Log in to see the plans as drawnOperational Management and Maintenance Manual for Stormwater Quality Improvement Devices CC-3668
Maintenance Preventative / Corrective
Aspect Performance Indicator Inspection Frequency Inspection Activities
Frequency Maintenance Activities
Batter Slopes and Base Invert (cont.)
Unusual Odours, None detected. Check for any unusual Remove and replace vegetation
Colours or odours, colours or and filter media affected by
Substances (e.g. substances. grease, oil, fuels or other
oil and grease) Immediately following substances, as required.
Litter and Debris Maximum 1 piece per 4m2. first 3 storm events after Check for debris and litter Remove both organic and
construction complete. (including organic litter) As inspection anthropogenic litter and debris
Then 2 monthly during within the bioretention results dictate to ensure flow paths and
wet season / 4 monthly system. infiltration are not hindered.
Algal or Moss Maximum 10% of surface during dry season Identify any algal or moss Resolve why the filter media is
Growth covered in algae and no moss growth. constantly wet, allow the
growth. bioretention system to dry out
and remove algae by hand.
Outlet
Erosion Outlet is structurally sound Identify any scouring of Repair damage to the outlet
and there is no evidence of the outlet from high resulting from scour and if
erosion or subsidence / velocity flows. necessary install scour
settlement, including around protection or energy dissipation.
edges of rock protection or
tow of weir for large
systems.
Damaged or No damage that poses a risk Check the outlet structure Repair and/or replace damaged
removed to public safety or structural Immediately following for any damage or loss of or lost infrastructure.
structures integrity. first 3 storm events after infrastructure.
Sediment, litter No blockage. construction complete. Check for accumulated As inspection Remove accumulated sediment,
or debris Then 2 monthly during sediment, debris and results dictate debris and organic and
wet season / 3 monthly litter (including organic anthropogenic litter to ensure
during dry season litter) within the outlet the functioning of the outlet
structure. structure is not impeded.
Downstream No downstream Check for any Remove sediment where it is
outfall impediments to the release impediments to the impeding the conveyance of the
of water, no erosion or release of water from the outfall. Repair damage to the
damage to the outfall bioretention system (e.g. outfall profile resulting from
structure, and no evidence erosion, damage to scour or rill erosion and if
of malfunction (e.g. structure, sediment necessary re-profile.
accumulation, etc).
8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.