Original source · versioned page text
Appendix H - Engineering Services Report Part 1 of 2
Attached to the e-mail MCU14/0083 Appendices.
CONTENTS 1 INTRODUCTION 1 1.1 PROJECT DESCRIPTION 1 2 GENERAL 2 2.1 EXISTING SITE 2 2.2 PROPOSED DEVELOPMENT 2 3 EARTHWORKS 2 4 CONCEPT SITE DESIGN GEOMETRY 3 5 STORMWATER MANAGEMENT 4 6 SEWERAGE 4 7 WATER SUPPLY 4 8 SITE ACCESS 5 9 ELECTRICITY AND COMMUNICATIONS SUPPLY 5 10 CONCLUSIONS 6 Appendices Appendix A Proposed Development Layout Appendix B Detail and Contour Survey Appendix C Dial Before You Dig Information (Service Infrastructure Locations) 205-002-003R Mogpropmanagement Pty Ltd Page ii Engineering Report / Rev 1 Gateway Drive, Noosaville 3/10/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.