Delegated Report - Code - Planning OPW24 0025 · OPW24/0025
10. If Council officers are required to undertake additional inspections of the same works, a
reinspection fee will be applicable in accordance with Council’s Fees and Charges register
applicable at the time.
11. Request for On Maintenance is the responsibility of the developer. No credit will be given
due to failure to request inspection. Maintenance works are the responsibility of the
developer and must include regular inspections, repairs, rectifications and establishment. A
single maintenance run immediately prior to inspection is not acceptable.
Environmental Advisory Notes
12. The Environmental Protection Act 1994 states that a person must not carry out any activity
that causes, or is likely to cause, environmental harm unless the person takes all reasonable
and practicable measures to prevent or minimise the harm. Environmental harm includes
environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
construction and landscaping phases of this development are to adhere to their ‘general
environmental duty’ to minimise the risk of causing environmental harm.
Erosion and Sediment Control
13. Accepted best practice standards include International Erosion Control Association
Australasia Best Practice Erosion and Sediment Control.
14. Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
Engineer of Queensland (RPEQ).
15. As a general rule, a site is determined to have achieved effective short-term stabilisation if
at the time of the plan sealing inspection:
a. Methods of stabilisation are:
• appropriate for slopes and slope lengths; and
• are consistent with best practice environmental management practices such as in
the Manual for Erosion and Sediment Control or the IECA Manual; and
b. Stormwater runoff from the site is not currently, and is not likely to result in visible
evidence of sedimentation or erosion, or lead to water contamination.
Infrastructure Charges
16. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
7. PROPERTY NOTES
The following property notes will be placed against the subject property in Council’s property record
system:
Bushfire Management
1. The owner is advised to access the ‘Bushfire Awareness Package’ including a copy of the
approved Bushfire Hazard Assessment (Ver. 1) prepared by Equilibrium Ecology dated 31
August 2022, the approved Bushfire Evacuation Plan (Ver. 1) prepared by Equilibrium
Ecology dated 26 January 2024, and the Bushfire Prepared Communities brochure or latest
equivalent prepared by the Queensland Fire and Rescue Service (available online at
www.fire.qld.gov.au)
8. VARIATION APPROVAL DETAILS
Not applicable.
Page 14 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW24 0025.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.