Delegated Report - Code - Planning OPW24 0025 · OPW24/0025
DEVELOPMENT ASSESSMENT DELEGATED REPORT
Author Graduate Development Engineer, Daniel Epps
Development Assessment
APPLICATION DETAILS
Application No. OPW24/0025
Applicant QRE Construction
Proposal Operational Works - Drainage Works, Earthworks, Landscaping,
Clearing Vegetation under planning scheme, Vehicle Crossover
Properly Made Date 26 February 2024
Information Request Date 14 March 2024
Information Response Date 15 March 2024
Decision Due Date 7 May 2024
Report Reviewed & Mark Lewis – 7 May 2024
Finalised By
PROPERTY DETAILS
Property Address 332 Eastern Branch Rd Kin Kin Qld 4571
RP Description Lot 218 MCH 186
Land Area 196580.00 m²
Existing Use of Land Residential
STATUTORY DETAILS
SEQRP Designation Regional Landscape and Rural Production Area
Zone Rural
Precinct Not Applicable
Local Plan Area Not Applicable
Overlays Landslide Hazard, Flood Hazard, Bushfire Hazard, and
Biodiversity, Waterways and Wetlands
Assessment Type Code
1. PROPOSAL
The application seeks approval for a Operational Works - Drainage Works, Earthworks,
Landscaping, Clearing Vegetation under planning scheme, Vehicle Crossover.
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 14 pages
Page 2
The locality and proposal plan are included below.
Figure 1 – Locality
Figure 2 – Site Plan
Page 2 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
Page 3
Figure 3 – Rehabilitation Site Plan
2. SITE DETAILS
2.1. Background
Council issued a Material Change of Use approval for short-term accommodation (3 cabins) on 12
December 2023 (MCU22/0052).
2.2. Site Description
The development site is encumbered by Council’s mapped Landslide Hazard, Flood Hazard,
Bushfire Hazard and Biodiversity, Waterways and Wetlands Overlays.
2.3. Surrounding Land Uses
The roads that lead into the subject site are subject to flooding, limiting access to/from nearby
townships.
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
• State Planning Policy;
• South East Queensland Regional Plan;
• Planning Regulation 2017; and
• Noosa Plan 2020.
3.2. Noosa Plan 2020
The following codes from the Noosa Plan 2020 are applicable to this development:
Page 3 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
Page 4
• Works Codes – Earthworks, Water Quality and Drainage, Driveways and Parking Code,
Landscaping.
• Overlay Code – Landslide Hazard, Flood Hazard, Bushfire Hazard, Biodiversity,
Waterways and Wetlands.
The application has been found to generally comply with all applicable statutory instruments. The
pertinent issues were assessed as part of the Higher Order Approval. The submitted
documentation was further assessed to ensure the development achieves compliance with the
relevant provisions of The Noosa Plan 2020, any further issues from Council’s assessment are
discussed below:
Rehabilitation – Condition 12 of the Higher Order Approval (MCU22/00522) was not adequately
addressed. The Rehabilitation Plan submitted to Council as part of the subject application did not
adequately provide rehabilitation 10 metres either side of the identified waterway, removal of all
weed species, replanting of trees, shrubs, groundcovers and grasses, and vegetation screening
and batter vegetation. As part of the applicant’s response to Council’s Request for Further
Information, an amended Rehabilitation Plan was provided addressing these issues.
Bushfire – Condition 16 of the Higher Order Approval (MCU22/0052) was not adequately
addressed; a Bushfire Evacuation Plan was not prepared for the site. As part of the applicant’s
response to Council’s Request for Further Information, a Bushfire Evacuation Plan was provided
addressing the condition.
Engineering and Environment believes that the proposed development generally achieves
compliance with the relevant provisions of The Noosa Plan 2020 and recommends the following
conditions.
4. CONSULTATION
4.1. Referral Agencies
Not Applicable
4.2. Internal Council Referrals
The application was forwarded to the following internal Council officers for review and/or comment:
• Senior Environmental Officer
5. CONCLUSION & REASONS FOR DECISION
The proposed development generally complies with the requirements of the planning scheme and
does not raise any significant issues that cannot be addressed by reasonable and relevant
conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No OPW24/0025 for a Operational Works - Drainage Works,
Earthworks, Landscaping, Clearing Vegetation under planning scheme, Vehicle Crossover
situated at 332 Eastern Branch Rd Kin Kin Qld 4571 and described as Lot 218 MCH 186, it is
recommended the application be approved in accordance with the following details for the Decision
Notice:
1. APPLICATION DETAILS
Application No: OPW24/0025
Street address: 332 Eastern Branch Rd Kin Kin Qld 4571
Real property description: Lot 218 MCH 186
Planning Scheme: Noosa Plan 2020 (25 September 2020)
Page 4 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
Page 5
2. DECISION DETAILS
Council decided to issue the following type of approval:
• Development Permit for Approval for Operational Works - Drainage Works, Earthworks,
Landscaping, Clearing Vegetation under planning scheme, Vehicle Crossover
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
APPROVED PLANS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
100 B Site Layout Plan 18 October 2023
Prepared by BAX Engineering
200 B Earthworks Layout Plan 18 October 2023
Prepared by BAX Engineering
201 B Earthworks Sections 18 October 2023
Prepared by BAX Engineering
300 B Overall Roadworks Layout Plan 18 October 2023
Prepared by BAX Engineering
301 B Roadworks Layout Plan Sheet 1 of 2 18 October 2023
Prepared by BAX Engineering
302 B Roadworks Layout Plan Sheet 2 of 2 18 October 2023
Prepared by BAX Engineering
310 B Roadworks Longitudinal Sections Sheet 1 of 2 18 October 2023
Prepared by BAX Engineering
311 B Roadworks Longitudinal Sections Sheet 2 of 2 18 October 2023
Prepared by BAX Engineering
320 B Roadworks Cross Sections Sheet 1 of 3 18 October 2023
Prepared by BAX Engineering
321 B Roadworks Cross Sections Sheet 2 of 3 18 October 2023
Prepared by BAX Engineering
323 B Roadworks Cross Sections Sheet 3 of 3 18 October 2023
Prepared by BAX Engineering
Page 5 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
Page 6
QE-01 Final Environmental Assessment Report 15 August 2022
Prepared by Fox & Co. Environmental
- - Riparian Rehabilitation Plan -
Prepared by Equilibrium Ecology
- 1 Bushfire Hazard Assessment 31 August 2022
Prepared by Equilibrium Ecology
- 1 Bushfire Evacuation Plan 26 January 2024
Prepared by Equilibrium Ecology
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 7 May 2026, unless an application to extend the currency period is
approved by Council.
SITE SPECIFIC CONDITIONS
Bonds
3. A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the
pre-start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
4. Prior to the prestart meeting for the rehabilitation works, a bank guarantee or a bond of
$10,000 must be lodged as security for the completion of the rehabilitation works and three-
year performance maintenance period identified in the conditions of this approval.
5. Bonds must:
a. have approval of the bond calculations and amount from Council prior to lodgement;
b. be lodged with Council and accompanied by the Bond Administration Fee/s; and
c. be requested for release by writing to Council, when relevant approval requirements
have been met.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
6. All necessary approvals from external service providers (e.g., Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
7. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting / prior to any works commencing.
8. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
9. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Landscape works;
Page 6 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
Page 7
c. Erosion and sediment control works; and
d. Other relevant parties.
10. A preliminary Construction Management Plan must be submitted with the Operational Works
application and must address the following:
a. Traffic management during all phases of construction;
b. Adequate parking arrangements for works and deliveries;
c. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD); and
d. provision for safe vehicle and pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased.
11. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
12. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Retention of Existing Trees and Vegetation
13. All trees and vegetation identified for retention must be protected in accordance with AS
4970, Protection of trees on development sites.
Fauna Management
A qualified person* must be engaged to manage fauna prior and during clearing to:
a. Ensure works are carried out in accordance with the approved Environmental
Assessment Report; and the Nature Conservation Act 1992.
b. Undertake pre-clearing inspections including fauna relocation and removal or blocking
of all vacant hollows.
c. Ensure clearing works avoids nesting times of animals and birds.
d. Provide a written report to Council with the request for the prestart meeting of all pre-
clearing activities and initiatives.
e. Co-ordinate staging and sequence of clearing with fauna protection.
f. Protect and recover fauna during clearing operations (fauna not previously removed).
g. Manage the translocation of animals and recovery procedures in accordance with
relevant legislation.
h. Undertake protection works for mulching of any stockpiled vegetation.
*(Refer to Advisory Note)
Plant Pest Management
14. A qualified person* must manage plant pest (weeds) to:
a. Ensure plants listed as Class 1, 2 declared pests and environmental weeds within
Council’s Pest Management Plan are controlled and prevented from spreading.
b. Oversee management techniques that minimise regrowth, prevent damage to non-
target species, retain conservation values and maintains site stability.
*(Refer to Advisory Note)
Land Rehabilitation
Page 7 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
Page 8
15. Rehabilitation works must be undertaken in accordance with the approved Riparian
Rehabilitation Plan prepared by Equilibrium Ecology.
16. Rehabilitation works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice.
17. The following amounts of the bank guarantee/bond may be returned at the end of each
performance criteria year following Council approval as follows:
a. Year 1 - $5,000
b. Year 2 - $3,000
c. Year 3 - $2,000
18. The Rehabilitation supervisor must annually:
a. Organise formal inspection with Council’s delegate*.
b. Submit to Council (with each inspection request) a Rehabilitation Status Report (written
and photographic), mapping:
i. The condition of the regeneration area.
ii. Detailing works undertaken in the previous year.
iii. The percentage cover of indigenous recruitment.
iv. Measuring the works against the conditioned Performance Criteria.
*(Refer to Advisory Notes)
19. Rehabilitation works must meet the following Performance Criteria for:
a. Year One – 12 months after installation:
i. Planted trees have achieved an average height of 1m.
ii. Planted shrubs have achieved an average height of 0.4m.
b. Year Two - 24 months after the installation:
i. Planted trees have achieved an average height of 2m.
ii. Planted shrubs have achieved an average height of 1m.
c. Year Three - Final acceptance installation:
i. Planted trees have achieved an average height of 3m.
ii. Planted shrubs have achieved an average height of 1.2m.
iii. Canopy and / or vegetative strata must not be devoid for any area greater than
1.0m2 within any 10m2 sample.
iv. Plant density shading out and/or self-mulching.
d. The duration of the establishment period:
i. Adherence to maintenance regime for rehabilitation and revegetation areas.
ii. No evidence of woody weeds reshooting from stumps, poisoned trees or the
regrowth of cut stumps.
iii. No evidence of over-weeding or impact on non-target species.
iv. Signs of indigenous recruitment in rehabilitation areas.
v. Weed infestations less than 5% of the rehabilitation areas.
vi. Any failed plants within the previous 12 month period have been replaced.
vii. Healthy and vigorous growth allowed to grow to full form.
viii. Mulch layer sufficient to suppress weeds.
Page 8 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
Page 9
Bushfire Management
20. A qualified person* must be engaged for the duration of the works to ensure:
a. Works are carried out in accordance with the approved Bushfire Hazard Assessment
(Ver. 1) prepared by Equilibrium Ecology dated 31 August 2022.
b. The asset protection zones and the fire management access paths are established for
both the new and existing building envelopes.
Engineering
21. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
22. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
who is independent of the Developer and Principal Contractor, and they must certify that all
works conform to the Operational Works permit. Where municipal works are involved, such
confirmation must be submitted for the respective hold points prior to any site inspection by
Council Officers.
23. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice;
b. The relevant conditions of the higher order Material Change of Use approval viz.
MCU22/0052 to which this approval relates;
c. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines; and
d. The latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site.
Works within Road Reserve/Reinstatement
24. Safe vehicle and pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out construction
works, Council’s Engineering Officer must be notified prior to the proposed closure and all
requirements complied with.
25. All frontage works must match neatly with existing road and verge/footpath features.
Additional works beyond the frontage may be required to provide an acceptable transition to
existing road and verge/footpath profiles.
26. Electrical conduits or other services proposed to be installed within existing and proposed
road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
driveways or significant vegetation must be installed by boring. Trenching is not permitted,
unless specifically approved by Council.
Site Access and Driveways
27. Driveway crossovers must be constructed in accordance with council’s Standard Drawings
RS-056 and any associated addendum.
28. Any existing unnecessary or redundant property accesses must be removed, and the kerb,
footpath and verge area reinstated to match the existing footpath and/or verge treatments.
Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
or turf, and must be maintained by the developer until established.
29. The following must be complied with during the construction of the required
crossover/driveway:
Page 9 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
Page 10
a. The driveway surfacing must consist of either an approved hot mixed asphaltic
concrete or patterned/plain concrete, or an approved all-weather purpose material;
b. The driveway must be constructed so as not to concentrate stormwater runoff onto
neighbouring properties;
c. Underground service conduits for water supply, electricity and any other services must
be provided as part of the access driveway;
d. Where there is an existing pedestrian path, a matching crossfall must be provided for
the driveway on the alignment of the path, for the full width of the path; and
e. The property access must be located a minimum of 1m clear of existing power poles,
streetlights or other signage. The developer is responsible for any necessary relocation
of existing services to provide this clearance and must contact the relevant service
authorities and comply with their requirements in relation to these works.
Earthworks and Retaining Walls
30. All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
on Earthworks for Commercial and Residential Development, with geotechnical testing
undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as
defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and
uniformity of fill shall be provided by a RPEQ and submitted to Council.
31. Slope and batters are a maximum grade of:
a. 1 in 6 where in proximity to waterbodies;
b. 1 in 4 for grassed areas;
c. 1 in 3 for planted areas; and
d. 1 in 2 for combined structural engineering and planting solutions.
Stormwater Drainage
32. Appropriate scour protection must be provided at the outlet of all stormwater pipes including
temporary outlets.
33. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (e.g., by blocking or interfering with natural overland flows).
34. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Erosion and Sediment Control
35. Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
Regulation 2019) must not be released from the site or to waters within the site, or be likely
to be released should rainfall occur, unless all reasonable and practicable measures are
taken to prevent or minimise the release and concentration of contamination.
36. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system, natural waterways, any downstream stormwater filtration
system or adversely impacting on other properties. The sediment and erosion control design
and measures have NOT been approved, it is the site's Supervising Engineer who is
responsible for ensuring that the sediment and erosion control measures have:
a. Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
practise" methods;
b. Been revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and/or methods;
c. Been revised to address predicted rainfall events; and
Page 10 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
Page 11
d. Achieve the desired environmental outcomes.
Council may request further controls to be installed should the implemented measures be
found inefficient.
37. The erosion and sediment control measures must be designed, installed and maintained in
accordance with the supervising engineer instructions and the current best practice
standards * (Refer to Advisory Note).
38. The developer must ensure non-essential exposure of soil is prevented by restricting the
extent of disturbance and minimising the duration of soil exposure to adverse weather
conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
to rainfall occurring.
39. The developer must ensure sediment does not leave the site or enter onto adjoining
properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
machinery. It is essential to implement appropriate approved erosion and sediment control
measures throughout the site during all phases of construction including vehicle shakedown
pad/grid (or similar) at the access to the construction site. Where sediments or other
contaminants are deposited on a road, they must be removed so as not to enter Council’s
drainage system or waterways.
40. Prior to the completion of the development and commencement of use, all site surfaces must
be effectively stabilised using methods which have achieved effective short-term stabilisation
and which will continue to achieve effective stabilisation in the medium to long-term.
For the purpose of this condition, an effectively stabilised surface is defined as one that does
not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion
or lead to sedimentation, or lead to water contamination.
Damage to Services and Assets
41. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION
Certification
42. Upon completion of the work a certificate must be issued by an RPEQ certifying that the
works have been constructed in accordance with the Operational Works permit.
Bonds
43. Performance Bonds must be lodged for:
Rehabilitation
On Maintenance
44. Maintenance periods* must be:
a. 36 months for Rehabilitation or subject to meeting final performance criteria.
*(Refer to Advisory Note)
45. Prior to requesting an On Maintenance inspection, the following information package
(prepared by respective qualified persons* and certifying compliance with approvals) must
be submitted to Council:
a. All required bonds.
Page 11 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
Page 12
b. Landscaping certification.
c. Pest Plant certification.
Bushfire management certification.
Off Maintenance
46. Prior to requesting an Off Maintenance inspection, the following must be provided:
a. Written request of bond release; and
b. Rehabilitation certification confirming all works have been met all performance
outcomes in accordance with conditions of approval.
47. Off Maintenance Inspection must be requested:
a. By contacting Council.*
b. Only after lodgement of all required certification and documentation.
*(Refer to Advisory Note)
48. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
where:
a. a Council inspection reveals works do not comply with approval requirements; or
b. submitted certification falsely states works comply with approval requirements.
49. A final inspection and approval of the new driveway and completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Retention of Existing Trees
1. The existing trees on adjoining properties must be retained and protected during construction
wherever achievable. To avoid doubt, this advisory note is not intended to exclude the
operation of Chapter 3 of the Neighbourhood Dispute Resolution Act 2011 following
construction of the development which is the subject of this development approval.
Removal of Existing Trees and Vegetation
2. Stockpiling mulch to the appropriate volume and separation is required for fire mitigation as
well as optimum weed seed sterilisation.
Qualified Person
3. Qualified Person, for the purpose of:
a. Supervising landscape works and preparing a landscape certification, is considered to
be a landscape architect, landscape designer or horticulturist with a minimum of three
years current experience in the field of landscape design.
b. Undertaking landscape construction and establishment works is considered to be a
person with five years current experience in commercial landscape construction
projects.
c. Undertaking rehabilitation construction and establishment works is considered to be a
person with five years current experience in revegetation and regeneration.
Page 12 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
Page 13
d. Undertaking, supervising tree works and preparing arboriculture certification, is
considered to be a person with a minimum three years current experience in tree
protection, hazard identification/mitigation and AS2302 – Tree stock for landscape use
and either:
i. International Society of Arboriculture (ISA) certification; or
ii. A Diploma of Arboriculture.
e. Managing Fauna protection is considered to be a certified Fauna Spotter Catcher.
f. Preparing certification and managing declared plant pests, is considered to be:
i. a landscape architect with a minimum of 3 years current experience in the field
of pest plant management;
ii. a botanist or ecologist with a minimum of 3 years current experience in the field
of pest plant management;
iii. an environmental consultant with a minimum of 3 years current experience in the
field of pest plant management.
g. Supervising and certifying Bushfire Management is considered to be an Ecologist with
suitable experience or a person with Fire Protection Association Australia – Bushfire
Planning and Design certification.
Landscape Works
4. The applicant must pay the re-inspection fee in accordance with Council's Fees and Charges
Register where:
a. An inspection revealed that any constructed rehabilitation/landscape works do not
comply with the conditions of the Decision Notice, Approved Plans and or Approved
Documents.
b. Certification is submitted to Council falsely stating that works comply with the approved
plans, documents and or conditions of the Decision Notice.
General Advisory Notes
5. As this driveway is a private structure, the owner bears full responsibly for the standard of its
construction, maintenance and any liabilities associated with its construction. It is
recommended that professional advice be sought for the construction of the driveway to
ensure that the driveway is constructed in accordance with standard drawings RS-049, RS-
050 and any associated addendum.
6. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
7. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
8. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Prestart, On and Off Maintenance Inspections Request
9. Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
business days’ notice of preferred inspection time.
Page 13 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
Page 14
10. If Council officers are required to undertake additional inspections of the same works, a
reinspection fee will be applicable in accordance with Council’s Fees and Charges register
applicable at the time.
11. Request for On Maintenance is the responsibility of the developer. No credit will be given
due to failure to request inspection. Maintenance works are the responsibility of the
developer and must include regular inspections, repairs, rectifications and establishment. A
single maintenance run immediately prior to inspection is not acceptable.
Environmental Advisory Notes
12. The Environmental Protection Act 1994 states that a person must not carry out any activity
that causes, or is likely to cause, environmental harm unless the person takes all reasonable
and practicable measures to prevent or minimise the harm. Environmental harm includes
environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
construction and landscaping phases of this development are to adhere to their ‘general
environmental duty’ to minimise the risk of causing environmental harm.
Erosion and Sediment Control
13. Accepted best practice standards include International Erosion Control Association
Australasia Best Practice Erosion and Sediment Control.
14. Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
Engineer of Queensland (RPEQ).
15. As a general rule, a site is determined to have achieved effective short-term stabilisation if
at the time of the plan sealing inspection:
a. Methods of stabilisation are:
• appropriate for slopes and slope lengths; and
• are consistent with best practice environmental management practices such as in
the Manual for Erosion and Sediment Control or the IECA Manual; and
b. Stormwater runoff from the site is not currently, and is not likely to result in visible
evidence of sedimentation or erosion, or lead to water contamination.
Infrastructure Charges
16. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
7. PROPERTY NOTES
The following property notes will be placed against the subject property in Council’s property record
system:
Bushfire Management
1. The owner is advised to access the ‘Bushfire Awareness Package’ including a copy of the
approved Bushfire Hazard Assessment (Ver. 1) prepared by Equilibrium Ecology dated 31
August 2022, the approved Bushfire Evacuation Plan (Ver. 1) prepared by Equilibrium
Ecology dated 26 January 2024, and the Bushfire Prepared Communities brochure or latest
equivalent prepared by the Queensland Fire and Rescue Service (available online at
www.fire.qld.gov.au)
8. VARIATION APPROVAL DETAILS
Not applicable.
Page 14 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
Page 15
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Not applicable.
10. SUBMISSIONS
Not applicable.
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a negotiated decision notice will be
issued. Only one negotiated decision notice may be given.
12. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Page 15 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
Used in these records
Delegated Report - Code - Planning OPW24 0025.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.