Delegated Report - Code - Planning OPW24/0151 (As published)
2251-101 B Cover Sheet and Drawing Index 24 October
2024
Prepared by Callaghan & Toth
2251-102 B Layout and Notes Plan 24 October
2024
Prepared by Callaghan & Toth
2251-103 B Setout and Details Plan 24 October
2024
Prepared by Callaghan & Toth
2251-104 B Driveway Cross Sections and Longitudinal 24 October
Section Plan 2024
Prepared by Callaghan & Toth
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 24 December 2026, unless an application to extend the currency
period is approved by Council.
SITE SPECIFIC CONDITIONS
Bonds
3. Prior to the prestart meeting for the rehabilitation works, a bank guarantee or a bond of
$10,000 must be lodged as security for the completion of the rehabilitation works and three
year performance maintenance period identified in the conditions of this approval.
4. A site control and/or compliance bond of $5,000 is to be submitted to Council prior to the pre-
start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
5. Bonds must:
a. have approval of the bond calculations and amount from Council prior to lodgement
b. be lodged with Council and accompanied by the Bond Administration Fee/s.
c. be requested for release by writing to Council, when relevant approval requirements
have been met.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
6. Prior to requesting a prestart meeting:
a. Submit to Council an amended Bushfire Management Plan in accordance with
Condition 9 of the higher order RAL24/0003.
b. Submit to Council a rehabilitation species palette for the covenant area made up of
species selected from Regional Ecosystem 12.11.10 described as ‘notophyll vine
forest’
7. All necessary approvals from external service providers and external parties on which the
development works are proposed have been obtained and a copy supplied to Council.
8. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting / prior to any works commencing.
Page 5 of 13
Document Set ID: 23391417
Version: 5, Version Date: 06/01/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW24/0151 (As published)Related documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.