Delegated Report - Code - Planning OPW24/0151 (As published)
Stormwater Drainage
26. Appropriate scour protection must be provided at the outlet of all stormwater pipes including
temporary outlets.
27. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (e.g., by blocking or interfering with natural overland flows).
28. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Retention of Existing Trees and Vegetation
29. All trees and vegetation identified for retention must be protected in accordance with AS
4970, Protection of trees on development sites.
Clearing of Vegetation
30. Prior to felling or pruning, all trees are to be inspected for wildlife (i.e. koalas, possums, birds’
nests etc). If wildlife is present, the tree must not be felled or pruned until the wildlife has left
the tree or has been removed by a qualified person*.
*(Refer to Advisory Note)
Plant Pest Management
31. A qualified person* must manage plant pest (weeds) to:
a. Ensure plants listed as Class 1, 2 declared pests and environmental weeds within
Council’s Pest Management Plan are controlled and prevented from spreading.
b. Oversee management techniques that minimise regrowth, prevent damage to non-
target species, retain conservation values and maintains site stability.
*(Refer to Advisory Note)
Land Rehabilitation
32. Rehabilitation works must be supervised, undertaken and certified by qualified persons*.
Where the removal of weed species creates cleared areas within the covenant, these areas
must be revegetated utilising native species from the local Regional Ecosystem 12.11.10.
Trees and shrubs must be planted in these cleared areas at a rate of one plant per metre.
33. A clause must be included in the contract of sale for proposed Lot 362 which provides
unlimited maintenance access to the Covenant for rehabilitation / revegetation works to take
place. This access must be granted until the rehabilitation works have met all performance
criteria and confirmed off maintenance by Council.
34. The following amounts of the bank guarantee/bond may be returned at the end of each
performance criteria year following Council approval as follows:
a. Year 1 - $5,000
b. Year 2 - $3,000
c. Year 3 - $2,000
35. The Rehabilitation supervisor must annually:
a. Organise formal inspection with Council’s delegate*.
b. Submit to Council (with each inspection request) a Rehabilitation Status Report (written
and photographic), mapping:
i. The condition of the regeneration area.
ii. Detailing works undertaken in the previous year.
iii. The percentage cover of indigenous recruitment.
iv. Measuring the works against the conditioned Performance Criteria.
Page 8 of 13
Document Set ID: 23391417
Version: 5, Version Date: 06/01/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW24/0151 (As published)Related documentApplication case desk ↗