Appendix 3 - Stormwater quality management plan
Original PDF page 32, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnOperational Management and Maintenance Manual for Stormwater Quality Improvement Devices CC-3668
Table 4.1 – Inspection and Maintenance Plan for Bioretention Systems
Maintenance Preventative / Corrective
Aspect Performance Indicator Inspection Frequency Inspection Activities
Frequency Maintenance Activities
Vegetation
Plant height Average plant height Assess plant height to Increase frequency of watering
>500mm. ensure an average of and application of fertiliser. If
>500mm. necessary, re-establish with
species that are growing well in
other parts of the bioretention
system.
2 monthly during wet
Plant density Minimum 95% vegetation Assess plant densities to Plant additional vegetation to
season / 4 monthly
cover (minimal bare ensure a minimum of 95% increase the density. Increase
during dry season
patches). vegetation cover. the frequency of watering and
application of fertiliser.
Pests and Plants healthy and free from Assess plants for disease, As inspection Prune, treat or replace as
diseases pests and diseases. pest infection, stunted results dictate necessary to remove dead or
growth or senescent diseased vegetation material
plants. and to stimulate new growth.
Weeds No declared weeds (or 2 monthly during wet Identify the occurrence Implement the most appropriate
declared weeds are season / 4 monthly and coverage of any weed control method (e.g. physical
controlled). during dry season. species. removal, containment, biological
Maximum 10% cover of Inspection frequency control, herbicide application,
weeds. may need to be etc) for the weed species
increased whilst identified. Inspection frequency
implementing weed may need to be increased during
control measures. active control of weeds.
Inlet
Erosion Inlet is structurally sound Identify any scouring of Repair damage to the inlet
and there is no evidence of the inlet from storm resulting from scour and if
erosion or subsidence / Immediately following flows. necessary install scour
settlement. first 3 storm events after protection or energy dissipation.
Damaged or No damage that poses a risk construction complete. Check the inlet structure As inspection Repair and/or replace damaged
removed to public safety or structural Then 2 monthly during for any damage or loss of results dictate or lost infrastructure.
structures integrity. wet season / 4 monthly infrastructure.
Sediment, litter No blockage. during dry season Identify any blockage. Remove sediment, litter or
or debris debris to remove blockage or
potential blockage.
6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.