Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Attachment B - Human Movement Data Study

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

INTRODUCTION

 Urbis has been engaged by Queensland Venue Co             Figure 1: Site Location
 Pty Ltd to provide traffic and transport engineering
 advice in relation to the proposed Royal Mail Hotel
 redevelopment (including demolition of the on-site
 bottle-shop, as well as expanding the built form to
 incorporate additional outdoor dining space) for the
 existing Hotel facility, located at 118 Poinciana Ave &
 26 Diyan St, Tewantin.


 A traffic impact assessment (TIA) was previously
 undertaken by Urbis, dated 27/06/2023 which
 outlined the traffic aspects of the overall
 development. Noosa Shire Council (NSC) issued a                                                  Site
 request for further particulars (Ref: MCU23/0090,
 DBW23/0073 & RAL23/0012) dated 16/10/2023 in
 response to the TIA report. Urbis prepared an initial
 response to the request for further particulars dated
 05/04/2024. A request for further advice was issued
 by NSC dated 19/06/24.


 This purpose of this report is to understand the travel
 patterns and behaviours of visitors to the Royal Mail
 Hotel, and the associated car park.




Royal Mail Hotel – HMD Parking Study                                                 21/08/2024          Page 3
Log in to download the original file

Attachment B - Human Movement Data Study.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.