Delegated Report - Code - Planning OPW24/0151 (As published)
a. 36 months for Rehabilitation
*(Refer to Advisory Note)
47. Prior to requesting an On Maintenance inspection, the following information package
(prepared by respective qualified persons* and certifying compliance with approvals) must
be submitted to Council:
a. All required bonds.
b. Rehabilitation / Revegetation certification.
Off Maintenance
48. Prior to requesting an Off Maintenance inspection, the following must be provided:
a. Completion of all rehabilitation works
b. Written request of bond release.
49. Off Maintenance Inspection must be requested:
a. By contacting Council.*
b. Only after lodgement of a completed rehabilitation certification
*(Refer to Advisory Note)
Certification
50. Upon completion of the work a certificate must be issued by an RPEQ certifying that the
works have been constructed in accordance with the Operational Works permit.
51. A final inspection and approval of the new driveway and completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
2251- B Coversheet and Drawing Index, prepared by, 10/24
101 Callaghan & Toth
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
General Advisory Notes
1. As this driveway is a private structure, the owner bears full responsibly for the standard of its
construction, maintenance and any liabilities associated with its construction. It is
recommended that professional advice be sought for the construction of the driveway to
ensure that the driveway is constructed in accordance with standard drawings RS-056 and
any associated addendum.
2. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
Page 11 of 13
Document Set ID: 23391417
Version: 5, Version Date: 06/01/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW24/0151 (As published)Related documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.