Original source · versioned page text
Composting toilet manual
Step 3: Installing the Waste Chute
First ensure the pad or ground level on which the ‘In-service’ chamber will reside is at its final
level beneath the toilet room.
2
1 2
Mark the chute
3 Mark position 4
IMCM-203.07.09.2020 © Ecoflo Wastewater Management Pty Ltd Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.