Skip to the record
Search everything, all in one place.

Original source · versioned page text

Composting toilet manual

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                      Installation and Operation Manual




                                                      CM LP




           ▪    Thank you for purchasing the Clivus Multrum LP. Please read this manual carefully before installation.
           ▪    “Clivus Multrum” is a brand of Ecoflo Wastewater Management Pty Ltd.
           ▪     Visit our website at ecoflo.com.au


IMCM-203.07.09.2020                            © Ecoflo Wastewater Management Pty Ltd                                    Page 1
Log in to download the original file

Composting toilet manual.pdf · 3.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 21 pages

Page 2

                           Copyright © 2020 Ecoflo Wastewater Management Pty Ltd




                      Please call your local distributor or Ecoflo Wastewater Management for support if required.




                                Ecoflo Wastewater Management Pty Ltd


                                                        ecoflo.com.au
                                                   clivusmultrum.com.au


                                                 Phone: 1300 138 182
                                                 Phone: 07 3889 6144
                                               Email: [email protected]




                                   Proudly Designed and Assembled in Australia
                                        by Ecoflo Wastewater Management



IMCM-203.07.09.2020                              © Ecoflo Wastewater Management Pty Ltd                             Page 2

Page 3

                                                    Table of Content


    WHAT’S IN THE BOX? ................................................................................................................. 4

    CM LP SCHEMATICS ................................................................................................................... 5

    INSTALLATION ............................................................................................................................ 6
        Step 1: Positioning the Pedestal Diagram ................................................................................. 6
        Step 2: Positioning the Waste Chute ......................................................................................... 7
        Step 3: Installing the Waste Chute ............................................................................................ 8
        Step 4: Installing the Wheels to the Composting Chamber ...................................................... 10
        Step 5: Compost Mixer ............................................................................................................ 10
        Step 6: Installing the Compost Chamber ................................................................................. 11
        Step 7: Connecting the Vent Pipe and Fan to the ‘In-service’ Chamber .................................. 12
                  Connect the Flexible Air Hose & Excess Fluid Hose to the Chambers......................... 13

    POWERING YOUR FAN ............................................................................................................. 14
        Mains Power ........................................................................................................................... 14
        Solar Power – refer to Solar Panel Installation Manual ............................................................ 14

    EXCESS LIQUID ABSORPTION TRENCH ................................................................................ 14

    COMPOSTING ACCELERATORS ............................................................................................. 15

    CARE & MAINTENANCE ........................................................................................................... 16

    ROTATION OF CHAMBERS ...................................................................................................... 17

    TROUBLE SHOOTING .......................................................................................................... 18-19

    PRODUCT & COMPONENT WARRANTY ................................................................................. 20

    MAINTENANCE SCHEDULE ..................................................................................................... 21

    APPENDIX 1 ............................................................................................................................... 22




IMCM-203.07.09.2020                                    © Ecoflo Wastewater Management Pty Ltd                                                        Page 3

Page 4

                                  WHAT’S IN THE BOX?

  Please check the packing slip to ensure everything has been delivered.

  If anything is missing, please notify your supplier within 72 hrs of receipt.


  Items you will need to complete your installation:
       Wall brackets to fix the vent pipe to the building
       A length of 100mm DWV vent pipe (to connect to the air exhaust) (length depending on
        specific installation)
       Dektite if DWV vent pipe will penetrate the roof

  You will also require the following materials for the Excess Fluid Absorption Trench (check
  with your local Authority):
       2.0m length of 100mm diameter agricultural pipe
       2.0m x 0.5m synthetic or Hessian geotextile mat
       0.30 cubic metre 20 mm Aggregate
       50mm PVC pipe to connect the hose to the agricultural pipe
  Or

  Purchase a Drain Kit from Ecoflo.

  The following tools will be required to complete the installation:




IMCM-203.07.09.2020                   © Ecoflo Wastewater Management Pty Ltd                    Page 4

Page 5

                            CM LOW PROFILE SCHEMATICS
                450mm




             If you are planning to excavate an area under the house for the compost chambers,
             please ensure the area is well-drained and any retaining walls are built to the satis-
                                         faction of the local authority.




IMCM-203.07.09.2020                    © Ecoflo Wastewater Management Pty Ltd                         Page 5

Page 6

                                           INSTALLATION

  Step 1: Positioning the Pedestal Diagram
               Locate the approximate area where you want the pedestal to go before cutting the hole.
               The usual position for pedestals is centred between side walls.
                (Please note—due to the pedestals being man made the distance to the centre may vary
                from 245—255mm.      Please check before cutting the hole).




IMCM-203.07.09.2020                      © Ecoflo Wastewater Management Pty Ltd                         Page 6

Page 7

           Step 2: Positioning the Waste Chute

                A 240mm hole must be cut in the toilet room floor to accommodate the waste chute.




IMCM-203.07.09.2020                     © Ecoflo Wastewater Management Pty Ltd                      Page 7

Page 8

  Step 3: Installing the Waste Chute
           First ensure the pad or ground level on which the ‘In-service’ chamber will reside is at its final
                                          level beneath the toilet room.




                                                                                                        2
       1                                                           2




                                               Mark the chute




                                                  3                        Mark position                    4




IMCM-203.07.09.2020                        © Ecoflo Wastewater Management Pty Ltd                               Page 8

Page 9

                                                   5                                                       6




  Extra Length Required for Under-floor Areas




        If the Underfloor height exceeds 900mm (floor-to-floor), you will require additional lengths of
        chute, fixed together with small stainless steel self-tapping screws below the flange of the Ad-
        ditional Waste Chute.


        As the Chute joints are Tappered, the top Waste Chute must be inserted through the toilet
        room floor first with Additional Waste Chutes added from below.



IMCM-203.07.09.2020                      © Ecoflo Wastewater Management Pty Ltd                                Page 9

Page 10

  Step 4: Installing the Wheels to the Composting Chamber




    Step 5: Compost Mixer
                      The compost mixer comes pre-assembled and installed in each chamber




                                                                Ring Gear


                                                                Cog
                                                                Mixer Key



                                                                Mixer Rake




                                                                   Crank handle for rotating the ring gear.
                                                                  (Simply place the hook in the eyelet and
                                                                              turn clockwise)



IMCM-203.07.09.2020                     © Ecoflo Wastewater Management Pty Ltd                                Page 10

Page 11

      Step 6: Installing the Compost Chamber

  •     (A brush seal is supplied for the ‘In-service’ lid and acts as a seal to prevent any odour
        emitting from the chamber.) Remove the adhesive cover and place the brush seal on the inside
        surface of the lid as shown below.
  •     Add 50mm depth of bulking agent (supplied) to the chamber to create a bed.
  •     Slide the ‘In-service’ compost chamber lid (with Pre-Cut Hole) up onto the waste chute from
        underneath and place the chamber underneath the lid.
  •     Lower the lid onto the chamber.
  •     Rotate the lid to lock the catch plates onto the pins.
  •     Attach the toggle latches as shown below and the chamber is installed.




              Place brush seal on inside surface of
                   chute extrusion as shown.




                      Toggle latch.



IMCM-203.07.09.2020                       © Ecoflo Wastewater Management Pty Ltd                      Page 11

Page 12

  Step 7: Connecting the Vent Pipe and Fan to the ‘In-service’ Chamber




                                                     The fan runs 24 hours a day to continuously
                                                      circulate air through the compost heap. Air
                                                       is drawn down the toilet pedestal through
                                                     the compost chamber and out the vent pipe.




                                                             Fan & Vent pipe Installation Details




                The fan is IP68 rated so will not be effected by moisture. Do not glue the fan hous-
                ing to the DWV fittings.


IMCM-203.07.09.2020                    © Ecoflo Wastewater Management Pty Ltd                       Page 12

Page 13

 Connect the Flexible Air Hose        & Excess Fluid Hose                 to the Chambers:




IMCM-203.07.09.2020              © Ecoflo Wastewater Management Pty Ltd                      Page 13

Page 14

                                        POWERING YOUR FAN
               Mains Power
            A 240/12 volt regulated transformer is included to run the fan from mains power. Connect the
            fans to the transformer as follows: The positive wire on the transformer is marked with a white
            line. The fan has anti polarity protection and won’t run if connected incorrectly.




                                                                  We recommend a spare fan is kept on hand at all
                                                                        times, particularly after a year of use.

                                                                 Go to Ecoflo Online Store or call 1300 138 182 for
                                                                               replacement or spare fans.




                      Solar Power – refer to Solar Panel Installation Manual



                            EXCESS LIQUID ABSORPTION TRENCH
                         An Absorption Trench Kit is available – Please see Appendix 1.
    Alternatively; If your council allows, you may wish to construct your own Absorption Trench. The Liquid Drain
   Hose should run into either a length of 50mm PVC pipe; drilled to allow liquid to escape, OR a length of slotted
       Ag pipe buried in the absorption trench as shown in the diagram. Both chambers should be connected.




IMCM-203.07.09.2020                            © Ecoflo Wastewater Management Pty Ltd                                 Page 14

Page 15

                                COMPOSTING ACCELERATORS
                      Whilst Clivue Multrum users report successful composting without the use of any addi-
                      tives, we strongly recommend the use of the following in order to optimise composting,
                              particularly when the toilet is in permanent use by more than two people.


     Bulking Agent

            Should be added on a regular basis, preferably a handful after each solid
            use. Alternatively, if this is not possible add the equivalent of this on a daily
            or weekly basis. The bulking agent can be added through the pedestal.

     We Do Not recommend the use of :
            •         sawdust as it creates an anaerobic condition within the chamber.
            •         Cypress, cedar or eucalypt wood shavings due to their antimicrobial properties.
            •         Sugar cane mulch as it makes using the mixer difficult.




    Nature Flush Enzymes

           A 125ml bottle of enzyme concentrate is supplied with the toilet. Please
           refer to the label for instructions and spray into the waste chute. A spray
           flask is provided. Any staining of the pedestal can also be removed with
           the spray.




     Nature Quick Microbes

            Should be used each time a chamber is changed to kick start the
            process in the new chamber.




                        Contact Ecoflo for further supplies when required.




IMCM-203.07.09.2020                         © Ecoflo Wastewater Management Pty Ltd                             Page 15

Page 16

                                       CARE & MAINTENANCE

   Daily or Weekly

       •        Clean restroom & toilet fixtures using only biodegradable cleaners.

       •        Add 1 cup of bulking agent to toilet after every solid use.

       •        Turn the Compost Mixer backwards and forwards once a week; or possibly more often.
                Please read “Compost Mixer” section where for benefits.




                                          Check Ecoflo Online Store for Consumables.



       Note:
       Do not force the compost mixer too much. If it is hard to turn add water to the compost pile
       via the waste chute (approx. 2-4L) and turn the mixer back and forth until it frees up.




   Monthly
        •       Inspect the ‘In-service’ chamber, depends on usage, prepare another ‘In-service’ chamber
                for use once the chamber becomes full (refer to Rotation of Chambers).
        •       Check vent pipe & remove any foreign matter.

        •       Check the fan is operating

        •       Check that system is draining correctly.




      6 months
            •     Remove & Clean fan




IMCM-203.07.09.2020                           © Ecoflo Wastewater Management Pty Ltd                   Page 16

Page 17

                                 ROTATION OF CHAMBERS

    •       Your first rotation of the chambers
                                   It is important to observe safety procedures when dealing with
                                   fresh human waste. Please ensure you wear protective clothing
                                   (gloves and old clothes). Do not attempt to move the chambers on
                                   your own.


            The Clivus Multrum composting toilet chambers will need to be changed on a regular basis. A suf-
            ficient number of chambers must be purchased to allow the ‘Out-of-service’ chamber a minimum
            5 months; depending on climate, from the time they are disconnected from the waste chute.
            1. Prepare a new ‘In-service’ chamber for use (refer to Step 6: Installing the Compost Chamber).
            2. Pour a small bucket of bulking agent (clean mulch) down the pedestal to cover up the waste
                pile before removing the full chamber.

    •       Extra Chamber/s

            The ‘Out of Service chamber should be put in a warm position with the Air Intake Cap at-
            tached to threaded connector and the dust plug attached to the camlock.




        •    Removal of Compost

             The pile should have reduced in size to approximately 20% of its original size and contain a
             maximum of 75% moisture. This ‘humus’ must then be disposed of as per the local health
             department regulations. This normally means digging the humus into the soil and covering
             with at least 100mm of soil.



        •    Returning a Chamber to Service

             1. Ensure all hose and vent connections are clear.
              2. Prepare the ‘In-service’ chamber for use (refer to Step 6: Installing the Compost
                  Chamber).


         If the ‘Out-of-service’ chamber is to be placed away from the Main Vent assembly, you will
        need to dig a small second trench (20 x 20 x 20cms) to allow residual liquid to exit the cham-
        ber. Connect the second liquid drain hose from the chamber to the trench and turn the valve
                                             to the open position.
IMCM-203.07.09.2020                      © Ecoflo Wastewater Management Pty Ltd                             Page 17

Page 18

                                       TROUBLE SHOOTING
                                      Please read this section before using your toilet.

            Find more Trouble Shooting and FAQ information online at ecoflo.com.au/FAQ, or call
                                           us on 1300 138 182.

      Clivus Multrum toilets have proven themselves to be one of the easiest systems to manage. However, be-
      ing a natural process, reliant on a number of factors beyond our control, it can occasionally need some help
      to maintain an appropriate balance.

    The ‘In-service’ chamber is filling too quickly:
    This may be caused by a number of factors:
    The temperature is too low for effective composting.

    Insufficient air flow. ‘

    This can be caused by a broken fan or the chamber being too full. Check the fan is operating and the
    level of the pile is not too high. This problem could also be caused by a blocked insect screen in the
    vent cowl.
    The pile being too wet.

          This could be the result of the outlet of the liquid chamber being blocked and causing the upper
          chamber to flood. (This would also cause the fan to malfunction). Check the drain hose is not
          blocked and flush with a hose if necessary. You may need to change chambers if the blockage
          is in the chamber and thoroughly flush out the contents of the liquid chamber.

    Antibiotics and disinfectants will slow down or stop the process. Restart the composting by
        reintroducing microorganisms. In many of these situations Nature Flush Enzymes will help
        solve inefficient composting by breaking down the solids and thereby speeding up decomposi-
        tion.

    The ‘Out-of-service’ chamber is composting too slowly:
    This may happen due to one or more of the problems described above. At this point the most effec-
    tive course of action is to aerate the pile by turning it over with the Compost Mixer. You could also
    add 500ml of Nature Flush Enzymes from a domestic spray bottle as you turn the material and add a
    quantity of Nature Quick Microbes.

    You should consider locating the chamber where it has a greater exposure to direct sun light. Howev-
    er, if you find the pile is drying out too quickly put the chamber in a shadier position.

    If you find none of the above measures are effective, it means the local climatic conditions are less
    than ideal. This can happen in cold or humid conditions and you will need to purchase an additional
    chamber in order to provide an extended composting period.

    If you need to change your ‘In-service’ chamber and the ‘Out-of-service’ chamber is not yet compost-
    ed, dispose of the waste as normal and order an extra chamber from Ecoflo.




IMCM-203.07.09.2020                        © Ecoflo Wastewater Management Pty Ltd                                Page 18

Page 19

      The odour from the ‘Out-of-service’ chamber is unpleasant:
      If the ‘Out-of-service’ chamber is not connected to the vent pipe it may smell immediately after
      it has been taken ‘Out-of-service’. Odours can be greatly reduced or eliminated by covering the
      top of the pile with straw or dry grass clippings. You may wish to do this before disconnecting
      the chamber.



      The odour from the ‘In-service’ chamber is unpleasant:
      If this is not caused by a failed fan, blockage in the vent pipe, liquid drain hose or Fitting. Please
      see the “‘In-service’ chamber is filling too quickly” section for how to resolve this problem.

      The power has failed resulting in toilet room odours:
      Cover the pedestal with cling film until the power is restored. If you are connected to mains pow-
      er consider installing an Uninterrupted Power Supply (UPS) Available at Ecoflo Wastewater
      Management. The UPS will cut in with power from a 7ah battery when there is a loss of mains
      power.

      Helpful Hints from our customers :
      •    Paint the Vent Stack black to produce an upward air flow.
      •    Add a wind assisted turbo vent to the Vent Stack.



      Mixer not turning

      Do not force the mixer to turn if it is hard. Firstly add water to the compost pile (say 2-4L) and
      leave for an hour. Then attempt to rotate the mixer back and forth until it frees up.
      In the event you have forced the rotation of the mixer, you may bend the blade, which has been
      designed to do this to avoid breaking the gears.
      If the blades are bent, they can simply be straightened when the chamber is changed over.




IMCM-203.07.09.2020                      © Ecoflo Wastewater Management Pty Ltd                                Page 19

Page 20

                      PRODUCT & COMPONENT WARRANTY
  Ecoflo will furnish new parts to a customer whose toilet fails within the allotted warranty period for the
  particular component, provided that our inspection shows such failure is due to defective material or
  workmanship. Any part supplied is warranted for the balance of the original warranty period. The war-
  ranty period for a part begins from the date the original product was dispatched (plus 10 working days
  for transportation).


  Warranty Period:


            Any electrical component including solar                   1 year
            Any rotomoulded component                                  10 years
            Any fibreglass/porcelain/polymarble component              3/4/5 years
            Toilet seats                                               1 year
            Any other component                                        1 year



  This warranty does not cover:
  •     Damage resulting from neglect, abuse, accident or alteration; or damage caused by fire, flood,
        acts of god or other causality.
  •     Damage resulting from failure of the purchaser to follow normal installation and operating proce-
        dures outlined in the manual or in any other printed instructions supplied with the system.
  •     Labour and service charges incurred in the removal and replacement of any parts found defec-
        tive under this warranty.


  Items subject to a dispute, where photographic evidence is inconclusive, must be sent prepaid to
  Ecoflo. The cost will be reimbursed by Ecoflo should the claim be found valid.


  In addition to the above, Ecoflo will only replace a fan that fails during the warranty period under the
  following conditions:
  •     The fan has only ever been connected and powered by either a 12 volt transformer plugged into
        mains power or a solar system supplied by Ecoflo. Connecting your fan directly to a power
        source other than one supplied or specified by Ecoflo may result in damage to the fan and void
        the warranty.
  •     The fan and transformer must not be modified/altered in any way.
  •     The faulty fan is returned to Ecoflo for inspection, if required.


  Providing the above conditions have been met replacement fans are shipped the same or following
  day free of charge by regular post.




IMCM-203.07.09.2020                      © Ecoflo Wastewater Management Pty Ltd                                Page 20

Page 21

                         MAINTENANCE SCHEDULE
  Please place this maintenance schedule close to your ‘In-service’ Chamber and complete the
                              table as you rotate your chambers.

  Model: CM LP

  Date First Put into Service: _____/_____/________

  The ‘Out-of-service’ chamber must compost for a minimum of 5 months from the date
  it was first rotated ‘Out-of-service’.

  Date chambers were last rotated:




                      Wear protective clothing including gloves and eyewear
                      when servicing, rotating or emptying chambers.




IMCM-203.07.09.2020                © Ecoflo Wastewater Management Pty Ltd                      Page 21

Page 22

APPENDIX 1

INSTALLING EVERTRENCH LINERS
FOR SULLAGE - WASTE WATER DISPOSAL

AS/NZS 1547:2012 provides basic information for the design and construction of many on-site waste-water
disposal systems. This manual also includes information offered by EVERHARD, which has found to be of value.
EVERTRENCH injection moulded polypropylene Arched Liners is used for "Conventional" evapotranspiration-
seepage ( ETS) and evapotranspiration-adsorption (ETA) layouts described in the standard.

All waste-water poses a health hazard. All layouts for Wastewater disposal land application areas must
be designed by competent and authorised persons, taking the following factors into account:
The Volume of wastewater, based on household size and appliances.
The rate of absorption of the surrounding soil.
Limits imposed by site conditions, such as slope, contours, prevailing wind and permanent shade etc..

oom

Before beginning design and construction of wastewater disposal system, check State and local
authorities for requirements for your area. Conventional trenches and beds may not be permitted.
Plants should be selected from approved lists for disposal areas, to minimise root intrusion problems.

Method 1: Trenches: These are generally used in sites where soil is permeable
enough to allow projected amounts of wastewater to drain freely into the trench
floor. Trench should be wide enough for the EVERTRENCH Liner and deep
enough for the selected Liner to be not less than 150mm below the surface.

1. Excavate the trench along a level site contour, with the floor not less
than 50mm deeper than the invert of the pipe from the Septic Tank or
sullage distributor, with at least 150mm cover over the top of the Liner.

2. The trench floor should be level, evenly raked, and have no low spots

which would allow “ponding”.

Allow at least 75mm overlap for each length of EVERTRENCH Liner.

Fit Three Brace Bars into each Standard EVERTRENCH Liner, the first

220mm from the inlet end, then equally spaced along the excavation

5. Cut the pipe entry hole in one Trench Liner End Cap, and fit the Caps to

the Liner. Connect piping from the Septic Tank or Sullage Distributor.

Lay geotextile fabric over the full length of Trench Liner.

Place a 150mm layer of 20 - 45mm aggregate material along both sides of the

Trench Liner, and at both ends to secure the End Caps. Rake level

8. Cover the installation with a layer of topsoil, less permeable than the parent
soil to help prevent stormwater entering the trench. Leave a slight mound for
natural compaction. Turf may be laid over the trench area.

DO NOT COMPACT the trench area or expose it to traffic.

Method 2: Beds: These are generally used where soil conditions do not allow the planned volume of wastewater to drain
freely from normal trench systems. Evapotranspiration beds encourage treated wastewater to be taken up by plant roots over
a wide area, as well as draining into the soil, offering additional safety for seepage systems. Beds consist of standard width
trenches, deeper than nomal, with the area above the selected Trench Liner of much greater width, and filled with material
allowing easier penetration of roots and transfer of moisture. Bed designs may vary widely, depending on soil conditions.

BW

NO

 

1. Excavate a bed area between 1000mm and 4000mm wide,
at least 300mm deep along a level site contour.

2. Excavate a central trench along the full length of the
prepared bed, to take a selected Liner. The top of the Liner
should be level with the bottom of the prepared bed, and the
trench floor not less than 50mm below the pipe from the
Septic Tank or sullage distributor. The floor should be level, Sand
evenly raked, with no low spots.

3. Allow at least 75mm overlap for each length of
EVERTRENCH Liner.

4. Fit Three Brace Bars into each Standard EVERTRENCH
Liner, the first 220mm from the inlet end, and then equally
spaced along the excavation

. Cut the pipe entry hole in one Trench Liner End Cap, and fit
the Caps to the Liner. Connect piping from the Septic Tank
or Sullage Distributor.

6. Lay geotextile fabric over the full length of the Liner.

7. Place a 150mm layer of 20 - 45mm aggregate material along
both sides of the Trench Liner, and at both ends to secure
the End Caps, and rake level.

8. Cover the Liner and the floor of the excavated bed with 100mm of coarse sand, then with sandy loam.

9. Laya final 150mm layer of topsoil less permeable than the parent soil, to help prevent stormwater entering the bed.

10. Leave a mound for natural compaction. Turf may be laid over the area.

DO NOT COMPACT the bed area or expose it to traffic

EVERHARD INDUSTRIES Pty Ltd recommends a non-woven needle punched Geotextile
designed for waste-water disposal land applications

aw

 

IMCM-203.07.09.2020 © Ecoflo Wastewater Management Pty Ltd Page 22

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.