Original source · versioned page text
Attachment B - Human Movement Data Study
INTRODUCTION Urbis has been engaged by Queensland Venue Co Figure 1: Site Location Pty Ltd to provide traffic and transport engineering advice in relation to the proposed Royal Mail Hotel redevelopment (including demolition of the on-site bottle-shop, as well as expanding the built form to incorporate additional outdoor dining space) for the existing Hotel facility, located at 118 Poinciana Ave & 26 Diyan St, Tewantin. A traffic impact assessment (TIA) was previously undertaken by Urbis, dated 27/06/2023 which outlined the traffic aspects of the overall development. Noosa Shire Council (NSC) issued a Site request for further particulars (Ref: MCU23/0090, DBW23/0073 & RAL23/0012) dated 16/10/2023 in response to the TIA report. Urbis prepared an initial response to the request for further particulars dated 05/04/2024. A request for further advice was issued by NSC dated 19/06/24. This purpose of this report is to understand the travel patterns and behaviours of visitors to the Royal Mail Hotel, and the associated car park. Royal Mail Hotel – HMD Parking Study 21/08/2024 Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.