Original source · versioned page text
Appendix H - Engineering Services Report Part 1 of 2
Attached to the e-mail MCU14/0083 Appendices.
ESSENTIAL PRECAUTIONS AND APPROACH DISTANCES Note: If the following clearances cannot be maintained, please contact Optus Network Operations Asset Analysis Team for advice on how to resolve the situation. 1. On receipt of plans and before commencing excavation work or similar activities near Optus plant, carefully locate the plant first to avoid damage. Engage an Optus accredited locator to undertake exposure of the Optus plant when working within the following approach distances. Where Optus plant is in an area where road and footpaths are well defined by kerbs or other features a minimum clear distance of 1.0m must be maintained from where it could be reasonably presumed that plant would reside. In non established or unformed reserves this distance must be at least 3 metres. In country or rural areas which may have wider variations in reasonably presumed plant presence, the following minimum approach distance applies: a) Parallel to plant: 5 metres Note: Indicated depths may vary significantly and pot-holing needs to be undertaken within extreme care, commonsense and using techniques least likely to damage cables. Potholing is only to be undertaken by an Optus accredited plant location contractor. If construction work is parallel to Optus plant, then carful hand digging or using non destructive water jet method (pot holing) at least every 5m is required to establish the location of the plant, confirming the location of the plant prior to work commencing. Under no circumstances is crossing of Optus plant to be performed without first exposing the Optus plant and having an Optus representative present onsite. 2. Maintain the following minimum clearance between construction activity and the actual location of Optus plant. Jackhammers / Pneumatic Breakers Not within 1.0m of actual location Vibrating Plate or Wacker Packer Compactor Not within 0.5m of actual location 300mm compact clearance before compactor can be used across Optus ducts 750mm compact clearance cover before compactor can be used across Optus Direct Buried cable Boring Equipment Not within 5.0m of actual location without Optus representative onsite (in-line, horizontal and vertical) Constructor to hand dig or non-destructive water jet method (pot holing) and expose the Optus plant Not to cross the Optus plant without first exposing the plant at the crossing point and without Optus representative onsite Heavy vehicle Traffic (over 3 tonnes) Not to be driven across Optus ducts or plant with less than 600mm of cover Depth to be verified via hand digging Mechanical Excavators, Farm ploughing, Boring, Not within 1.0m of actual location Tree removal, fencing Constructor to hand dig or use non-destructive water jet method (pot holing) and expose plant Optus Communications Page 3 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.