Appendix H - Engineering Services Report Part 1 of 2
Attached to the e-mail MCU14/0083 Appendices.
Gateway Drive, Noosaville Engineering Report Reference Number: 205-002-003R Mogpropmanagement Pty Ltd 3/10/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 21 pages
Page 2
Prepared by:
Projex Partners Pty Ltd
ACN 153 518 971 ABN 62 153 518 971
Level 2, 9 Capital Place
Lake Kawana Business Village
BIRTINYA QLD 4575
Telephone: 07 5493 3649
DOCUMENT ISSUE RECORD
Revision Code Date Revised Revision Details Author Checked Approved
A 3/10/2014 Original issue BD KP
© 2014 Projex Partners Pty Ltd
This document is and shall remain the property of Projex Partners Pty Ltd. This document may only be used for the
purposes for which it was commissioned in accordance with the Terms of Engagement. Unauthorised use of this
document in any form whatsoever is prohibited.
This report has been prepared on behalf of and for the exclusive use of the Client, and is subject to all provisions of
the agreement between Projex Partners and the Client. Projex Partners accepts no liability or responsibility
whatsoever for reliance upon this report by any third party.
205-002-003R Mogpropmanagement Pty Ltd Page i
Engineering Report / Rev 1 Gateway Drive, Noosaville
3/10/2014
Page 3
CONTENTS 1 INTRODUCTION 1 1.1 PROJECT DESCRIPTION 1 2 GENERAL 2 2.1 EXISTING SITE 2 2.2 PROPOSED DEVELOPMENT 2 3 EARTHWORKS 2 4 CONCEPT SITE DESIGN GEOMETRY 3 5 STORMWATER MANAGEMENT 4 6 SEWERAGE 4 7 WATER SUPPLY 4 8 SITE ACCESS 5 9 ELECTRICITY AND COMMUNICATIONS SUPPLY 5 10 CONCLUSIONS 6 Appendices Appendix A Proposed Development Layout Appendix B Detail and Contour Survey Appendix C Dial Before You Dig Information (Service Infrastructure Locations) 205-002-003R Mogpropmanagement Pty Ltd Page ii Engineering Report / Rev 1 Gateway Drive, Noosaville 3/10/2014
Page 4
1 INTRODUCTION
1.1 Project Description
Projex Partners have been commissioned by Mogpropmanagement Pty Ltd to provide engineering
services to support a Material Change of Use application for a proposed development at Lot 102 on
SP241371 located at Gateway Drive, Noosaville. The purpose of this engineering report is to
demonstrate how the engineering issues related to the proposed development will be addressed.
The proposed development is for a tyre retailer and will provide 1,266 m2 of low impact industrial
development including on-site parking. This report will outline the following:
Earthworks;
Concept site design geometry;
Stormwater management;
Sewerage;
Water supply;
Site Access;
Electricity and communications.
Figure 1.1 provides an aerial image of the site location.
Bunnings
Site
Figure 1-1 Site Location
205-002-003R Mogpropmanagement Pty Ltd Page 1
Engineering Report / Rev 1 Gateway Drive, Noosaville
3/10/2014
Page 5
2 GENERAL 2.1 Existing Site The existing site is currently vacant having recently undergone earthworks as part of the realignment of Gateway drive and the construction of Bunnings. The site is sparsely covered with vegetation including young trees and grass and the clearing of this vegetation will be required as part of these works. The site also contains an advertising sign which is required to be removed prior to development. The site generally falls to the north of the site at an approximate grade of 10% and currently drains to pits on the south side of Gateway Drive. The maximum level on the site is approximately R.L 22.0m AHD along the south boundary falling to R.L 17.0m AHD in the north. Refer to Appendix A. The site currently has no driveway crossovers. 2.2 Proposed Development The proposed development is for a tyre retailer to be located on Lot 102 on SP241371 along Eumundi- Noosa Drive, Noosaville. The total site area is 1,266 m2 and is proposed to consist of 578.9 m2 for the tyre retailer building located along the southern boundary of the site. A total of 15 car parks will be provided on site. Access to the site is proposed to be provided via two locations, an all-movements access to the west on Gateway Drive and a left-in only on the New Gateway Drive to the east. The eastern access is proposed as the designated access for delivery vehicles with a keep clear zone provided to enable adequate storage for a 12.5m HRV to enter the site. It is understood that the access to the east was not favoured by during the pre-lodgement meeting however since then the access has been modified with details discussed in Section 8, it was determined that this second access would allow delivery vehicles to pass through the site rather than requiring an internal turnaround area and provide a safer environment for vehicles and pedestrians as trucks will not be required to complete complicated reversing movements. 3 EARTHWORKS Earthworks will be required on site to enable construction of the proposed building and associated car parking and access. This will be achieved through cut and fill with the intention of achieving a balanced earthworks operation. Earthworks drawings can be seen in drawings number 205-002-C04.01 attached at Appendix B. 205-002-003R Mogpropmanagement Pty Ltd Page 2 Engineering Report / Rev 1 Gateway Drive, Noosaville 3/10/2014
Page 6
4 CONCEPT SITE DESIGN GEOMETRY
It is proposed that access to the site will be provided via two driveway cross-overs to facilitate an all-
movements access to the west and a left-in only to the east. A total of 15 car parks will be provided, 6
staff parks in the first row and 9 customer parks in a second row and will be located to the north of the
site.
The proposed tyre retailer building will be located along the southern border of the site with the following
approximate dimensions:
Width – average 13.75m;
Length – 44.8m;
Offset from southern boundary – 0m.
The minimum width of trafficable areas throughout the development will be 6.4m.
The proposed development layout can be seen in Figure 4.1 and is attached at Appendix A.
Figure 4-1 - Proposed Layout Plan
205-002-003R Mogpropmanagement Pty Ltd Page 3
Engineering Report / Rev 1 Gateway Drive, Noosaville
3/10/2014
Page 7
5 STORMWATER MANAGEMENT A stormwater management plan has been prepared under separate cover. A summary of the stormwater management plan is provided as follows: Water quality objectives have been demonstrated to be achieved through the implementation of a treatment train that incorporates gross pollutant traps/filter bags and a ZPG Storm filter system to reduce total suspended solids (TSS), total phosphorus (TP), total nitrogen (TN) and gross pollutants. Appropriate erosion and sediment control measures will be required to be prepared and implemented on site during construction activities in order to minimise water quality impacts during the construction phase. The stormwater quantity management assessment demonstrates that overland flow within the network is reduced as a result of this development by the inclusion of the pipe network on the development site. Gateway Drive will therefore benefit as result of reduced overland flow contributing to the road. A PC-drain analysis determined that the proposed internal stormwater network was sufficient to accommodate 10 year ARI flows. Notwithstanding the assessment, further detailed design of the internal stormwater system and connection to the existing pipe network will be required to be undertaken as part of the future Operational Works application for the development. 6 SEWERAGE Operational Works drawings obtained through Councils’ online development service show approved plans for the construction of a sewer manhole serviced by a DN160 PE100 pipe in the northern corner of the site. Preliminary site investigations confirmed that this has already been constructed. 7 WATER SUPPLY Operational Works drawings obtained through Councils’ online development service show approved plans for the construction of a 50mmØ house connection and 150mmØ fire service connection located in the south west corner of the site. 205-002-003R Mogpropmanagement Pty Ltd Page 4 Engineering Report / Rev 1 Gateway Drive, Noosaville 3/10/2014
Page 8
8 SITE ACCESS A Traffic Report has been prepared under separate cover. A summary of the Traffic Impact Assessment is provided as follows: The all movements’ access on the western boundary of the site has shown minimum sight distance requirements as per Austroads Guide to Road Design – Part 4A: Unsignalised and Signalised Intersection. This site access was originally proposed as a left-in left-out access and was considered generally unacceptable in the pre-lodgement meeting. It has since been reduced to a left in only and therefore not required to meet intersection sight distance requirements with the following supporting information; The existing road is required to provide stopping sight distance SSD; Gateway Drive has a low operating speed due to the geometry of the road and proximity to the roundabout; A keep clear zone will be provided within the site with adequate storage for a 12.5m HRV to ensure no disruption is caused to through traffic; Maintaining two site access points will eliminate the requirement of trucks to perform internal turnaround maneuvers or reverse into the road; Adequate turn path provisions are provided. 9 ELECTRICITY AND COMMUNICATIONS SUPPLY The DBYD information (attached at Appendix C) and a phone call to Energex confirmed that the site has multiple power connection options including overhead and underground power. The selection of the appropriate connection requires detailed information on the sites expected power usage and will be defined at the operational works stage of this project. The DBYD information also revealed the location of communication network infrastructure with Optus underground network cables running along the northern side of Eumundi-Noosa Road with an Optus pit located to the west of the intersection of Gateway Drive and Eumundi-Noosa Road. The location of this communications infrastructure is attached at Appendix C. 205-002-003R Mogpropmanagement Pty Ltd Page 5 Engineering Report / Rev 1 Gateway Drive, Noosaville 3/10/2014
Page 9
10 CONCLUSIONS Projex Partners have been commissioned by Mogpropmanagement Pty Ltd to provide engineering services to support a Material Change of Use application for a proposed tyre retailer to be located at Lot 102 on SP241371 located at Gateway Drive, Noosaville. It is assumed that the information provided by this report demonstrates the suitable of this site for the proposed development. Access to the site will be provided via two driveway cross-overs, one all movements access along Gateway Drive to the west and another left-in only on New Gateway Drive to the east. The notional site layout allows for 15 car parks and a total ground floor area of 578.9m2 of allocated light industry ground floor area for the tyre retailer. A stormwater management plan was prepared and revealed that water quality objectives can be achieved through the implementation of a treatment train that incorporates gross pollutant traps/filter bags and a ZPG Storm filter system to reduce total suspended solids (TSS), total phosphorus (TP), total nitrogen (TN) and gross pollutants. The stormwater quantity management assessment demonstrates that overland flow within the network is reduced as a result of this development by the inclusion of the pipe network on the development site. Gateway Drive will therefore benefit as result of reduced overland flow contributing to the road. There is a sewer manhole located to the north of the site that will be internally connected. Water supply will be provided via the existing connection point to the south west corner of the site. A Traffic Report was completed separately confirming compliance of the two site access points including demonstration of turning paths for a 12.5m HRV and relevant site distance compliance. Power supply is available via existing infrastructure along Eumundi-Noosa Drive to the south of the site. 205-002-003R Mogpropmanagement Pty Ltd Page 6 Engineering Report / Rev 1 Gateway Drive, Noosaville 3/10/2014
Page 10
ProjexPartners Appendix A Proposed Development Layout
Page 11
LEGEND
17 New Contours (0.1m Intervals)
New Concrete Driveway
New Proposed Buildings
New Landscaping / Streetscaping
New Kerb / Kerb & Channel
BUNNINGS WAREHOUSE New Drainage Pipe
Lot 101
SP241371
Field Inlet / Gully Pit
SHOPPING PRECINCT
Lot 308
SP114181
NEW R
VE O AD
18.0
17
DRI
.5
17
.0
Concrete Industrial Driveway
Y
.5
crossover. Refer to IPWEAQ
EWA
1818.5
18.5 54. Std. Drg. SEQ R-051
9
GAT
50
.0
17.0
19
45.0
Existing footpath to be removed .0
40.0
35.0
to allow for driveway construction.
17
30.0
25.0
.5
19.0
0.0
20.0
5.0
15.0
10.0
18
18
Concrete Industrial Driveway
.0
.5
crossover. Refer to IPWEAQ Lot 102
19.5
Std. Drg. SEQ R-051 SP241371
Proposed Building
20.0
19.5
20.0
W:\205 Mogprop Management\205 002 MCU Gateway Dve Noosaville\Drawings\205-002-WORKING.dwg
19.5
Lot 500
SP114181 Existing Vegetation Area
Lot 500
to remain
SP241371
Park
AD
N DI NO OSA RO
EUMU
OVERALL LAYOUT
SCALE: 1:500 (A3)
PRELIMINARY ISSUE
CLIENT APPROVED SCALE
LOT 102 SP241371 GATEWAY DRIVE, NOOSAVILLE
MOGPROP 1:250 0 5 10 15 A1
PROJECT MANAGEMENT - ENGINEERING - PLANNING
MANAGEMENT PTY LTD 1:500 A3 OVERALL LAYOUT PLAN
SUNSHINE COAST MACKAY CAIRNS RPEQ
(07) 5493 3649 (07) 4957 4988 (07) 4041 5118 1 PRELIMINARY ISSUE 07/08/14 RH KP JB ---- DRAWING NUMBER REVISION
projexpartners.com.au No. Description Date Drawn Design Check RPEQ 205-002-C03.01 1
THIS DRAWING MAY ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS PREPARED BY PARTIES AGREED TO BY PROJEX PARTNERS & MUST NOT BE USED BY ANYONE ELSE OR FOR ANY OTHER PURPOSE
Page 12
ProjexPartners Appendix B Preliminary Earthworks Plan
Page 13
EARTHWORKS LEGEND
Area of Cut
BUNNINGS WAREHOUSE
Area of Fill
17 New Major Contours
Lot 101
SP241371 New Minor Contours
17 Existing Contours
SHOPPING PRECINCT
Lot 308
SP114181
NEW R
OAD
VE
18.0
17
DRI
.5
17
.0
Y
.5
EWA
1818.5
18.5 54.
9
GAT
50
.0
17.0
19
45.0
.0
40.0
35.0
17
30.0
25.0
.5
19.0
0.0
20.0
5.0
15.0
10.0
18
18
.0
.5
Lot 102
19.5
SP241371
Proposed Building
20.0
19.5
20.0
19.5
W:\205 Mogprop Management\205 002 MCU Gateway Dve Noosaville\Drawings\205-002-WORKING.dwg
Lot 500
SP114181
Lot 500
SP241371
Park
AD
DI NO OSA RO
EUMUN
EARTHWORKS LAYOUT
SCALE: 1:500 (A3)
PRELIMINARY ISSUE
CLIENT APPROVED SCALE
LOT 102 SP241371 GATEWAY DRIVE, NOOSAVILLE
MOGPROP 1:250 0 5 10 15 A1
PROJECT MANAGEMENT - ENGINEERING - PLANNING
MANAGEMENT PTY LTD 1:500 A3 EARTHWORKS PLAN
SUNSHINE COAST MACKAY CAIRNS RPEQ
(07) 5493 3649 (07) 4957 4988 (07) 4041 5118 1 PRELIMINARY ISSUE 07/08/14 RH KP JB ---- DRAWING NUMBER REVISION
projexpartners.com.au No. Description Date Drawn Design Check RPEQ 205-002-C04.01 1
THIS DRAWING MAY ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS PREPARED BY PARTIES AGREED TO BY PROJEX PARTNERS & MUST NOT BE USED BY ANYONE ELSE OR FOR ANY OTHER PURPOSE
Page 14
ProjexPartners Appendix C Dial Before You Dig Information (Service Infrastructure Locations)
Page 15
0 0.05
kilometres
Scale: 1:1,703
DBYD Search
101 Eumundi-Noosa Rd
While every care is taken to ensure the accuracy of this product, neither the Noosa Council nor
Noosaville 4566 the State of Queensland makes any representations or warranties about its accuracy, reliability,
completeness or suitability for any particular purpose and disclaims all responsibility and all
liability (including without limitation, liability in negligence) for all expenses, looses, damages
(including indirect or consequential damage) and costs that may occur as a result of the product
being inaccurate or incomplete in any way or for any reason.
Crown & Council Copyright Reserved.
Geocentric Datum of Australia 1994 (GDA94)
Created by: JA Date: 25, September 2014
Page 16
All underground cables shall be treated as being energised. Where a cable is located that is not represented on the ENERGEX EnerG!Se DBYD map, then ENERGEX shall be contacted immediately. 3900 4000 PAPER SIZE A3_ Map has been designed to be reproduced in colour For Emergency Situations Please call 13 19 62 4200 ‘8200 |} 8700 7078600m N ——+ e800 energex EnerGlSe DBYD Date: 25 Sep 14 Time: 14.30.42 Requested By: DBYD SCALE 1:1000 Enquiry No: 41742059 STRIP No: 2 == Cable Voltage Ground Transformer Loss Than 39k! Cubicle Tanstormer MI Cable Voltage S3KV or Higher Ring Main Unit Metering Unit 0 ieertay Wo Cable Vi tink Ptor ©. conduit [1 Service Pitter HA Multi-Section Junction Pillar Duct ‘Hench 1 _t m Cable Joint Cable Tray > Cable Termination [—] Tama! © Cable Marker xh Steet Light Pole Sl Earth Works Order Palygon SC354-B pel INDEX TO SHEETS 503800m E, This output provides details of the ENERGEX electrical network. As variations may exist no responsibility is inourred by ENERGEX for the accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site. 4000 4100 4200 UNCONTROLLED COPY LOCALITY DIAGRAM i 5 PAPER SIZE A3 Map has been designed to be reproduced in colour
Page 17
All Optus pits and manholes should be a minimum of 1.0m in from the back of kerb or within 15m of street intersection after the completion of your work. All Optus conduit should have the following minimum depth of cover after the completion of your work:- e Footway 600mm e Roadway 1000mm at drain invert and at road centre crown In cases where it is considered that these clearances cannot be maintained at the completion of works advice is to be sought form the Optus Damages and Relocations Team FURTHER ASSISTANCE Assistance can be obtained by contacting Optus Network Operations Asset Analysis on 1800 505 777 Where an on-site location is provided, the owner is responsible for all costs associated with hand digging or use of non-destructive water jet method (pot holing) to visually locate and expose Optus plant. If plant location drawings or visual location of Optus plant by digging reveals that the location of Optus plant is situated wholly or partly where the owner plans to work, then Optus Damages and Relocates Team must be contacted through Optus Network Operations Asset Locations to discuss possible engineering solutions. PRIVATE RESIDENTIAL LANDOWNERS and RURAL LANDOWNERS Where Optus owned cable crosses private residential property or agricultural land, Optus may provide a once off free onsite electronic cable location. Optus Network Operations Asset Analyst will provide assistance in determining whether a free on-site location is required. Please note: e The exact location, including depth of cables can only be verified by pot holing which is not covered under this service e This service is only available to assist private residential land owners and rural land owners e The service covers one hour onsite only. Additional time will be charged at the current nominal rate. OPTUS ENGINEERING DRAWING SYMBOLS Optus underground cable & Optus manholespit Optus conduit v) Other Utility manhole/pit eee eee = Optus fibre in Other Utility conduit v Optus marker post srrctetetetetesetee Southern Cross conduit wSSCcccSSSS =«(Vecomm conduit ttt Railway J Tram line —B 8— Optus underground cable DWi1234 Optus marker post number —pB by — Optus cable buried jointly a Depth of Optus cable with third party utility - Offset to Optus cable —— fer Optus aerial cable 12 Optus cable depth (approximate! / / Optus cable in conduit ay " eee a 56 with subducts Optus cable offset (approximate) Optus Communications Page 4 of 4
Page 18
DIAL BEFORE YOU DIG OPTUS” Vou bic Network Operations— Asset Analysis Unit 9, 677 Springvale Road Mulgrave, Victoria, 3178 Date: 25/09/2014 To: Mr Ben Dean Company: Address: PO Box 1415 Buddina, QLD 4575 ENQUIRY DETAILS Location: Lot 101 Eumundi-Noosa Road, Noosaville, QLD 4566 Sequence No.: 41742061 DBYD Reference: 8367736 In relation to your enquiry of the above address, Optus advises as follows: The records of Optus disclose that there ARE underground FIBRE OPTIC TELECOMMUNICATIONS cables in the vicinity of the above enquiry as per the attached plan(s). This reply is valid for a period of 30 days from the date above. IMPORTANT INFORMATION Drawings and Plans provided by Optus are reference diagrams which were correct at the time the asset was built. Exact ground cover and alignments cannot be provided with any certainty as these may alter over time. Depths of Telecommunications plant vary considerably as do alignments. It is essential to uncover the asset and positively identify the assets exact location. Optus plans are provided as a guide only and the completeness of the information cannot be guaranteed. “DUTY OF CARE” When working in the vicinity of Telecommunications plant you have a legal “Duty of Care” that must be observed. It is the responsibility of the owner and any consultant engaged by the owner, including an architect, consulting engineer, developer and head contractor to design for minimal impact to Optus plant. Optus will provide assistance at this design stage through the provision of plans and sketches or consultation. It is the owner's (or constructor’s) responsibility to:- a) Request plans of Optus plant for a particular location at a reasonable time before construction begins. If you have doubts about the presence of Optus assets we strongly recommend that you engage an Optus Accredited plant locator. b) Visually locate Optus plant by hand digging or using non-destructive water jet method where construction activities may damage or interfere with Optus plant c) Contact Optus Network Operations - Asset Analyst (details below) if Optus plant is wholly or partly located near construction activities Optus Communications Page 1 of 4
Page 19
CRIMINAL CODE ACT 1995 The following is an extract from the Criminal Code Act 1995 and is applicable to Optus plant Chapter 10 National infrastructure Part 10.6 Telecommunications Services Division 474 Telecommunications offences Sect 474.6 Interference with facilities 1) Apperson is guilty of an offence if the person tampers with, or interferes with, a facility owned or operated by: (a) a carrier; or (b) a carriage service provider; or (c) anominated carrier. Penalty: Imprisonment for 1 year. 2) For the purposes of an offence against subsection (1), absolute liability applies to the physical element of circumstance of the offence, that the facility is owned or operated by a carrier, a carriage service provider or a nominated carrier. 3) Aperson is guilty of an offence if: (a) the person tampers with, or interferes with, a facility owned or operated by: i.a carrier; or ii.a carriage service provider; or iii.a nominated carrier; and (b) this conduct results in hindering the normal operation of a carriage service supplied by a carriage service provider. Penalty: Imprisonment for 2 years. 4) For the purposes of an offence against subsection (3), absolute liability applies to the following physical elements of circumstance of the offence: (a) that the facility is owned or operated by a carrier, a carriage service provider or a nominated carrier; (b) that the carriage service is supplied by a carriage service provider. 5) Apperson is guilty of an offence if: (a) the person uses or operates any apparatus or device (whether or not it is comprised in, connected to or used in connection with a telecommunications network); and (b) this conduct results in hindering the normal operation of a carriage service supplied by a carriage service provider. Penalty: Imprisonment for 2 years. DAMAGE ANY DAMAGE TO OPTUS NETWORK MUST BE REPORTED TO 1800 500 253 IMMEDIATELY The owner is responsible for all plant damage when works commence prior to obtaining Optus Drawings, or failure to follow instructions. Optus reserves the right to recover compensation for loss or damage to its cable network and other property including consequential loss ASSET RELOCATIONS You are not permitted to relocate or alter any Optus assets or network under any circumstance. For all enquiries relating to the relocation of Optus assets please email [email protected] Optus Communications Page 2 of 4
Page 20
ESSENTIAL PRECAUTIONS AND APPROACH DISTANCES Note: If the following clearances cannot be maintained, please contact Optus Network Operations Asset Analysis Team for advice on how to resolve the situation. 1. On receipt of plans and before commencing excavation work or similar activities near Optus plant, carefully locate the plant first to avoid damage. Engage an Optus accredited locator to undertake exposure of the Optus plant when working within the following approach distances. Where Optus plant is in an area where road and footpaths are well defined by kerbs or other features a minimum clear distance of 1.0m must be maintained from where it could be reasonably presumed that plant would reside. In non established or unformed reserves this distance must be at least 3 metres. In country or rural areas which may have wider variations in reasonably presumed plant presence, the following minimum approach distance applies: a) Parallel to plant: 5 metres Note: Indicated depths may vary significantly and pot-holing needs to be undertaken within extreme care, commonsense and using techniques least likely to damage cables. Potholing is only to be undertaken by an Optus accredited plant location contractor. If construction work is parallel to Optus plant, then carful hand digging or using non destructive water jet method (pot holing) at least every 5m is required to establish the location of the plant, confirming the location of the plant prior to work commencing. Under no circumstances is crossing of Optus plant to be performed without first exposing the Optus plant and having an Optus representative present onsite. 2. Maintain the following minimum clearance between construction activity and the actual location of Optus plant. Jackhammers / Pneumatic Breakers Not within 1.0m of actual location Vibrating Plate or Wacker Packer Compactor Not within 0.5m of actual location 300mm compact clearance before compactor can be used across Optus ducts 750mm compact clearance cover before compactor can be used across Optus Direct Buried cable Boring Equipment Not within 5.0m of actual location without Optus representative onsite (in-line, horizontal and vertical) Constructor to hand dig or non-destructive water jet method (pot holing) and expose the Optus plant Not to cross the Optus plant without first exposing the plant at the crossing point and without Optus representative onsite Heavy vehicle Traffic (over 3 tonnes) Not to be driven across Optus ducts or plant with less than 600mm of cover Depth to be verified via hand digging Mechanical Excavators, Farm ploughing, Boring, Not within 1.0m of actual location Tree removal, fencing Constructor to hand dig or use non-destructive water jet method (pot holing) and expose plant Optus Communications Page 3 of 4
Page 21
All Optus pits and manholes should be a minimum of 1.0m in from the back of kerb or within 15m of street intersection after the completion of your work. All Optus conduit should have the following minimum depth of cover after the completion of your work:- e Footway 600mm e Roadway 1000mm at drain invert and at road centre crown In cases where it is considered that these clearances cannot be maintained at the completion of works advice is to be sought form the Optus Damages and Relocations Team FURTHER ASSISTANCE Assistance can be obtained by contacting Optus Network Operations Asset Analysis on 1800 505 777 Where an on-site location is provided, the owner is responsible for all costs associated with hand digging or use of non-destructive water jet method (pot holing) to visually locate and expose Optus plant. If plant location drawings or visual location of Optus plant by digging reveals that the location of Optus plant is situated wholly or partly where the owner plans to work, then Optus Damages and Relocates Team must be contacted through Optus Network Operations Asset Locations to discuss possible engineering solutions. PRIVATE RESIDENTIAL LANDOWNERS and RURAL LANDOWNERS Where Optus owned cable crosses private residential property or agricultural land, Optus may provide a once off free onsite electronic cable location. Optus Network Operations Asset Analyst will provide assistance in determining whether a free on-site location is required. Please note: e The exact location, including depth of cables can only be verified by pot holing which is not covered under this service e This service is only available to assist private residential land owners and rural land owners e The service covers one hour onsite only. Additional time will be charged at the current nominal rate. OPTUS ENGINEERING DRAWING SYMBOLS Optus underground cable & Optus manhole/pit Optus conduit vy Other Utility manhole spit eee = Optus fibre in Other Utility conduit v Optus marker post eceesrerersrsrezeese Southern Cross conduit romooooomoos § Vecommcondut Ht Railway / Tram line —B8 8— Optus underground cable pwi234 Optus marker post number — BJ ps — Optus cable buried jointly : ; Depth of Optus cable with third party utility : Offset to Optus cable Optus aerial cable 12 Optus cable depth (approximate) ( j Optus cable in conduit “oe 5.6 with subducts Optus cable offset (approximate) Optus Communications Page 4 of 4
Page 22
WARNING: This document is confidential and may also be privileged. Confidentiality nor privilege is not waived or destroyed by virtue of it being
transmitted to an incorrect addressee. Unauthorised use of the contents is therefore strictly prohibited. Any information contained in this document
that has been extracted from our records is believed to be accurate, but no responsibility is assumed for any error or omission.
Optus Plans and information supplied are valid for 30 days from the date of issue. If this timeline has elapsed please raise a new enquiry.
Sequence Number: 41742061 Date Generated: 25/09/2014
For all Optus DBYD plan enquiries –
Email: [email protected]
For urgent onsite assistance contact 1800 505 777
Optus Limited ACN 052 833 208