Council archive · source document
07/1294 - Op Works - Stormwater, Drainage & Frontage Works - Robert Selkirk [As Published] · 142007.1294
Very large file (10.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.
INTEGRATED PLANNING ACT 1997
WY Form 1 Development Application
Operational &/or building work
k=
of ®
assessable against a local government’s planning scheme =.
Part E, Version 2.0, 4 October 2004
q
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed ‘
engineering plans and other plans, detaited engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.
Nature of the application
A development permit authorises
development to occur, while a preliminary
approval is a step in the approval process
and dees not authorise development to occur.
The types of work that are assessable against
a planning. scheme are determined by the
scheme for a particular local govemment and
_ will vary across the State.
_To determine the types of work that are
"assessable under a particular planning
_ scheme, contact the relevant local
govemment. : et
eon Og.
eo
i
This application is for (tick one (1) or both if applicable)
(2 Preliminary approval - provide detaiis of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc
|
AND/OR ‘
Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage ~
infrastructure, etc
Sewebege, Stormwater, Watér, Driveway and Footpath refer to attached plans Foster
Designs 2007-02,DA-00, DA-01, To DA-10 and Construction Hydraulics 1703-0-1,-02,-03,
-04, Note landscape plans to follow, Plans are being submitted in order to coordinate ’
works with proposed Hastings Street upgrade. DA Being Lodged at the same time. —
{
Are the works subsequent to a previous development approval?
INO (1 YES - provide details of ail previous approvals (eg. file references) .
Is the subdivision for a canal estate?
KINO C1 Yes
Portable Long Service Leave levy (if
applicable)
Prior to issuing a development permit for the
works, the assessment manager is required
by law to “sight” an approved fonm, issued by
Qleave, which signifies that the PLSL levy
has been paid,
ts payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
LK] YES - complete 05
[NO - 05, 6 & 7do not apply
Has the PLSL levy been paid?
(C1 YES - compieteas
[KI NO - the applicable fevy must be paid before @ development permit can be given for the works
How much was paid? :
[ TBA, will be paid when costs can be quantified
What is the receipt number of the payment?
| TBA
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
tequested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager)
DATE RECEIVED
REFERENCE
_NUMBERIS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1294 - Op Works - Stormwater, Drainage & Frontage Works - Robert Selkirk [As Published]Related documentApplication case desk ↗
001564F2.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 10.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.