Appendix 3 - Stormwater quality management plan
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn
PROPOSED BIORETENTION
GARDEN ‘A’ (MIN. 15m?)
FSL APPROX RL 1.30
INDICATES EXISTING
STORMWATER DRAINAGE
SYSTEM TO BE
DECOMMISSIONED.
PROPOSED STORMWATER JUNCTION
PIT TO BE CONSTRUCTED OVER
EXISTING STORMWATER PIPE.
VY
STORMWATER OVERFLOW PIPE
FROM RAINWATER TANKS IS.
TO BE CONNECTED INTO THE
BIORETENTION AREA.
Si
INDICATES EXISTING
STORMWATER PIPE AND PIT
TO BE DECOMMISSIONED,
PROPOSED RAINWATER
TANKS (15kL STORAGE a " S|
CAPACITY) Z © |
[— INDICATES PROPOSED
SEDIMENT FOREBAY AT
PIPE OUTLETS.
yy
BP SERVICE
STATION
INDICATES PROPOSED FULL
RETENTION SEPARATOR SUCH
AS CLEREFLO FORECOURT
SEPARATOR OR EQUIVALENT.
ELEC
L
_WSio
CoH LT UO
2
FALL |S _FALL
INDICATES PROPOSED
SEDIMENT FOREBAY AT
pie oyruer. i;
7~ PROPOSED BIORETENTION
GARDEN ‘B’ (MIN. 20m?)
INDICATES PROPOSED 55,000L
FUEL STORAGE TANKS.
PROPOSED
PETROL
BOWSERS
1 tT
INDICATES PROPOSED
CANOPY ABOVE FUEL
i BOWSERS.
PIT TO BE CONSTRUCTED ON
EXISTING STORMWATER PIPE
(APPROX IL 0.740).
LEGEND
PROPOSED LANDSCAPING
PROPOSED HARDSTAND
PROPOSED BIORETENTION
GARDEN
HANDRAIL OR BALUSTRADING TO
ARCHITECTS SPEC. AROUND
RECESSED BIORETENTION AREA
PROPOSED STORMWATER
(SIZES TBA)
FALL PROPOSED HARDSTAND FALL
— DIRECTION
—._©0G_____ PROPOSED CHANGE OF GRADE
_ EXISTING STORMWATER
—— FLEC —— EXISTING ELECTRICAL SERVICE
EXISTING WATER MAIN SHOWN
NOMINALLY
EXISTING SEWER MAIN
EXISTING TELECOMMUNICATION
SERVICE SHOWN NOMINALLY
GENERAL NOTES
1. CONTACT EMPIRE ENGINEERING TO DISCUSS
ADDITIONAL OPTIONS FOR DIMENSION AND SETOUT.
2. SURVEY INFORMATION PROVIDED BY INSITE SJC
(REFERENCE GC15-137 D1).
INDICATES PROPOSED JUNCTION
TO
WARNING
THE LOCATION OF ALL EXISTING SERVICES (E.G. TELSTRA|]
ELECTRICITY, SEWERAGE, WATER & GAS) ARE SHOWN
SCHEMATICALLY ON THE DRAWINGS. PRIOR TO AND
DURING CONSTRUCTION OBTAIN THE PRECISE LOCATION OF
ALL SERVICES (UNDERGROUND & OVERHEAD) FROM THE
RELEVANT AUTHORITY RESPONSIBLE FOR THE SERVICE
SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ANY DAMAGE TO EXISTING SERVICES WHETHER SHOWN
ON THE DRAWINGS OR NOT.
PROJECT NORTH SCALES
1125 at Alo
1:250 at A3
125° 2.5 3.75
———
STATUS
5 6.25m
CONCEPT
(TES
1. This is the property of the engineer, and may not be
used, copie, oF reproduced wholly, erin part without
the express pernission of the engineer. Infringement
in any way may result in legal action.
Figured dimensions take precedence over scaled.
3. Verity all dimensions on site.
Date | oft
‘Amendment
BUNDABERG
GLADSTONE
WESSEL PETROLEUM
Project: SERVICE STATION REDEVELOPMENT
CORNER OF MARY ST AND WEYBA RD
NOOSAVILLE
(Designed: TLH [Drawn: TLH
‘Approved:
(Gient: [ checked: RAW
SUNSHINE COAST
ROSS WEGNER / RPEQ: 8042
CONCEPT SITE DRAINAGE PLAN
Date: NOVEMBER 2016 |Scate: AS SHOWN
Job Ref No: Drawing No: | Issue
CC-3668 CONO1 | DRS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.