IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

 

 

 

 

 

INTEGRATED PLANNING ACT 1997

Whether particular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a

occupied for residential purposes referral to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of the

1P Regulation.

Assessment period 15 days, No response is a

deemed refusal.

Design and siting 17, An application may trigger referral to the local government as the concurrence agency if the building work

For more Information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.

IP Regulation. 18, An application may trigger referral to the local government as the concurrence agency if the building work

Assessment period 5 days. No rasponse is a does not comply with the qualitative statement for building clearance and site cover.

deemed refusal. 19. An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12. ,

Fire safety in particular budget 20. An application may trigger referral to the local goverment as the concurrence agency to determine the

accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has

For mora information go to schedule 2 table 1 of the been completed.

IP Requlation,

Assessment period 15 days. No response is a

deemed refusal.

Higher risk personal appearance 21. An application may trigger referral to the local ‘government as the concurrence agency to determine if the

services building work

For more information go to schedule 2 table 1 of the © complies with the performance criteria of the Queensland Development code part 15; and

{P Regulation and the QDC part 15. * — the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days. No response is a

deemed refusall,

Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential

For more Information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

IP Regulation and the QDC part 20, teferral to the local government as the concurrence agency.

Assessment period 15 days. No response is a

deemed refusal,

Building work for removal or 23, An application for the removal and/or rebuilding at another site of a building or other structure, will trigger

rebuilding referral to the local government as the concurrence agency,

For more information go to schedule 2 table 1 of the

IP Requlation. .

Assessment period § days. No response is a

deemed refusal. .

Building work for rainwater tank in 24, An application may trigger referral to the local government as the concurrence agency to determine if the

designated rainwater tank area
For more information go to schedule 2 table 1 of the
iP Regulation and the QDC part 25.

Assessment period 15 days, No response Is a
deemed refusal.

 

building work or structure complies with the relevant performance criteria if -

« Under the Building Reguiation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and

« Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

 

Page 16

Used in these records

About this file

File size
10.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1294 - Op Works - Stormwater, Drainage & Frontage Works - Robert Selkirk [As Published].pdf · 10.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.