Original source · versioned page text
Appendix H - Engineering Services Report Part 1 of 2
Attached to the e-mail MCU14/0083 Appendices.
2 GENERAL 2.1 Existing Site The existing site is currently vacant having recently undergone earthworks as part of the realignment of Gateway drive and the construction of Bunnings. The site is sparsely covered with vegetation including young trees and grass and the clearing of this vegetation will be required as part of these works. The site also contains an advertising sign which is required to be removed prior to development. The site generally falls to the north of the site at an approximate grade of 10% and currently drains to pits on the south side of Gateway Drive. The maximum level on the site is approximately R.L 22.0m AHD along the south boundary falling to R.L 17.0m AHD in the north. Refer to Appendix A. The site currently has no driveway crossovers. 2.2 Proposed Development The proposed development is for a tyre retailer to be located on Lot 102 on SP241371 along Eumundi- Noosa Drive, Noosaville. The total site area is 1,266 m2 and is proposed to consist of 578.9 m2 for the tyre retailer building located along the southern boundary of the site. A total of 15 car parks will be provided on site. Access to the site is proposed to be provided via two locations, an all-movements access to the west on Gateway Drive and a left-in only on the New Gateway Drive to the east. The eastern access is proposed as the designated access for delivery vehicles with a keep clear zone provided to enable adequate storage for a 12.5m HRV to enter the site. It is understood that the access to the east was not favoured by during the pre-lodgement meeting however since then the access has been modified with details discussed in Section 8, it was determined that this second access would allow delivery vehicles to pass through the site rather than requiring an internal turnaround area and provide a safer environment for vehicles and pedestrians as trucks will not be required to complete complicated reversing movements. 3 EARTHWORKS Earthworks will be required on site to enable construction of the proposed building and associated car parking and access. This will be achieved through cut and fill with the intention of achieving a balanced earthworks operation. Earthworks drawings can be seen in drawings number 205-002-C04.01 attached at Appendix B. 205-002-003R Mogpropmanagement Pty Ltd Page 2 Engineering Report / Rev 1 Gateway Drive, Noosaville 3/10/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.