Skip to the record
Search everything, all in one place.

Council archive · source document

07/1294 - Op Works - Stormwater, Drainage & Frontage Works - Robert Selkirk [As Published] · 142007.1294

of 41

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.

INTEGRATED PLANNING ACT 1997

Works in tidal areas, coastal
management districts and fish habitat
areas

tfyou answered YES to Q5, and ticked any
boxes in Q6), your application is required to be
essessed against and must comply with the Wild
Rivers Code.

Ifyou answered YES to Q5 and ticked box i) in
Q6, your application is required to be referred to
the EPA.

Note: If specified works are proposed in a local
government area, it is prescribed tidal work - the
relevant local government will be the
assessment manager with the EPA as a
concurrence agency

ifyou answered YES to Q5, and ticked box &) or
fi) in Q6, your application requires referral to
DPIF. .

lf you answered NO to Q5 and ticked bax i) in
Q6, the application wil not be accepted.

" Hyou answered NO to Q5, ticked box il) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a
required permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
Not be accepted.

Ifyou answered NO at Q5 and ticked box iil) in
Q6, the application may be made if the works are
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located In a HPA.

For more information about specified works refer
to Guide 27

(DAS Assessment Checklist, Version 20, 2 April 2007

Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-

Development in a wild river area)

Ono CJ ves

The application is for one or more of the following:

C i) Operational works that is tidal works or works in a coastal management district (ensure you

have completed Part M and/or Part P of Form 1); or

oO ii) Operational works for the removal, destruction or damage of marine plants (ensure you have

completed Part O2 of Form 1); of

| iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).

 

 

 

Residential, commerciat or industrial | 7, _ Is the application for residential, commercial or industrial development in a designated urban
development area?
Ifyou answered YES to Q7, your application
not subject to wid river requirements. Provided Cino Dyes
there are no other aspects of this development | -
that require assessment against the relevant wild] 8. icati i i i i i i .
fiver dedaration or Wid Ravers Code, you donot 8. If NO, does the application for residential, commercial or industrial development involve:
need to complete the remaining questions in oO i) a material change of use made assessable in a local government planning scheme
Section 2, . (ensure you have completed Part D of Form 1); or
Hf you answered NO to Q7 and ticked either box . . 7 .
1) or i) in Q8, the assessing agency is the oO ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
relevant focal govemment. The application must of Form 1).
be assessed against and must comply with the
Wild Rivers Code.
Anima! husbandry activities 9. Does the application involve a material change of use for animal husbandry activities (as defined
Hfyou answered YES to Q9 your application under the Wild Rivers Act 2005) in a PA?.

ulres assessment against and must co!
wh the Wild Rivers cole. mey oO NO O YES (ensure you have completed Part R of Form 1)
The assessing agency is NRW.
Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA. For more detalls and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
Agricultural activities 10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
tfyou answered YES to Q10, your application a PA?

lulres assessment against and must comply
wath the Wild Rivers cole. oO NO C YES (ensure you have completed Part Q of Form 1)
The assessing agency is NRW. ,

11. IF YES is the application for:

Note: Applications for agricuttural activities will
not be accepted if proposed in a HPA. For more
details and a definition of agricultural activites
see the Wikd Rivers Act 2005 and refer to Guide
22.

The production of fodder in a PA, and pasture
improvement using low impact soll disturbance
techniques is not an agricuttural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.

 

oO i) a material change of use; or
(ii) operational works.

 

Page 12

Used in these records

About this file

File size
10.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1294 - Op Works - Stormwater, Drainage & Frontage Works - Robert Selkirk [As Published].pdf · 10.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.