INTEGRATED PLANNING ACT 1997

Development within the limits of a

port

For more information refer to Guide 18. For

information about prescribed tidal work refer to

Guide 24,

Ifyou answered “YES” to Q12, the application

triggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

developments -

© within 200m of a shipping channel or an, entry
and exit shipping comdor for the port

© within 1000m of a swing basin, a commercial
Shipping wharf, a mooring, anchorage or spoil
grounds;

within 1000m of a planned port facility
identified in a land use plan approved under
the Transport infrastructure Act 1994.

In afl other situation the Port Authority is an:

advice agency.

Marinas
For more information refer to Guide 18. For

13.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark'® and within the limits of a port
under the Transport Infrastructure Act 1994?
INO

[YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

Does the application involve operational work that is tidal work for a marina‘? with more than 6
vessel berths?

 

‘information about whether a marina ts prescribed
tidal work refer to Guide 24. The local
goverment Is the assessment manager for all
prescribed tidal work.

lf you answered “YES" to Q13, the application
triggers referral to Queensland Fire and Rescue
‘Service as an advice agency.

XJ NO

{C1 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

Tidal works in strategic port land tidal
areas
For more information refer to Guide 18.

Unless you answered "NO" to Q14, the relevant
Port Authority is the assessment manager for the

=

4.

Does the application involve tidal works within a strategic port land tidal area?
Ne)
(71 YES - complete Part M of Form 1

 

application and the Environmental Protection
Agency (EPA) and Queenstand Transport (QT)
are concurrence agencies for the application.
Heritage 15. Does the application involve development in a heritage registered place as defined under the
For further information refer to Guide 19. Queensland Heritage Act 1992?
Ifyou answered "YES" to Q15, the application & NO
triggers referral to the Queensland Heritage
Council as concurrence agency for the (11 YES - complete Part C of Form 1
appfication. = - .
. . 15(b)The application involves: (tick applicable boxes)
CIS), he apposton iets vetoed Ww be (1(i)_— amaterial change of use assessable against the planning scheme and the lot shares a
’ Environmental Protection Agency as an advice common boundary with a protected area or registered place under the Queensland
agency for the application Heritage Act 1992;
C1 (ii) _ reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
(iii) none of the above.

 

Declared catchment areas

For more information, including a list of the
dectared catchment areas within Queensiand,
réfer to Guide 13.

Unless you answered “none of the above’ to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

If an agency other than NRW Is the assessment
Manager for the application, NRW Is a
concurrence agency for the application in
relation to this matter.

 

16. The application is in an area declared to be a catchment area under the Wafer Act 2000 and

involves: (tick the applicable box/es)

(i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
- CI (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994:
XJ (ili) none of the above ‘

18 High water mark is defined in the Coastaf Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution) Regutation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Used in these records

About this file

File size
10.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1294 - Op Works - Stormwater, Drainage & Frontage Works - Robert Selkirk [As Published].pdf · 10.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.