Council archive · source document
10/0515 - Lot reconfiguration (4 to 2) [As Published] · 152010.515
o * Ref 094787 ‘ 3. THE APPLICATION 3.1. Application Details Aspects of Development Reconfiguration of a Lot (4 tots into 2 Lots) Applicant Charter Keck Cramer Level of Assessment Code Assessment Jana Moller c/- CadCon Surveying and Town Planning . Contact Person . od, Phone: (07) 5479 5314 , i. Fax: (07) 5479 1289 : Email: [email protected] - so 3.2 Proposal The proposal seeks to reconfigure the four subject lots into two lots, being Proposed Lot 1 and 2. In particular, it is proposed to create one residential lot of 826m? and one balance lot (1576m?) containing the existing Telecommunication building. As the existing building is currently located on all four existing lots a boundary realignment is necessary to create a lot which can be used for a residential dwelling devoid of any encumbering structures or uses. At the same time the development application seeks to amalgamate the remaining lots to avoid building over boundaries. The proposal also seeks to retain both existing site accesses. The northern access is intended to function as the sole access for Proposed Lot 1. The existing 8 car parks adjoining the northern access will be sufficient for the existing use. The southeastern site access is proposed to be the main access for Proposed Lot 2. The rationale for utilising this access instead of constructing a new access of Delorme Street is that the existing access is in a practical location and in good condition. In an attempt to keep the development cost at a minimum retaining the existing access and parking facilities will provide for an ideal solution. Vegetation will not be cleared as part of this application as it is anticipated that any future owner of Proposed Lot 2 may wish to retain some vegetation. Accordingly, there are no landscaping plans lodged with this application because Proposed Lot 1, being the area surrounding the existing building, will be retained in its current conditions and will not be subject to any further building or operational works. Proposed Lot 2 will likely be landscaped after construction of a future dwelling house. For detailed information about the proposed site layout refer to-the Proposal Plan attached as. Appendix B to this report. CadCon Surveying & Town Planning Page 5 of 10 ae - the « =
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0515 - Lot reconfiguration (4 to 2) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.