Provide the new stormwater infrastructure
which connects to the stormwater system of
the local Authority prior to any further activity
on site.
For the new stormwater infrastructure refer to
drawing 1703-0-2
Runoff to iit trop
oo"
Prior to the commencment of any construction activities the following measures
‘shall be incorporated:
* Provide education of site personnel
* Set up action plans as a precaution in case of disturbances occuring
after an unexpected strong rainfall event
* Provide regular inspection and maintenance of all structures including the
temporary structures,
GENERAL NOTES
These Drawings ore diagrammatic only and anal be raad in conjunction wih ll relevant LEGEND
Architectural and other consultants drawings and specifications and other w
Lraruciors tek ry oe leved the course of the controct.
Gecreponciee, shal be referred to the supervising officer for decision before
seeding with the work.
ood sholl verity all fixture locations, invert levels, surtace levels, . Exinting storm water
cover ia pipes ore correat ond ouicincols. prior ta commencement ef” Unt work
The exact location of existing, and proposed services, shall be verified with ——— = Storm Water Drainage
The relevent Authorly, or: eter trodes oe, apphoabie.
STORMWATER DRAINAGE, . ala
round 100 dia PVC class SW min grade 1:100 U.N.O.
pipework shall be
Downsipes shat be 100" Dla PVC. close. Sw
COVERS & FRAMES Dosen ee
Covers subject to vehiculer trafic to be 338 da, coat iron, medium duty UNO
Govera in gromnad or conc, areas to be $38 da. cast iron, concrete Infl HM duty = ean. Eccentric. enlarger
‘rece’ ta ba 600.90 nfl to. match: povng_ pete
ed areas to be os for paved oreos, sith, Brose © WG Floor Woste
See iam $e sel ane ea te qully
overs: ‘romes to be “Faston” or equal approved.
OPI Gully Pit
GRATINGS o ily
Gratings for storm water to be “faston, Gatic™ ioe oppreved equal,
1© match manufacturers recommendations for leading condition.
Trench grate to be transverse bor.
Pinar weste gretee in puss, oress ip’ be: chrome: pldted Grove
in private oreos may be PVC.
————= Sediment Fence
———— Sediment orrier
Notes sediment control:
1. General
3 Wree wt, should be diverted round the work site where possible.
nd wedi contre "be inated ond Se operslonal before commencing upslope
{g} Micorel meonures tv, iapain ot ont eet and fer significant runatt storms.
Control measures may be removed when on-site erosion is controlled ond 70% soi
coverage ls obtoined over all upstream disturbed lond.
2 Sediment Fence
(2) Use woven fabrics
5. Temp, Construction Entry/Exit Sediment Trap.
Adjocent stormwater runoff ey, trom entry/ext.
Wheel — wash or spray unit may be required during. wet weather.
$8? 9R3Z3ER ORS,
femporary construct
sediment trap refer_dt
Diometer
Cleanout to surtoce
Finisned roar evel
id oe sole
Storm water droin
Trench grate transverse bor
Trench grate longitudinal bar
Underground
Under slab
Unless noted otherwise
‘. Safety issues must be considered at all times, Incorpate traffic control devices to the satisfaction of the superintendent.
5. All dimensions In millimetres unless indicated otherwise.
6. Field Inlet
} A stobilved bypass overland flow path should exat adjacent to the field inet
b) Woter level control perimeter bonks may be requir
¢) Blocks to be oy © horizontal Unber Tol ct block join height fiaed to Umber stakes et comers
7. Safety issues must be considered at all times, incorporate traffic control devices to the satisfaction of the Superintendent.
Provide sedimentation basin during construction.
The sedimentation basin may be adjusted in
accordance with the construction progress. However
always ensure a minimum of 150mm freeboard to
the overflow weir,
The overflow discharging from the sedimentation
basin shall be by means of gravity. However a pump
‘sump as shown in the detail shall be provided to
ensure heavy rainfall events can be dealt with,
Ensure no scouring occurs. Provide velocity
breakers such as large rocks or straw bales.
The sedimentation basin shall catch 100% of the
surface runoff from the site hence provide barriers
and dam walls as temporary measure to direct the
flow through the sedimentation basin.
Posts or steel pickets
00min vertical overtop of fabric
Undisturbed area
Gootextile fabric
driven 800mm Into ground
Crushed or grannuar material,
Grading to Table 4 of QT
‘Specification MRS11,03
—~ Flow direction
shodeciot?
tle to steel picket
Geotextile Fobrie
ond F42 Ny
Perimeter sediment fence
reter detail
For Tender
|For Construction |
Constructed | i}
Construction Hydraulic ‘}
Buliding Service Engineers J
contact: Reinhold Koenning wmicaust RPEQ No 7023
PO Box 1176
molt rbconnyd-com PH: 5444 8645
www.conhyd.com FX: 5444 8224
CUENT
MR. & MRS SELKIRK
“ARCHITECT =
FOSTER DESIGN |
PRovect: PROPOSED REDEVELOPMENT
33 HASTINGS ST
NOOSA
DRAWING TITLE:
SEDIMENT & EROSION
CONTROL PLAN
OPERATIONAL WORKS
teow RK [oman mei oe
SAE: 1:100 maruna| 4 4 | 1703-0-
RPI
Lots 0-7 on BUP2665
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1294 - Op Works - Stormwater, Drainage & Frontage Works - Robert Selkirk [As Published]Related documentApplication case desk ↗
001564F2.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 10.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.