarding
performance noting the early stage of the financial year.

 Category                                                      Comments
 Operating Surplus Ratio                                           •   Intent: Identifies the extent
                                                                       to which revenues cover
                                                                       operational expenses, to
                                                                       ensure community equity is
                                                                       not degraded
                                                                   •   Target: 0 – 10%
                                                                   •   Result: 8.0%
                                                                   •   Comment: Strong sales,
                                                                       increased interest and grant
                                                                       revenue,           operational
                                                                       savings, unspent levies and
                                                                       grants have contributed
                                                                       toward a positive interim
                                                                       annual result.
 Cash Expense Cover                                                •   Intent: Indicates how long
                                                                       council can continue paying
                                                                       its day-to-day expenses
                                                                       from cash at bank without
                                                                       needing additional cash
                                                                       flows. Note this is calculated
                                                                       based on total cash, and
                                                                       includes both restricted and
                                                                       unrestricted             cash
                                                                       components.

Page 13

GENERAL COMMITTEE MEETING                             17 JULY 2023


Category                          Comments
                                     • Target: > 3 months
                                     • Result: 14.1 months
                                      • Comment: Whilst interim
                                          annual cash cover result is
                                          well above target, this
                                          includes committed cash for
                                          capital programs, unspent
                                          grant monies paid in
                                          advance,      Waste     Levy
                                          subsidy prepayments and
                                          QRA advance payments for
                                          disaster projects
Asset Sustainability Ratio           •   Intent: Measures the extent
                                         to which assets are being
                                         replaced as their condition
                                         degrades to ensure service
                                         potential is maintained
                                     •   Target: 90% of depreciation
                                         budget spent on renewals
                                         annually
                                     •   Result: In line with budget
                                     •   Comment: The ratio will
                                         progressively increase each
                                         month as expenditure on
                                         renewals occurs as part of
                                         the capital works program.
Net Financial Liabilities Ratio      •   Intent: Outlines the level
                                         that net Council debt can be
                                         serviced      by    operating
                                         revenues. A ratio below zero
                                         implies that liabilities are
                                         less than cash (and other
                                         current assets) and there is
                                         adequate            borrowing
                                         capacity available if needed.
                                     •   Target: less than 60%
                                     •   Result: -33.6%
                                     •   Comment: Council has low
                                         debt levels and strong cash
                                         holdings which are reflected
                                         in the annual result.
Investment Return                    •   Intent: Ensure appropriate
                                         return on investment yield
                                         for cash at bank.
                                     •   Target: 0.25%           above
                                         current            Bloomberg
                                         commonwealth          10-year
                                         bond rate yield (3.40%)
                                     •   Result: 4.21%
                                     •   Comment: With bond rates
                                         rising, Council has invested
                                         surplus cash in higher
                                         yielding term deposits to
                                         maximise returns. Council’s
                                         investment returns remain
                                         above target.

Page 14

GENERAL COMMITTEE MEETING                                                                17 JULY 2023


 Category                                                         Comments




 Rates in Arrears                                                      •   Intent: Ensuring that the
                                                                           amount of unpaid rates
                                                                           remains sustainable and
                                                                           does not negatively impact
                                                                           cash flows
                                                                       •   Target: 5%            industry
                                                                           benchmark
                                                                       •   Result: 5.4%
                                                                       •   Comment: Rates         arrears
                                                                           are in line with performance
                                                                           for the previous 6 and 12
                                                                           monthly     cycles.     Where
                                                                           appropriate recovery action
                                                                           will be taken.



Link to Corporate Plan

Theme No. 5. - Excellence


This theme focuses on customer experience, financial sustainability, innovation and technology,
levels of service, governance, our employees and volunteers, funding streams and asset
management practices.


Objective 5.2 - Continue to deliver a financially sustainable Council that has the resources now and
into the future to achieve its strategic objectives. This will be supported through the introduction of
enhanced sustainability reporting and performance indicators, as well as ESG (environment social
and governance) accounting practices as guided by statutory requirements.

Previous Council Consideration
Nil

Page 15

GENERAL COMMITTEE MEETING                                                                     17 JULY 2023


Finance
As above
Risk & Opportunities
Council’s risk register identifies a number of risks that could impact on its ongoing financial
sustainability. In order to manage and mitigate these risks Council uses various tools which include
monthly ongoing financial reporting to identify and address emerging issues, conservative budgeting,
compliance with the Financial Sustainability Policy, regular budget reviews, effective liquidity
management to ensure sufficient fiscal flexibility, as well as adhering to the Reserves and Restricted
Cash policy which requires that Council maintains both a disaster management reserve and a
minimum 3 months cash cover to fund emergent matters.

Some examples of potential risks that may impact on Council’s operational performance, capital
program delivery, cashflow and cash reserves include:
      •    Substantial damage to or failure of Council infrastructure due to natural disaster or other
           emergent issue that may require significant unplanned investment;
      •    An extended closure of Council facilities impacting operational revenues;
      •    A prolonged IT system failure affecting Council’s ability to deliver services or issue rates
           notices;
      •    Economic conditions affecting ratepayers’ ability to pay rates;
      •    Market driven increases in construction and operational costs significantly above estimates;
      •    Labour and material shortages and delays.
Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.

Departments/Sections Consulted:

      Mayor                        Community Services                          Corporate Services

      Councillors               x Director                                   x Director
                                   Community Development                     x Financial Services
 x Chief Executive Officer         Community Facilities                        Fleet

      Executive Support            Libraries & Galleries                       ICT
                                   Local Laws                                  Procurement

                                   Waste & Environmental Health                Property

                                                                               Revenue Services



      Executive Services           Environment & Sustainable Development       Infrastructure Services

 x Director                     x Director                                   x Director
      Community Engagement         Building & Plumbing Services                Asset Management

      Customer Service             Development Assessment                      Buildings and Facilities

Page 16

GENERAL COMMITTEE MEETING                                          17 JULY 2023


  Governance           Economic Development          Civil Operations

  People and Culture   Environmental Services        Disaster Management

                                                     Infrastructure Planning, Design
                       Strategic Land Use Planning
                                                     and Delivery

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.