Appendix H - Engineering Services Report Part 1 of 2
Attached to the e-mail MCU14/0083 Appendices.
All underground cables shall be treated as being energised. Where a cable is located that is not represented on the ENERGEX EnerG!Se DBYD map, then ENERGEX shall be contacted immediately. 3900 4000 PAPER SIZE A3_ Map has been designed to be reproduced in colour For Emergency Situations Please call 13 19 62 4200 ‘8200 |} 8700 7078600m N ——+ e800 energex EnerGlSe DBYD Date: 25 Sep 14 Time: 14.30.42 Requested By: DBYD SCALE 1:1000 Enquiry No: 41742059 STRIP No: 2 == Cable Voltage Ground Transformer Loss Than 39k! Cubicle Tanstormer MI Cable Voltage S3KV or Higher Ring Main Unit Metering Unit 0 ieertay Wo Cable Vi tink Ptor ©. conduit [1 Service Pitter HA Multi-Section Junction Pillar Duct ‘Hench 1 _t m Cable Joint Cable Tray > Cable Termination [—] Tama! © Cable Marker xh Steet Light Pole Sl Earth Works Order Palygon SC354-B pel INDEX TO SHEETS 503800m E, This output provides details of the ENERGEX electrical network. As variations may exist no responsibility is inourred by ENERGEX for the accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site. 4000 4100 4200 UNCONTROLLED COPY LOCALITY DIAGRAM i 5 PAPER SIZE A3 Map has been designed to be reproduced in colour
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.