07/1256 - MCU - Multiple Housing Type 2 - Duplex [As Published] · 132007.1256

of 56

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

INC@kOK wwe Checklist - Applications Involving Land
Development & Land Use Sections

IDAS APPLICATION

 

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

1.4 Form 4 Part A

 

1.1.1 Ensure that the form is fully completed. V

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.

1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2 Form Part B-O Supporting Information

"

1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [J]
1.1.2.1 Ensure that each of Forms B-O which are attached are fully completed.

 

 

3. 4 Ensure that Part G is completed if EPA referral is required.

 

3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

 

 

   

pert

RM 22 REQUESTETO CHANGEABPROVALIO

4.1. Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

CE

5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational “al
’ Works) accompanies the application. In addition ensure that each set is complete. !

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.

 

  
  

 

 

  
   

 
 
 
 
 

 

   

Ensure that at least 6 copies of any maine accompanies the application (5 for Reconfi iguration

 

and Operational Works). If the application is accompanied by a covering letter, ensure that it is .
capable of reproduction.

 

 

6.2 ‘In the case of reports, ensure that 1 of the oe is in an VAS or A4 format and is unbound. va

 

 

7A Ensure that the application fee, as determined from the Couneir Ss ‘adopted scale’ of fees,
accompanies the application or has been paid.

7.2. Ensure that the fee which has been paid is recorded on the application form. e

 

 

 

 

 

 

Date ... 25% [le LOT. eee

Having completed this form and accepted th¥ application, please deliver both to the following IDAS Application Receiving
trays:-

« if the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

¢ — If the application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.

* — Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

+  Inall other circumstances — AOP1's desk in the Land Use Section.
Please DO NOT leave the application at the counter and’ DO NOT deliver the application to Records.

 

 

 

SEP1 g:\ant\orms\application checklist.doc +
Full text of the other 55 pages

Page 2

 

 

28 June 2007 ken hick:
Our Ref: 070302T AND NICKS

The Chief Executive Officer
Noosa Council

PO Box 141

TEWANTIN QLD 4565

Dear Sir,

DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR MULTIPLE HOUSING
TYPE 2 DUPLEX - 50 PEREGIAN ESPLANADE, PEREGIAN BEACH

Please find enclosed a development application for a material change of use for

Multiple Housing Type 2 Duplex in respect of land at 50 Peregian Esplanade, Peregian
Beach.

In support of the application, please find attached:
* IDAS Form | Parts A, D and Assessment Checklist;
«Six copies of the proposal plans prepared by Foster Designs;
« Six copies of the town planning report prepared by Ken Hicks & Associates; and
= Acheque to Council for the Material Change of Use application fee of $2,570.
Should Council have any query regarding this application, please contact our office.

Yours faithfully
KEN HICKS & ASSOCIATES

Scott Sobey
DIRECTOR

SHIRE couch
FRET CQUNTER &

Rooss

 

 

TOWN PLANNERS | CONSULTING SURVEYORS | URBAN DESIGNERS | PROJECT MANAGERS *

Ken Hicks & Associates Pty Ltd | Suite 7 Dalton Centre, 1 Newspaper Place, Maroochydore BC QLD 4558, PO Box 6380, Maroochydore BC 4558
P 07 5443 2844 | F 075443 7146 | A.C.N.010 278823 | A.B.N. 74 308 405 611

Page 3

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006

 

 

 

  
  
  

 

Bo ated and! x one (1) of more other ited parts'of.the Form as requi fomatin | on the parts’ of the For rote to wo. ibaaid.gov.au. 7; a
: afl Information requested.in the form may be provided in an attachinent to the ap) on. For urttier information about t completing the following details, refer to Guide 4 4.

! iuburbfocality 1 name & postcode) (if applicable) -
50 Peregn Esplanade, Peegin Beach 4573

 

  

 

  
  
  
 
  
 
  
  
  
  
    
    
 

‘identified. However, a description of the ‘tand is
required in relation: to a mobile or temporary
© Environmentally Relevant Activity (ERA).

* Advice for completing Q2 - a2 applies if.

_ development is proposed within a water boty
0

 

 

” Advice for completing Qs - isi land ¢an be-
identified by a lot on plan description. These detail
£.can bé obtained from tte dociiments of throug!
“local government. ” :

“However, ‘ft tnd on whit the development

proposed does not have a ict on plan description (i

the developniént is proposed in ina a water body of,

* watercourse) provide =...

() the lot oni plan description fo the.
adjoiningiadjacentland;or;-

Gi) GPS cooidinates where there is no
adjoining/adjacent tand (eg. in Moreton :

" Advice for compteting Q7 - Q7, does not apply if tie, |: °
~ development is within.a water body. or watercourse.

_ Advics for completing Q8-Q8 applies if |. _-
* development i is within a local government are
1.Note: Arges below high water mark are not within a

~ local government's area unless provided fer under, the
+ Local Government Act 1993.” Le Port authority fi for the: strategic port land or strategic port tand tidal atea on. which the
_ Advice for completing 08 - 09 applies oe :
developmen son statogie port land ora sategic : development i is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)

<p and ate, Fore das Gui 1 vo NIA — |:

7. . Total area of land: (mm or ha):.
[ 804m2 |

 

 

 

 

  
  

 
   
     
  
   
 

 

10. Existing use of the land: (eg. vacant: Singte house; shop etc.’
| Multiple dwelling - -3 units

4 +: “Proposed 8 of the land:/eg- 6 init apariment b wing “30 lot Tesidentiat siblvsion ERA for aquaculture in ‘
ponds with a total area Of 7 ha for Which wastes are released into. waters etc). .

| Multiple rousig Tipe 2 Duplex

proposal details

5 there is insficient coom available, deta
{provided In. pttachment{o the application

 
   
  

  
 

 

 

 

 

 

.. Facsimile numbar/e-mail addréss: |
§443 7146
L scott [email protected]

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

Page 4

eb tw

INTEGRATED PLANNING ACT 1997
Land owner's consent (if applicable)

~- Section 3.2.1(3)} of the IPA prescribes that an.
application must contain, or be supported by, the
writin consént ofthe land owners, the epptcation
involves: = -
“() amaterial change ‘of use;
Gi) reconfiguration of a lot: -

(ii) work on tand below high-water mark & not within pal
canal as defined under the Coastal Protection and | "~~

Management Act 1995;0r
(iv) ‘work of. rail corridor land defined under the

_ Transport Infrastructure Act 1994.”
Section 3.8.1(2)(@) of the IPA provides that
landowner’s consent is not required for a mobite or
For oe information refer to Guide 1,

Part A, Version 2.4, 29 May 2006

20: Land owner’s consent to-the making of this application:

oo a?

 

 

(i) Peter James Colvin

{ii) The Body Corporate 'Clendon’

 

 

 

 

 

 

 

- Resource entitiement (if applicable)
Section 3. 2. 4(8) ofthe IPA requires evidenos of
Tesourcé entittement be given for applications that _
* involve a prescribed State-fesource.
Section 3.2, 1AOjtayti ii} OF the IPA preseribes that an. -
- application Cannot be taken to be property made-
without, ital ‘of the resource entitlement. ~
lettin
Refer to See 10 of the Integrated. Planning

Regulation 1998 that prescribes the nature of evidence} ”

required by the State in support of the lodging of this
development application. | .

i pleting Q23. .
‘The information in (1) = (v) is mandatory if evidence is
required under 022 (ii}or (iii) above. - “
The official stamp of tie. Department of Natural
Resources, Mines and Water ls mandatory where the
application involves. any water or fiverine quany
material under the Wafer Act 2000. .
Section 3.2.1(5A} allows the resource manager to limit
the time tha evidence may be used. 023 (vi} must be
completed if the evidence is fime linited.

 

 

“(Ti the chief executive of the dep: rtment administering the resource is Satisfied the ,
_ development is consistent with. an allocation of, or entitlement to, the. fesource - go
02°.
oO i the chief executive of the departinent administering the resource: ; satisfied the

- development application may‘proceed in the absence of an allocation of, or
entitlement to; the resource ~go to 23

 

 

    

23. Evidence of the resource entitlement :
{i Resource entitiement/-authority: details -

   

- + (vii) Official sta po the department |

administering: the. resource (if
applicable) . ~

 
  

 

(iii) Position ogee fet -

» -{iv}:, Signature of delegated officer

 

 

 

 

 

é pen date of evidence fe eel =

 

 

 

 

 

Assessment triggers

“This checkist does fot apply ifthe application requires]

ihe completion of Parts A and 8 of the Form only. It
must be completed for all other applications.

. Plans | drawings / reports

An application should bé: accompanied by ‘details 0
Support the proposal & enable the assessment -

: Manager, referral agencies and-any person viewing ~:|

‘the application during’ public scrutiny or public.
notification to understand the soope of the proposal
- and any poten impact". .

  

 

24. Is the re ssessment Checklist completed and attached to this application?

. YES” wE, Oo No- thé assessment manager may refuse to accept this application on the .
. grounds thal the application has not been property made

      

 

5 Plans/drawingsiteports accompanying this application:
Plan / Drawing / Report Number

() Refer report

 

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable infomnation required by Part A
- and any other relevant part of Form 1.

OFFICE USE ONLY (applicable to assessment manegers}

: aecenen -

brew! 2575

To fefer RE

 
  

 

 

 

. To.

 

Y Date: of engagement: fof

Notification ‘of. Engagement of Private. Certi ier (Optional formal —

Accreditation Number: : -

 

fs Kursa ne ci OVizse |

       

Cound 1 have. been’ efigaged as the fivate certtifier for the building work tered toi in tis aeefication.

 

 

Signature: _ -

 

Page 5

INTEGRATED PLANNING ACT 1997

Part 0, Version 2.0, 4 October 2004

  

 

|

PAN Form 1 Development Application
YY Material change of use

assessable against a local government’s planning scheme

 

 

mpietion:of all applicable questions onPart Dis mandatory for all applications i

‘on eee
; Co ing assessment of a
' material waar ofuse. 2 assessable against’ a local governments planning scheme!

ik development permit authorises
{development to occur, while a preliminary
approval {g a step in. the approval process

and does not authorise development to occur. |

 

 

 

{The sub subject land

iFor the definiton of ‘gross floor area” go tp
tthe planning scheme against which the
‘application will be assessed!

 

How | the Subject land is identified i in the planning scheme’ (name the zone, pred presi aia)
[ Semi-attached Housing Zone |

   

 

 

 

Existing gross floor area: (if applicable} N/A I

 

Are there:any existing easements on the land?

ENO
LLYEs~ attach plans of the location. and details of the purpose of the easement

 

 

 

 

| iMaterial change of use details

@ [Associated building works details (i,

i

jarea” and. “storey” goo the planning scheme "

‘agaist which the oan will be
sassessed. 3am

   

 

Detaits of the change to the the Use of the land: (eg. vacant tand fo shoppirg centre; house to apartment bulking;
vacant land to industry (tyre manu manutacturing) etc)

| 3 units to Duplex |

 

 

 

Number of employees: | NIA | |

 

 

 

cherating days and hours: “normal for use

 

 

 

  

 

 

 

it 2 storeys / 8m

 

 

 

 

‘Associated realm) a)
‘(if eK

tes RE

D

era: a

  
    
 
 

T

 

‘ Pre
spn cana cannot be accepted unless accompanied by Part A of born’, 08 J VE D

7
a to accept an application that, at the time of lodgement, fails to: tfovide pp owas
requested by Part A and any other relevant part of Form 1. ,

“)f
essment manager)

Details of associated operational w works (eg. landscaping, cut rand fi “anh

    
  
  

 

 

  
     

PLEASE NOTE iY py

 

A ers

   

y.

    

_ oN
ivnccocal Ne

 

Page 6

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007

 
   

IDAS Assessment
Checklist

(Formerly the “Referrals Checklist”)

 

IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

2, Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natura! Resources and Water, Queensland Heritage Council etc.).

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.

4. — Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).

5. [tis the responsibitity of the applicant to accurately complete this checklist.

®@ 6. — Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

7. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

8. The assessment manager for the application will rely on the information provided in this checklist (as weil as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination2.

9. To assist you in answering the following questions a series of guides are available free from the IPA website ww www.ipa.gid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.gid.gov.au.

11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

 

 

| 3.05) SECTION 4 - STATE ASSESSMENT (completion mandatory);

| Note: The ticwing ate a state assessment triggers apply to > deve opment other than for H building work: assessable against the Building Regulation 3 2008.

   

 

 

 

Environmentally relevant activity. |1. The application involves: (tick applicable boxes)

   
 
  

 

 

 

k

{For mare formation referto Guided... =) [J (i) anenvironmentally relevant activity (ERA) for which a code for environmental compliance
Unless you rewered rene atthe sow a. } has not been made - complete Part G of Form 1

{administering authori’. <2, _ (1 (ii) a mobile or temporary ERA for which a code of, ompliance has not been
‘ttan entity, other than.the administering «+ made - complete Part G of Form 1 so

{authority s the assessment manager for the. (ii) none of the above i

application, the administering authority isa = 2
concurrence agency for te patio fn relation

  

 

 

 

fo this matter.“ %
i Note: An aipkcaton invoiing ERA-19 arte 20 i

iil eiso requte completion of Part Kr of Fon. 37 #2 !

_ |r spel hare an slacton under the Wate eB .

tAct 2000 is required wat). Sey BGM supe cous

 

Ce A Uni COURTED TaN/ Continued overleaf

or. my /

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (eppiicabie to assessment manager)
JF DATE RECEIVED | IX REFERENCE NUMBERIS "|

 

 

1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the tPA.

2 For additional information rater to Guide 6 ‘Does my application trigger the referral coordination process?’

3 The ‘administering authority’ may be either the Environmental Protection Agency, the retevant local government {for a devolved ERA) or the Queensiand Department of Primary Industries and
Fisheries (for a delegated ERA).

Page 1

Page 7

INTEGRATED PLANNING ACT 1997

{DAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

 

 

 

:State-controlled road matters 2. The application involves: (tick applicable box/es)

{For more information refer to Guide 3. (J (i) development on land contiguous’ to a State controlled road and for -

"Unless you answered “none ofthe above" 02, . _ oo
ithe application . biggers referral to the Department} (1 (a) material change of use assessable against the planning scheme;

\olMaln Roads (MR) as arefert agency. CO (b) reconfiguring a fot unless -

In certain circumstances DMR will be an advice . .

agency, while in other circumstances DMR will. « the total number of lots is not increased; and
jbe a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
| Schedule 2 ofthe IF Reawlation wl sssst you b Do operational work (not associated with a material change of use assessable against the
concurrence agency for the.application. planning scheme or reconfiguring a lot mentioned in (b) above)-
| « associated with access to a State-controlled road; or
' « for filling or excavation; or

7 ' « involving the redirection or intensification of site stormwater from the land, through a

. pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
. ‘ / CO (ii) development on land not contiguous to a State-controlled road and -
« 0 (a) material change of use -
¢ assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
. * LO (b) reconfiguring a fot for a purpose mentioned in schedute 5 of the IP regulation

: . and exceeding the thresholds set by that schedule;

‘ : | O(c) operational work (not associated with a material change of use assessable against the
i

. planning scheme or reconfiguring a lot mentioned in (b) above)-
. « assessable against the local government's planning scheme; and
mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
7 ‘ | that schedule.
“ . EX] (iii) none of the above
{Clearing vegetation ..» 43. The application involves: (tick applicable box/es)
|For more information refer to Guide 12, = OO (i) material change of use -
| ephain Te (a) assessable against the planning scheme;

aba c* (b) on alot containing -

[itan agency ather than. NRW is the éssessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
{manager for the application, NRWisa, |. « if there is no property map of assessable vegetation for the lot - remnant vegetation;
1 tots mater agency for the application In retation (c) where the existing use of the land is a rural or environmental use; and

if you ticked 30) or (i), your appfcation requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
{Feferral to NRW for assessment regardless of Di (ii) reconfiguring a lot -
iwhether vegetation clearing is proposed or not. .

‘ : (a) on alot containing a category 1, 2 or 3 area shown on a property map of
1. assessable vegetation or, if there is no property map of assessable vegetation for

: roy the lot, remnant vegetation;

: (b) where the size of the lot before the reconfiguration is 2 hectares or larger;

, ‘ (c) where 2 or more lots are created; and

N ‘ . (d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
t. : C1 (il) operational work -

. ‘a) for the clearing of native vegetation where the vegetation clearing is made

i ‘ . g g g
P § assessable under Schedule 8 of the IPA; and

os os (b) not associated with a material change of use assessable against the planning
+ scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of

At Form 1
vy: ‘ EX] (iv) none of the above.

{Strategic port land 4. The application involves:

For more information refer to Guide 11.

if you ticked Q- the relevant Port Authority is the
i (assessment manager for the application.

[ityou ticked (@} Queenstand Transport is.a
‘concurrence agency for the: application.

G

 

 

 

A.

CO (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI

Act) - complete Part ! of Form 1

Q (i) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part | of Form 1

EX (iii) none of the above

 

4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Reguiation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-

controlled road.

Page 2

Page 8

INTEGRATED PLANNING ACT 1997

Acid sulfate soils

For more information refer to Guide 40;

Unless you answered "none of the above" to Q5,
‘the application requires assessment by >
Department of Natural Resources and Water

[ NRW). , .
‘If an-agency other than NRW is the assessment
‘Limanager fer the application, NRW is an advice
agency for the application in relation to this

IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves development on land situated in an identified local government area
and where the surface of the land is: (tick appticable box)
E1 (i) below 20m AHD® and the development will involve the excavation of 1000m? or more of
soil or sediment at or below 5m AHD, or
Li (ii) at or below Sm AHD and the development will involve filling the site with 1000m? or more
of material

1 (iii) none of the above

 

‘Major hazard facilities or possible

major hazard facilities

j,For more information refer to Guide 17.

fl ‘ifyou answered “YES” to Q6, the application:

Yrequires assessment by the Department of v

(Ememency Services (DES). ~~

i ff an agency other than DES is the assessment

manager for the appiication, DES Is a

‘concurrence agency for the. application in
trelation.to this matter.

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

INO

(YES - complete Part L of Form 1

 

 

: Water related development under the

[Water Act 2000

| For more information about items (a) - (1), refer
| to Guide 15. For more Information about fem
gh ert tefer to Guide 14 Does my application: *

involve assessment of a referable ‘lam?

'Untess you answered “none af the above" to Q7,

the application requires assessment by the

| Department of Natural Resources and Water
(NRW). u .

tan agency other than NRW is the assessment

| manager for the application, NRWisa: ="

Itconcurrence ‘agency for the application in

| relation to this matter.

The application involves:
(1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)
C1 (a) in a watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Kz, Ks, Ks, Ke, or Ko of Form 1 whichever is applicable;
( (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
K; of Form 1;
(J (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
US€ - complete Part K: of Form 1;
(1 (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K; of Form 1;
(1 (e) for taking overland flow water in certain areas covered by a water resource plan
- complete Part Ks of Form 1; .
(1 (for interfering with overland flow water in a drainage and embankment area -
complete Part Kroof Form 1
Cg) for constructing a referable dam? or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; of

Bd (ii) none of the above.

 

{Removat of quarry material from a |
| watercourse
{Forme information refer to Guide. 16.

| fyou answered “YES" to Q8, the application
requires assessment by the Departmentof

Natural Resources and Water (NRW)... * |
|| an-agency other than NRW is the assessment
Emanager for the application, NRWisa. “

| concurrence agency for the application in
[relation to this matter, : |

mien +]

j completed as the activity of removing quarry :

| material from a watercourse is also an +

| Environmentaly Relevant Activity (ERA). ;

 

 

 

 

Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?

Kno

(7 YES - complete Parts Kr and G of Form 1

 

 

5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbraoke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Australian Height Datum {AHD).

COrD

Watercourse is defined in sch 10 of the IPA.

‘The declared ground water areas are listed in Guide 13 Development in a declared catchment area.
Referable dam is defined under the Water Act 2000.

Page 3

Page 9

INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work in

j local goverment tidal areas refer to Guide 24.

| Untess you answered “none of the above” to Q9,

} the. application requires assessment by the

4 Environmental Protection Agency (EPA):

| it an agency other than EPA is the assessment:

| manager for the application, EPA is a

‘eoncurrence agency for the application in

{relation to this matter.

T Local government is the assessment manager:
for all prescribed tidal work.

ee

 

9.

IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves operational work that is: ( tick the applicable boxes)

C1 (i) | tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

(1 (ii) _ tidal work that is prescribed tidal work" other than in a canal"? -complete Part P of Form 1; of

D1 (iii) carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a} to (i) below are ticked.

(1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

(J (b) constructing a canal’? intended to be connected to tidal waters;

(©) _ constructing an artificial waterway;

oO (d) reclaiming land under tidal water;

(Je) disposing of dredge spoil or other solid waste material in tidal water;

(1 (Q _ interfering with quarry material on State coastal land above high-water mark;

(1 (g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

(1 (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

(1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

&] (iv) none of the above.

 

 

[Operational work below high water
mark

For more information refet to Guide 18. For
le information about prescribed tidal. work in
‘local government tidal areas refer to Guide 24°
Uniess you answered “none of the above” to
4210, the application biggers referral to

10. The application involves operational work that is: ( tick the applicable boxes)

(i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

CO (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; of
O ili) carried out within a coastal management district'S under the Coastal Act and for -
(1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part

 

 

 

| Qid) as a concurrence ‘agency. :
Local goverment th assessment manager Mof Form 1;
{for al prescribed tidal work. 3 [1 (b) reclaiming land under tidal water - complete Part M of Form 1; or
j (1 (c) constructing a canal, if the canal is associated with reconfiguring a lot - compiete
Part M of Form 1;
f [dl (iv) none of the above.
{Coastal management, : . ” |11. The application involves: (tick the applicable box/es)
fro information refer to Guide 18, ~* (i) a material change of use assessable under a planning scheme involving operational
#Uniess you answered ‘none of.the above” to . i i istricttS
Qi, the app requires by the ; work carried out completely or partly in a coastal management district 7
Environmental Protection Agency (EPA). QO (ii) a material change of use assessable under a planning scheme involving building

[ifn agency other than EPA is the assessment *
¥ manager for the application, EPA is a
‘concurrence agency for the application in
{relation to this matter.

  

10 Tidal work is defined in sch 10 of the IPA.

 

work, carried out completely or partly in a coastal management district that is -
the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m?

(C1 (iii) reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

Ci (iv) reconfiguring a lot'” assessable under schedule 8 of the PA and in connection with
the construction of a canal'2 - complete Part M of Form 1

KI (v)__none of the above

 

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canat means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain fidal works completely or partly within a local government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

18 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.

Page 4

Page 10

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Aprit 2007
Development within:the limits of a 12. Does the application involve development below high water mark’ and within the limits of a port
i (port under the Transport infrastructure Act 1994?
|For more information refettn Guide 18. For NO
{information about prescribed tidal work refer to So
| Guide 24 24. (DYES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
{you answered "YES" to C12, the application
{biggers referral to the Port Authority.
(The Port Authority is a concurrence agency if the
{developments ;
‘within 200m of a shipping channel or an enty
and exit shipping corridor for: the port
ie within 1000m.of a swing, basin, a commercial
+ Shipping wharf, a mooring, anchorage or spall
grounds;
| within 100m of a planned port facility

| identified in a land use plan approved under

 

 

 

 

i, the Transport Infrastructure Act 1994.
t | ir-all other situation the Port Authority is an
[advice agency. 2
i Marinas te 13. Does the application involve operational work that is tidal work for a marina’? with more than 6
(or more information, rete Guide 18 18, For vessel berths?
| information about whether a marina Is prescribed RINo
‘dat work refer to Guide 24,.‘The focal Xd
|dovernmentis the assessment manager fo a . ifthe ti 5 ibed tidal
(presobed dal work (1 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
{lfyou answered "YES" to Q13, the application: *
ee. {triggers referral to Queenstand Fire and Rescue
| Service as an advice agency,
jTidal works in. strategic: port land tidal! 14. Does the application involve tidal works within a strategic port land tidal area20?
areas NO
Mor er cae 0 LD YES - complete Part M of Form 1

fntess you answered *NO" to Q14, the relevant
| Port Authority is the assessment manager for the
| applicaton andthe Envionmenta Protec

| Agency (EPA) and Queensland Transport (QT) -
| @f@ concurrence agencies for. the application.

 

{Heritage vo ‘ “115. Does the application involve development in a heritage registered place as defined under the
{For further information refer to Guide 19. Queensland Heritage Act 1992?

{if you answered "YES" to 15, the apptication No

| tiagers referral to the Queensland Heritage

| Gound es conaurence agency re (CI YES - complete Part C of Form 1
‘application, =

 
  
  
  

ot a ‘y .| 15(b)The application involves: (tick applicable boxes)
ose poner ow the Li (i) amaterial change of use assessable against the planning scheme and the fot shares a
} ental Protection Agency as an advice: | common boundary with a protected area or registered place under the Queensland
{agency for the application: _ Heritage Act 1992;
| . ’ CO (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or

* registered place under the Queensland Heritage Act 1992;

XX (ii) none of the above.

 

iDectared catchmentareas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and

 

For mora information; including a fist of the | involves: (tick the applicable box/es)

inter to cea see witin onepne . OO (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
Unless you answered “none of the above” to C1 (ii) development assessable against the planning scheme involving the establishment or
}16, the appcaton requires assessment bythe | expansion of a waste water disposal system, other than a disposal system for carrying
{ Department of Natural Resources ard Water : ii p i .
H(NRW). , out an environmentally relevant activity under the Environmental Protection Act 1994,
‘tan agency other than NRWis the assessment 1 (iii) none of the above

manager for the application, NRWis a

|concuence: agency for the cpptcation in
jretation to this matter, '

 

 

 

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Page 11

INTEGRATED PLANNING ACT 1997

 

(DAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

 

 

 

{Contaminated land 17. The application involves: (tick the applicable box/es)
: Applications involving material change of use: ~ (0 (i): reconfiguring a fot for which all of part of the premises are -
| reconfig this
feral, ring @ lot may wagers (a) premises mentioned in the IPA, schedule 8, part 4, table 2 -
[Formore information refer to Guide 5. -« item 5, including the exemption otherwise provided for by paragraph {d);
Funes you answered:“none af the above" to « item 6, including the exemption otherwise provided for by paragraph (e); or
| Q17, the application requires assessment by the | « item 7, including the exemption otherwise provided for a mining activity or petroleum
' Environmental Protection Agency (EPA). flan activity; or
| agency other than EPA is the assessment * . . , . | |
[manager for the application, EPA will be a (b) in an area for which an area management advice has been given for unexploded
» concurrence. agency for the application in: ordnance - complete Part N of Form
relation to this matter, 7 .
DO (ii) a material change of use -
. (a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
if : OX] (iii) none of the above
jBlectricty infrastructure * 48. The application involves: (tick the applicable box/es)
[For more information refer to schedute 2of the IP (COQ reconfiguring a lot where any part of the lot is -
Regulation. : pegs we .
 Untess you answered “none: of the above' to ° subject to an easement in favour of a distribution entity or transmission entity under the
hate, tha application triggers referral tothe’ * * Electricity Act 1994 and the easement is for a transmission grid or supply network under
Fanency to which the easement is granted In that Act; or
favour of as adves agency. " * situated within 100m of a substation site;
LI (ii) a material change of use, assessable against a planning scheme and not associated
’ with reconfiguring a lot if -
« any part of the premises is subject to an easement in favour of a distribution entity or
° transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
« any structure or work that is the natural and ordinary consequence of the use is, or will be,
“ located wholly or partly in the easement;
ry D (ili) a materiat change of use, assessable against a planning scheme and not associated
; with reconfiguring a lot if any part of the premises is situated within 100m of a substation
%- : ro, site;
f- . OO (iv) operational work that is filling or excavation assessable against the planning scheme,
j not associated with reconfiguring a lot, if -
i « any part of the premises is subject to an easement in favour of a distribution entity or
4 transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
, the easement;
i & « the work is located wholly or partly within 10m of a substation site;
fe ] (v)_ none of the above.
{Land designated for. community 19. Does the application involve development assessable against the planning scheme and on land
jinfrastructure , designated for community infrastructure?
desgatd tr cor nay wipasouele ray (i) intended to be supplied by a public sector entity; and
(trigger this referral * (ii) on fand not owned by or on behalf of the State; and
i Former information refer to schedule 2 ofthe (iii) other than development -
| Hfyou answered "YES" fo 219, the application (a) for the designated purpose; or
:fequires assessment by the chief executive of i i
{the department ad he (b) carried out by, or on behalf of, the designator.
i the development for the designated purpose. - aie)
Titan agency ather than the destnator i the OO Yes
Jassessment manager for the application, the. .
designating agency will be a concurrence
agency for the application in relation to this
| matter. : - oo

 

 

 

Page 6

Page 12

co

INTEGRATED PLANNING ACT 1997
{SEQ Regional Plan
| For more information refer to schedule 2 of the
Ae Regulation, _
" Refer. to Chapter 2, part 5A and schedule 10 of
jhe integrated Planning Act 1997, and schedule -
12 of the Regulatory Provisions for relevant
i definitions.
i Unless you answered “none of the above” to
020, the application requires assessment by the
[Office of Urban Management (OUM).

i

a
+

——

p

wo set s

|__

IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable box/es) -

CL) (i) a material change of use of premises -
(a) in a Major Development Area in the Urban Footprint for -
OO (i) anurban activity -
(Cs inan area included in a structure plan where the IPA, section 3.1.6
applies;
(2 inan area not included in a structure plan where -

e the IPA, section 3.1.6 applies to the application for the material change
of use; or

« the premises exceeds 10,000m2; or

« the gross floor area (GFA) on the premises will exceed 10,000m2; or

impact assessment is required under the relevant planning scheme
C1 (ii) intensive animal husbandry, or

© (ii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -
OO (i) anurban activity and not specified in section 2.4(2); or
(ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
{c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

{d) in the investigation Area for -
D (i) anurban activity and not specified in section 2.10(2);

D (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or

OO (ii), intensive animal husbandry
(ii) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
(iii) none of the above
——

Oo

 

 

Fisheries matters ae

For more information refer to schedule 2of the IP
‘Requiation. Lo

| Unless.you answered "none of the above” to
Q2t, the application requires assessment by the
Department of Primary Industies and Fisheries
K(OPIBF).

iH an agency other than DPI&F is the assessment
manager for the appfication, DPI8F isa”
‘concurrence agency for the appfication in * -*
relation to items (i) - (Ww) and an advice agency:
{in relation totem () .

 

 

 

21. The application involves: (tick the applicable box/es)
CD (i) an assessable material change of use for aquaculture - complete Part 0; of Form 1;
CI (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1;
Liiiii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;
O tv)
Ow

assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;

development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;

 

EX] (vi) none of the above.

 

Page?

Page 13

INTEGRATED PLANNING ACT 1997

; tntegration. of land use and: public -
itransport
|, For more information refer to Guide 23, schedule

1BA af the IPA, & schedule.2 of the IP Reautation:
i

 

IDAS Assessment Checklist, Version 20, 2 April 2007

22. The application involves: (tick the applicable box/es)—

( (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that

 

 

Unless you answered ‘none af the above", the schedule.
| application triggers referral to OT as a
concurrence agency. D (ii) reconfiguring a lot~
4 ° (1 (a) on land that is completely or partly within a public transport corridor, and the
. total number of lots increases;
(J (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
LO (c) _ onland that is within 400m of a public passenger transport facility or a future
* public passenger transport facility, and the total site area is 5000m? or greater;
(Cd) _ fora residential purpose within the 25 ANEF contour for an airport;
; “ Olle) _ fora residential purpose resulting in 100 or more allotments.
q , O (ii) operational work assessable against the planning scheme, but not associated with a
1 material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
‘ above, on land that—
. (CJ (a@)__ is completely or partly within a public transport corridor or a future public
transport corridor;
(Db) _ will result in work that encroaches into an airport's operational airspace.
@ \ LX] (iv) none of the above.
{Railway saféty and efficiency 23. The application involves: (tick the applicable box/es}—

| For more information refer to Guide 23, schedule
{BA of the IPA & schedule 2 of the IP Requlation.
{Unless you answered “none of the above", the*
| appfication triggers referral to QT as a

| concurrence agency. :

 

 

C1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

0 (ii) reconfiguring a lot—

(J (a) ontand that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

(J (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;

(©) __ onland that abuts rail corridor land, commercial corridor land or future railway

land, and the total number of lots increases;

(1 (a) onland that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
Ce) _ onland thatis completely or partly within 100m of, and abutting an approach

to, a railway level crossing, and the total number of lots increases;
O(f) for a residential purpose resulting in 100 or more allotments.
LD (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on jand that—

O(a) is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(J (b) is completely or partly within future railway land, or a railway tunnel easement,

Cc) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
EX] (iv) none of the above.

 

|Moonie to Brisbane pipeline :
{For more information. refer to schedule 2of the II
|Reguiation.

Unless you answered "none of the above", the
| application triggers referral to the hoMer of
kpipefine licence No t issued under the Petroleum
| Act 1923, currently Santos QNT Pty Ltd, for
{advice. ,

oO

 

 

24. The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

0 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

0 (ii) reconfiguring a lot

CO (ii) operational work assessable against the planning scheme, thats filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

(iv) none of the above.

 

 

Page &

Page 14

INTEGRATED PLANNING ACT 1997

i Koala habitat area

| For more information, refer to Guide 26 and
‘schedule 2 of the IP Regulation.

Unless you answered ‘none of the above’, the
| pplication requires referral the Environment
Protection Agency as a concurrence agency.

+

 

 

IDAS Assessment Checklist, Version 20, 2 April 2007

25. The application involves: (tick the applicable box/es)—

OW) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in -

(1 (a) clearing of native vegetation over an area greater than 2500m2;

(71 (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;

(1 (c) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2,

(1 (d) extracting gravel, rock or sand from an area greater than 5000m?;

(1 (e) excavating or filling an area greater than 5000m?;

(1 (f} additional traffic in a koala conservation area or koala sustainability area,

between 6p.m. on a day and 6a.m. on the following day.

O (il) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in —

(1 (@) anincreased number of ots;
(F (b) clearing of native vegetation over an area greater than 2500m2.

O (ili) operational work in a koala conservation area or koala sustainability area made -
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.

LO (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a fot mentioned in (ii) above) that is not for a domestic activity
and will result in -
(1 (a) clearing of native vegetation over an area greater than 2500m?;
CO (b) extracting gravel, rock or sand from an area greater than 5000m2;
(1 (c) excavating or filling an area greater than 5000m2.

{XI (v) none of the above.

 

wd river area

For more information, refer to Guide 2.

{If you answered YES to Q26, you must also ,
complete section 2 af this checklist. This will
{enable you to determine if your application can
proceed ina wild river area and which referrat
[agency wil assess your application against the
{Wild Rivers Code, or if the proposed *
[development is “prohibited” tn a wild river area”
Note: Development can be ‘prohibited’ in a wit
river area because the application cannot be ~

| accepted by the assessment manager.

 

26. Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?

Dxie)
OOYes

 

 

{Preliminary Approval
\If you'answered YES to 027, the appfication
;tiggers referral to the Department of Locat

. Govemment, Planni ind, Sport end Recreation as
an ain agency.

| i

27. Does the application involve a development for which preliminary approval is sought under
Section 3.1.6 of the integrated Planning Act 1997?

I No
Dyes

 

(Wetlands m ,
|| Domestic activity means the construction ar use
| of a single residence on a lot and any reasonably
associated building or structure. Examples of a
building or structure that could be reasonably
lassociated with a single residence include:
caretaker’s residence, granny flat, building or
| structure used for a home business. : ‘

 

i Note: Wetland is defined'n the Integrated
{Planning Regulation 1998. -
. : :
{Unless you answered “none of the above" to
1028, the application involves referral tothe «
i (Environmental Protection Agency as an atic:
‘agency for the application. - =

 

28. The application involves: (tick the applicable boxes) -
C(i) a material change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;

Dil) reconfiguring a lot
In or within 100m of a wetland that will result in
(1 (@) more than 10 lots being created; or
CJ (b) lots less than 5 hectares;

Bi (iii) none of the above

 

 

Page 9

Page 15

ao

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007

 

{Conservation Estate ~ 29. The application involves: (tick the applicable box/es)—

i roan pur és Sefned in the integrated: = Oa material change of use for urban purposes that is in or within 100m of any of the

(Bamana 07a rors ae ni Oey a tected forest itical habitat f major interest und
é ‘a) a protected area, forest reserve, critical habitat or area of major interest under

fpueses tao reumperrormera the Nature Conservation Act 1992;;

Jeonservation, rural, natural or wikdemess area (1 (b) a State forest or timber reserve under the Forestry Act 1959;

pore. Net gt : (1c) amarine park under the Marine Parks Act 2004;

Uns you ano nore the sbre by LJ (@) a recreation area under the Recreation Area Management Act 1988;

rae the appication ioNes ny es (1 (e) aworld heritage area listed under the World Heritage Convention;

i agency fr Be skate C1 (f} Brisbane forest park under the Brisbane Forest Park Act 1977.

.- CO (ii) reconfiguring a lot if -

C1 (a) any part of the lot is situated in, or within 100m of, any of the following —

a (C() — aprotected area, forest reserve, critical habitat or area of major
. - . interest under the Nature Conservation Act 1992;

ey & (ii) a State forest or timber reserve under the Forestry Act 1959;
ee ‘ ‘2 D (ii) amarine park under the Marine Parks Act 2004;
. Shy Ci (v)_ arecreation area under the Recreation Area Management Act 1988;
woe © (CI (v)  aworld heritage area listed under the World Heritage Convention;
: Ly f Brisbane forest park under the Brisbane Forest Park Act 1977; and

(1 (b) the reconfiguration involves more than 10 lots being created, or any lot
cae resulting from the reconfiguring is less than Sha;
, &_ (iii) none of the above.

 

 

Page 10

Page 16

TOWN PLANNING REPORT

DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE
MULTIPLE HOUSING TYPE 2 DUPLEX

50 PEREGIAN ESPLANADE, PEREGIAN BEACH
LOTS 1 - 3 AND COMMON PROPERTY ON BUP 3759

CODE ASSESSABLE

 

APPLICANT: PETER COLVIN

Prepared By

Ken Hicks and Associates Pty Ltd
PO Box 6380

Maroochydore BC Qid 4558

P 5443 2844| F 5443 7146

ACN 010 278 823 = ABN 74 308 405 611 .

OUR REFERENCE: 070404T ke n h | C ks

DATE: JUNE 2007 AND ASSOCIATES

 

 

Page 17

te “TOWN PLANNING REPORT fl

CONTENTS PAGE

1 EXECUTIVE SUMMARY .........0cccsescsestersneesssssiiesesieeseisesssesaesessacesiesusisesuserssutssressersseararavaseerses 2

2. INTRODUCTION

 

3. SUBJECT PROPERTY AND SURROUNDING AREA....
2.1 Property Location and Details
2.2 Surrounding Land Uses

 

4. PROPOSED DEVELOPMENT |... csscscsessssctsssessesesotseresnssessesseessesiereeressecaeqneqessuteataesssassntentaneceerensenss 2

5. THE NOOSA PLAN...

5.1 Interpretation..........

§.2 Eastern Beaches Locality

4.2.1 Level of Assessment......

4,2.2 Overall outcomes for the Eastern Beaches Locality.

e 5.3 NOOSA PIAN COdES. eee

4.3.1 Eastern Beaches Locality Code...

4.3.2 Residential Uses Code.,

4.3.3 Landscaping Code.......

4.3.4 Engineering Works Codes...

 

  
  
  
 
  

6. CONCLUSION

 

June 2007 Material Change of Use for Multipte Housing Type 2 Duplex Page 2 of 21
50 Peregian Esplanade, Peregian Beach

Page 18

‘TOWN PLANNING REPORT

 

 

ken hicks |
1. EXECUTIVE SUMMARY
Address: 50 Peregian Esplanade, Peregian Beach.
Property Description: Lots 1-3 and Common Property on BUP3759
Site Area: 0.0803.7 Ha (803.7m?2)
Registered Owner(s): Peter James Colvin & The Body Corporate ‘Clendon’
Applicant: Peter Colvin
Contact: Scott Sobey
Ken Hicks & Associates
Ph: 07 5443 2844
Local Authority: Noosa Shire Council
Locality: Eastern Beaches
Zoning: Semi-Attached Housing Zone Zone Map ZM4)
Overlays: None
Proposed Application: Development Permit for Material Change of Use for
Multiple Housing Type 2 (Duplex)
Level of Assessment: Code Assessment
June 2007 Material Change of Use for Multiple Housing Type 2 Duplex Page 3 of 21

50 Peregian Esplanade, Peregian Beach

Page 19

“TOWN PLANNING REPORT

2. INTRODUCTION

This report is intended to accompany a development application for Material Change of Use
prepared by Ken Hicks & Associates for and on behalf of Peter Colvin. The application seeks
Council’s approval for Material Change of Use for Multiple Housing Type 2 (Duplex) on Lots 1-3
and Common Property on BUP 3759, situated at 50 Peregian Esplanade, Peregian Beach. The
property is in the Eastern Beaches Locality, and located within the Semi-Attached Housing
Zone under the provisions of The Noosa Plan.

The purpose of this report is to describe the site, existing and proposed uses, and to address the
relevant town planning and design issues with respect to the proposed development.

This report should be read in conjunction with the accompanying covering letter, IPA
Development Application Forms, and supporting plans and documentation.

ken hicks

ano associates

 

 

Figure 1: Location of subject site at Peregian Esplanade, Peregian Beach.

 

 

 

 

June 2007 Material Change of Use for Multiple Housing Type 2 Duplex Page 4 of 21
50 Peregian Esplanade, Peregian Beach

Page 20

“TOWN PLANNING REPORT

 

 

3. SUBJECT PROPERTY AND SURROUNDING AREA

2.1 Property Location and Details

The property is located at 50 Peregian Esplanade, Peregian Beach, and is described as Lots 1-
3 and Common Property on BUP 3759, and contains a site area of 0.0803.7 Ha (803.7m?). The
site is rectangular in shape, has a length of approximately 31 meters, and a frontage of 25
metres to Peregian Esplanade.

Currently, the site is occupied by older style multiple dwelling units (three units).

 

Figure 2: Aerial Photo of subject site

   

Figure 3: Existing three multiple dwelling units on the site

- s

4

 

 

 

 

 

 

 

 

2.2 Surrounding Land Uses

The subject site is surrounded by established residential urban form. The site is located within
the Semi-Attached Housing Zone, with the surrounding neighbourhood area generally
comprising a mix of duplex and multiple dwelling housing, with some detached housing along
David Low Way and to the west.

The beach is immediately opposite Peregian Esplanade. Beach access is located about 50m
south east of the site. The site is located approx 700m by road to the David Low Way, identified
as a Major Road Network in the Noosa plan. The site is also 1.25km from the Peregian Beach
Village Centre, a local shopping and activity node. The site is considered to be accessible to
this node on a pedestrian/cycle scale due to the scenic amenity, and flatness of the
connecting local walkways and road network.

 

June 2007 Material Change of Use for Multiple Housing Type 2 Duplex Page 5 of 21
50 Peregian Esplanade, Peregian Beach

Page 21

TOWN PLANNING REPORT

 

 

No issues should arise in terms of the compatibility to surrounding uses, due to the consistent
nature of the proposal with the surrounding urban form and precinct.

 

Figure 4: Similar development to the rear of the site (Avocet Parade)

 

Figure 5: Peregian Beach Village Centre

 

 

 

 

 

June 2007 Material Change of Use for Multiple Housing Type 2 Duplex Page 6 of 21
50 Peregian Esplanade, Peregian Beach

Page 22

a
TOWN PLANNING REPORT ‘

4. PROPOSED DEVELOPMENT

The application seeks Council’s approval for Material Change of Use for Multiple Housing Type
2 (Duplex) on Lots 1-3 and Common Property on BUP 3759, situated at 50 Peregian Esplanade,
Peregian Beach. The property is within the Eastern Beaches Locality, and located within the
Semi-Attached Housing Zone under the provisions of The Noosa Plan,

The proposal consists of a duplex with the units in a detached townhouse style arrangement.
Both units have similar layouts; and are equipped with three bedrooms, two bathrooms,
expansive living areas, balconies and a pool area.

The proposal has been designed to utilise the beach frontage and north easterly aspect as
much as possible and alll living areas and balconies will be orientated east towards the beach.

Vehicular access to the site will be gained from Peregian Esplanade, and cars will be parked
underneath each unit in a separate basement level. Each unit will have 2 car parks, one
private (lockable) garage, and one visitor car space. The car parks will be accessed by a
central driveway running up the middle of the site. The basement also includes a large store
room for each unit, and an internal and external staircase entry.

Each unit contains two levels of living space in similar layouts. Level one consists of two (2)
bedrooms, laundry, bathroom, entertainment room and balcony: Level two includes an
ensuited bathroom, kitchen, dining, living and more balcony areas.

The site slopes from the west downwards towards the beach. The site drops about 3.45m from
the western boundary to the east. This has allowed the basement level to be mitigated within
the existing ground level and as a result the proposal effectively only presents 2 storeys to
Peregian Esplanade and surrounding dwellings (see Proposal Plans - Overall East Elevation).

The proposal has been designed to adhere to the required 2 storey/ 8m height limit. Roofing is
skillion style, pitched frorn the west to east: reflecting the natural ground level of the site; and
minimising impact towards Peregian Beach and the Peregian Esplanade frontage.

Landscaping works are proposed throughout the site which contains a total landscaped area
of 455m?, These landscaping works entail about 300m? of softscape, which is more than 60% of
the landscape requirement.

Development statistics are:
iSite'Areq EE | 803.72
‘CFA | 353.22
Population Density] 6.6 persons
“Site Cover NEEEEEEE | 287.92 (36%)
‘Landscaping MME | 455m? (56%)
-Carparking ES | 4 Spaces

 

 

 

 

 

 

 

 

 

 

 

June 2007 Material Change of Use for Multiple Housing Type 2 Duplex Page 7 of 21
50 Peregian Esplanade, Peregian Beach

Page 23

 

“TOWN PLANNING REPORT "
ken hicks

ano atnociates,

5. THE NOOSA PLAN

The following section of this town planning report undertakes an assessment of the proposed
development against the applicable provisions of The Noosa Plan.

5.1 Interpretation

Section 2.11 of the Noosa Plan outlines the defined uses and use classes applicable to the
development of land within the Shire. The proposed development as described in Section 3.0
of this report is defined as a Residential Use - Multiple Housing - Type 2 (Duplex). The definition
is included below:

Multiple housing means the use of premises for two or more dwelling units or

accommodation units as the case may be, occupied by permanent or semi-

permanent residents, where the occupants may share common facilities on the site.
AND

Type 2 Duplex means the use of premises for two dwelling units either attached or

detached, on one lot where the use does not fall under Multiple Housing Type 1

Relative or Employee.

5.2 Eastern Beaches Locality

Part 7 of The Noosa Plan and in particular Zone Map ZM4 identifies the subject site within the
Semi-attached Housing Zone of the Eastern Beaches Locality. It is noted that the subject site is
not subject to any overlay maps.

4.2.1 Level of Assessment

Under the assessment table for the Semi-Attached Housing Zone in the Eastern Beaches
Locality - Residential uses, Multiple Housing Type 2 (Duplex) is a consistent use and is subject to
code assessment.

4.2.2 Overall outcomes for the Eastern Beaches Locality

The following table demonstrates compliance of the proposed development with the
applicable Overall Outcomes of the Eastern Beaches Locality relevant to the proposal.

Overall Outcome
¢) The scale and form of buildings and other structures are—

Proposal
The scale and form of the building is a low rise building,

 

i) designed to be responsive to the informal beachside
character of the locality, being low rise buildings, with
pitched or curved roofs and building materials that
blend with the dune and coastal landscape;

iil) in keeping with the surrounding streetscape and
landscape qualities;

iii) Integrated into the topography and native
vegetation of the dune system which dominates the
locality; and

iv) consistent with the amenity and safety expectations
of the community;

d) Residential developrnent is characterised by—

i) low impact buildings of a domestic scale within
densely landscaped settings;

ii) building designs that are well articulated and that
use design elements, materials that respect the coastal
landscape character;

iii) building designs that avoid hard lines and boxy
shapes characteristic of Mediterranean/Tuscan
influenced design:

\v) Detached housing and Duplexes as the dominant
development form; and

 

implementing varied and pitched roofiines, and will be
constructed of varied and attractive building materials

The proposal is of a scale and design reflected in the
surrounding streetscape and landscape.

The proposal is consistent with the safety and amenity
expectations of the community,

The building will be low impact and set back from
Peregian Esplanade with the majority of landscaping
towards the front of the site, softening Its impact to the
street,

The building design displays a modern architectural
look with pitched and varied rooflines, articulated
facades and materials reflecting a coastal character.

The building design avoids hard lines and boxy shapes
prevalent in Mediterranean/Tuscan influenced design.

The proposed duplex will reinforce duplexes as a
dominant development form.

 

 

June 2007

Material Change of Use for Multiple Housing Type 2 Duplex

Page 8 of 21

50 Peregian Esplanade, Peregian Beach

 

Page 24

“TOWN PLANNING REPORT

ken hicks

 

 

P) For Peregian Beach—
ii) Multiple housing Type 2 Duplex and Visitor

Accommodation Type 4 Conventional are located in
Close proximity to the Peregian Beach neighbourhood

centre shown in the Neighbourhood Centre Zone;

1) For the Semi-attached Housing Zone—residents are
accommodated in Detached housing forms or Duplexes
that— .

i) provide a low impact, low density development which
respects the domestic scale of surrounding detached

housing;

ii) offer a high level of residential amenity, design quality

and safety: and

iii) express a coastal building style that integrates with

the landscape and fopography:

 

The site is considered in proximity, and accessible to
the Peregian Beach Neighbourhood Centre Zone.

The proposal is located in the Semi-Attached Housing
Zone, and the proposal will seek to accommodate
sesidents in a Duplex type arrangement.

The proposal is considered low impact development
which respects the scale of surrounding housing forms.

The building design will promote and maintain a high
level of residential amenity, design and safety.
expressing a coastal style of building design that
integrates with surrounding uses.

 

fh

ano associates

  

 

 

 

5.3 Noosa Plan Codes

In accordance with the assessment table for the Semi-attached housing zone within the
Eastern Beaches locality, the proposal is assessable against the following codes:

* Eastern Beaches Locality Code;

* Residential Uses Code;

« Landscaping Code;

= Engineering Works Codes;
These codes are addressed below.

4.3.1 Eastern Beaches Locality Code

 
 

Specific Outcomes

  

pecific Outcomes and Probable Solutions for the Eastern Beaches Locali
Probable Solutions
(Code Assessable)
17.9 EFFECTS COF USE lem Samm Rac Prager Sil Pel

    
   

Proposal

 

Amenity
Ol Uses are located. designed and
operated to avoid significant

No prescribed solution

Complies
The proposal will not significantly irnpact
upon the existing amenity of users of the

 

David Low Way is protected and
new development recognises

and protects the function, capacity
and efficiency of the David Low
Way as the major north-south link
throughout the coastal part of the
Shire.

adverse changes fo the light. air area.

quality, noise, accessibility or other

conditions enjoyed by users of

associated, adjoining or nearby

uses.

Character and function of the David | No prescribed solution N/A

Low Way The site does not adjoin, nor is visible from
2 The vegetated character of the the David Low Way.

 

| 7.2, BUTE: FOR: amma ee PP SIS 2

 

Density

O3 The density of development
within the slte area—

a) is compatible with surrounding
development:

and

b) does not exceed—

ii. for the Semi-Attached Housing
Zone:

A. for sites between 500m2 and
599m 2 inclusive - 4.8 persons; or
B. for sites 600m2 or more - 6.6
persons. :

No prescribed solution

Complies

The density of the development is
consistent and compatible with the
surrounding development.

Proposed population density does not
exceed 6.6 persons.

 

Height
04 Buildings and other structures—

 

 

$4.1 Buildings and other structures
have a maximum height of —

Complies
The proposed development is located in

 

 

 

 

June 2007

Material Change of Use for Multiple Housing Type 2 Duplex

Page 9 of 21

50 Peregian Esplanade, Peregian Beach

Page 25

“TOWN PLANNING REPORT

 

Specific Outcomes

qa) are low rise and present a
building height consistent with
structures on adjoining and
surrounding land;

b) do not exceed a maximum
height of—
ili. For any other zone— 2 storeys;

¢) do not visually dominate the
street, adjacent properties,
surrounding spaces or the existing
skyline;

d) preserve the amenity of
surrounding land, including existing
sunlight to neighbouring
Properties; and

e) respect the scale of the dune
and coastal vegetation.

Probable Solutions
(Code Assessable)

e) in all other zones— 8m.

ih

ken hicks

Proposal

the Semi-Attached Housing Zone, the
proposal is considered low rise, and is
consistent with surrounding structures.

The development has been designed to
adhere to a maximum height of 2. —~
storeys/8m as depicted on the proposal
plans prepared by Foster Designs.

The Duplex design will not visually
dominate Peregian Esplanade. It will
present a two storey frontage with
pliched roofs lowered towards the
beach and street. softened by
landscaping.

There will be no detrimental effects to
neighbours in terms of existing amenity
and sunlight.

The scale of the dune and coastal
vegetation will be respected and
reflected in the design of the proposal.

 

Setbacks

O85 Buildings and other structures are
appropriately designed and sited
to—

a) provide amenity for users of the
premises as well as preserve the
visual and acoustic privacy of
adjoining and nearby properties;

b) provide adequate distance from
adjoining uses;

Cc) preserve any existing vegetation
that will buffer the proposed
building;

Q) allow for landscaping to be
provided between buildings;

e@) maintain the visual continuity and
pattern of buildings and landscape
elements within the street; and

f) protect the natural character and
visual amenity of the beachfront.

 

 

$5.1 Buildings and structures
comply with the minimum building
setbacks identified in Schedule 1 -
Minimum Boundary Setbacks:

Frontage- 6m for 2 storey
buildings: or for 3 storey building -
6m for the first 2 storeys and 10m
for the third storey

Side boundaries - 1.5m setback
up to 4.5m height: 2m setback
between 4.5m - 7.5m helght; and
2m plus 0.5m for every 3m above
7.5m height or part thereof

Rear boundary - 6m

 

Complies - Alternative Solution for Rear
Setback,

Building setbacks are as displayed on
proposal plans prepared by Foster
Designs and are as follows:

Frontage - (exceeding) 6m
Side Boundaries - 2m
Rear Boundary -5.5 m

As seen above, all setbacks comply with
the Probable Solutions of the code
except for the setback to the rear
boundary, which is considered to
comply with the specific outcomes:

The rear setback is largely 5.5m, with
pop-out shelves that reduce this setback
to 5m for a section of about 2m in length
on the upper level.

itis noted that these pop-out shelves
provide articulation and visual interest to
the rear fa¢gade of the buildings.

The design of the buildings provides
visual privacy to adjoining premises
through screening elements introduced
on the buildings, and the orientation of
key living areas away from adjoining
premises.

The setbacks will provide adequate
distance from adjoining land users.

Existing vegetation will be retained
where possible to buffer the proposed
building, in conjunction with the planting
of new landscaped gardens around the
perimeter of the site.

 

 

 

June 2007

Material Change of Use for Multiple Housing Type 2 Duplex

50 Peregian Esplanade, Peregian Beach

Page 10 of 21

Page 26

*

“TOWN PLANNING REPORT

 

Specific Outcomes

Probable Solutions
(Code Assessable)

fh

ken hicks

Proposal

The existing visual amenity will be
improved due to the construction of
modern architecturally designed
buildings reflecting the beachside
character of Peregian Beach.

The reduced rear setback will provide
improved amenity to residents by
allowing a larger outdoor living space to
be achieved at the front of the site to
maximise benefits from the easterly
aspect towards the beach.

Itis noted that the existing rear setbacks
are less than what is proposed. The
proposed setbacks are sufficient. and
consistent with O& having regard to the
above.

 

Site cover, gross floor area and plot
ratio

6 The site cover, gross floor area
and plot ratio of buildings and other
roofed structures—

Q) results in a building scale that Is
compatible with surrounding
development;

b) does not present an appearance
of excessive bulk to adjacent
properties, roads or other areas in
the vicinity of the site;

c) maximises the retention of existing
vegetation and allows additional
soft landscaping

between buildings;

d) allows for adequate area at
ground level for outdoor recreation,
entertainment, clothes drying and
other site facilities; and

@) facilitates onsite stormwater
management and vehicular access.

07 Site cover does not exceed—

b) for the Semi-attached Housing
Zone-40%;

08 For Multiple Housing Type 2
buildings have a maximum plot ratio
of—

b) 0.6:1 if in the Attached Housing
Zone located in Sunshine Beach or
c) 0.45:1 otherwise.

O10 For the Detached Housing Zone
and Semi-attached Housing Zone—
soft landscaping is provided and
retained over a minimum of 20% of
the site area.

No solution provided

Complies

The buitding scale is compatible with
surrounding development, as the
proposal is of a density and scale
consistent with what is already
established in the precinct.

The buildings will not appear excessively
bulky when viewed from adjacent
properties or Peregian Esplanade.

Existing vegetation will be retained
where possible, with soft landscaping
areas between the building and side
boundaries.

Each unit has areas for outdoor
recreation, inc. balconies and pool area,
and clothes drying area adjacent to the
laundry.

The proposal facilitates onsite stormwater
management and vehicular access,

The site cover of the proposed
development (36%) is less than 40%.

The plot ratio of the proposed
development (0.439:1) is less than 0.45:1

The subject site is located in the Semi-
attached housing zone, and will provide
300m? of soft landscaping, which is 37%
of site area.

 

Flooding and drainage
O12 Buildings and other works are
designed and sited to—

 

$12.1 Floor levels for habitable
tooms are—

 

 

a) for areas where minimum floor

Complies - The site is not considered a
flood prone area. The proposdi will
otherwise comply with all applicable
Probable solutions in the code.

ano anagcuares

 

 

 

June 2007

Material Change of Use for Multiple Housing Type 2 Duplex

50 Peregian Esplanade, Peregian Beach

Page 11 of 21

Page 27

“TOWN PLANNING REPORT

 

Specific Outcomes

a) provide flood free access to
premises and flood free habitable
areas;

b) allow only minor, short term and
infrequent flooding of non-habitable
areas;

c) ensure drainage does not
adversely impact upon other
premises; and

d) ensure filling or excavation does
not adversely impact upon other
premises by—
|, causing ponding on the site or
nearby tand;
il. Increasing flooding, which
adversely affects the safety or
use of any land upstream and
downstream; and
lil. adversely affecting the flow of
water in any overland flow path.

Probable Solutions
(Code Assessable)
levels are available—not less than
the specified level:

b) for areas where flood
modelling is available—a
minirnum of S00mm above the
modelted flood level; and

c) for areas where flood
modelling is not available, a
minimum of 500mm above
the highest known flood level;

AND

$12.2 Where Council infrastructure
is available—

a) any drainage (for buildings and
land) flows to that Infrastructure;
and

b) the infrastructure has the
capacity to accept any
additional loading.

hh

ken hicks

Proposal

 

Roof form

O13 Roof forms—

a) contribute positively to the local
skyline;

b) complement the beachside
character of the locality;

C) use soft and articulated pliched
or curved roof
forms;

d) avoid low pitched (eg. less than 5
degrees) or box profiles/parapets;
and

e) do not create opportunities for
residents to overlook the private
open space areas of neighbouring
properties.

$13.1 The main roof of the building
has a roof pitch no less than 5
degrees and has roof overhangs
a minimum of 600mm wide;

AND

$13.2 Buildings and structures do
not include roof top terraces.

Complies

The proposed roof line of the building has
a roof pitch exceeding 5 degrees with
roof overhangs achieving the minimum
600mm requirement,

No roof terraces are proposed.

 

‘7.11 Environment, Conservation and Recreation, :2 028i’. -iahgk TA SEER TESTOR RE AI LEE TS

 

Environment and cultural heritage
values

O16 There are no significant adverse
effects on biodiversity, natural
vegetation, native fauna

habitat, landscape quality, water
quality or cultural

heritage values, including those
related to—

a) changes to natural drainage:

bb) changes to natural coastal
processes;

C) disturbance of the dune system
and wetland system:

d) management of landslide and
fire risk;

 

e) erosion and the transport of

No solution provided

Advisory note

PSP24 - Effluent Disposal details
requirements for the design and
siting of effluent disposal systems
where located outside a
sewerage service area.
Compliance with PSP24 will be
considered as part of Council's
assessment of the plumbing and
drainage application.

 

 

Complies

The proposal does not have any
significant effects on the biodiversity,
native vegetation, native fauna,
landscape quality, water quality or
cultural heritage vatues In the locality.

Ane agaoerares

 

 

 

June 2007

Material Change of Use for Multiple Housing Type 2 Duplex

50 Peregian Espianade, Peregian Beach

Page 12 of 21

Page 28

«

0

‘TOWN PLANNING REPORT

 

Specific Outcomes

sediments off site;

f) unmanaged public access;
g) effluent disposal;

h) changes to fauna habitat and
behaviour; and

i) disturbance of buildings and
features, including natural features
of cultural heritage

significance.

Probable Solutions
(Code Assessable)

fh

ken hicks

Proposal

ANO assOCIATE

 

Open space network

O17 An integrated open space
network is established, enhanced
and protected throughout

the locality to—

a) provide for both passive and
active recreational pursuits;

b) provide connectivity for
‘pedestrians and cyclists,

c) provide habitat connectivity for
wildlife;

d) protect watercourses and
drainage lines;

@) protect vegetation on steep
slopes; and

f) form a scenic backdrop for
tesidential development.

$17.1 Open space corridors and
existing native vegetation in areas
indicated in Schedule 5 - Map 4
are protected from fragmentation
and encroachment by
development.

Complies

The proposed development does not
adversely impact upon open space
corridors in the area.

 

Pedestrian and bicycle pathways
018 Safe and convenient
pedestrian and bicycle pathways
are provided and retained between
and throughout key destinations
including—

a) an east-west link between the
teach and the northern end of
Lake Weyba via Burgess

Creek:

b) a north-south link between the
Noosa National Park to the north of
the locality and the Shire boundary
near Peregian Beach; and

c) links within and around Sunrise
and Sunshine Beach linking business
and community uses with residential
development.

$18.1 Pedestrian and bicycle
pathways are provided and
retained where indicated in
Schedule 5 - Map 2;

AND
$18.2 Contributions toward a

Pathways Network are provided In
accordance with PSP20.

Complies

Site visits reveal that there is already a
pedestrian and bikeway established
along the frontage of the site, as
indicated in schedule 5 - Map 2. This will
be retained and upgraded as necéssary.

Contributions towards a Pathways
network will be provided in accordance
with PSP20.

 

Beach access points

O19 Access points to the sensitive
fore dune systems are defined and
controlted by the establishment of
key access nodes which are
designed and sited having regard
to the potential adverse impacts
on—

Q) visual amenity;

b) dune stability:

¢) natural habitat; and

d) water quality;

 

No solution provided

 

 

Complies - The site is located in close
proximity to an established and
formalised beach access node.

 

 

 

June 2007

Material Change of Use for Multiple Housing Type 2 Duplex

50 Peregian Esplanade, Peregian Beach

Page 13 of 21

Page 29

8

a

TOWN PLANNING REPORT

 

Specific Outcomes

   
  

AND

©20 Access to the foredune system
and beachfront is via formalised
communal beach accesses, rather
than individual informal tracks.

 

Probable Solutions
Sere ERS ES ood)

   
 
 
 
     
 
   

ken hicks

Proposal

Specific Outcomes and Probable Solutions for the Semi Attached Housing Zone

ode Assessable

i: 7.1 Coornsistec rit Uses Satan. eet

 

032 Tne following defined uses and
use Classes are consistent uses and
are located in the Semi-Attached
Housing Zone—

@) Multiple housing Types 1 oF 2;

No solution provided

Complies

The proposed Multiple Housing Type 2 is
listed as a consistent use within the Semi-
Attached Housing Zone.

 

‘7.19 BUILT FORM a CS a a

 

Streetscape character
O35 Buildings and other structures—

a) contribute positively to the
streetscape character by
addressing the street and adding
visual interest through stepping the
front facades;

b) have a bulk and architectural
scale that does not dominate ihe
streetscape or detract from the
visual amenity of adjoining
properties:

C) present as a small building of a
domestic scale within a landscaped
setting; and

d) present well articulated fagades
where garages or carports are not
the dominant

visual element when viewed from
the street:

036 No more than 2 dwelling units
are located on any sife.

$35.1 The main entrance of the
building faces and is recognisable
from the street;

AND

$35.2 Buildings and other
structures are designed to—

a) have maximum wall length of
15m and each extemal wall

plane incorporates at least one
design elernent to add visual
interest and amenity (such as
windows, pergolas. sun shading
devices, balconies or a change of
building material).

b) vary and break up the roof
form through gables or different
pitches to add visual interest and
define the individual dwelling units
(see Figure 7.2, Figure 7.3 and
Figure 7.4);

d) break up building facades by
incorporating different but
complimentary textures and
building materials; and

@) visually break up the bulk of the.
building by integrating tall plant
species in front of and to the side
of buildings

Complies
The main entrances of the buildings face
the street and are easily recognisable.

The proposal achieves this requirement
with feature elements and design
variations proposed on the building
fagade.

The proposal includes interesting and
modem roof lines and pitch reflecting
the beachside character of Peregian
Beach.

The building fagades will be articulated
as reflected on the proposal plans.

A varlety of landscaping will be
introduced to add visual interest to the
development.

No more than 2 dwelling units cre
located on the site.

 

Garages and carports

037 Garages and carports are
designed and sited to visually
integrate with the building and
avoid dominating the street.

 

 

$37.1 Garages and carports—

a) have a front boundary setback
of at teast 6m; and

b) adopt a roof form and building
style that are the same as that of
the building; and

¢) present a minimum width to
the streetscape (the total width of
garage doors is no more than 6m
or 50% of the frontage width,
whichever is the lesser, where the
structure faces the street); or.

 

Complies - The front setback of the site
exceeds 6m.

The garages are integrated into a
basement level of the building.

The garage doors have a width of less
than 6m,

 

 

 

June 2007

Material Change of Use for Multiple Housing Type 2 Duplex

50 Peregian Esplanade, Peregian Beach

Page 14 of 21

eens ee

Page 30

©.

‘TOWN PLANNING REPORT

 

Specific Outcomes

Probable Solutions

(Code Assessable)
d) that are visible from, but do not
face the street. include windows
or other articulation and have a
6m landscaped buffer between
the structure and the road
frontage; and

$37.2 Covered parking spaces
located in the area between the
dwelling facade and the road
frontage do not comprise
carports.

hh

ken hicks

Proposal

Garages are visible from, but do not
face the street, do not include windows
as they are at basement level, and have
a buffer exceeding 6m between the
garage and Peregian Esplanade.

Not Applicable - Covered car spaces
(visitor parks) are integrated into the
basement level of the proposal, and are
not located between the dwelling
facade and carports.

ano Aunocuaies

 

Front fences and walls

O39 Front fences and walls are
designed and sited

to—

a) contribute to the attractiveness
of the street;

b) be compatible with the existing
streetscape character;

¢c) relate to the architectural
period of the building:

d) avoid interference with the
movement of surface stormwater;

@) allow for casual surveillance from
the street or where premises adjoin
part of the major road network,
mitigate traffic noise;

f) provide for planting in front of high
solid fences and walls; and

g) ensure planting between the
front fence and the footpath does
not create an impediment for
pedestrians using the footpath.

 

 

$39.1 Front fences or walls are—
Q) not forward of the front plane
of the dwelling units; or

b) no more than 900mm high: or
¢) no more than 1.2m high and of
open construction (.e. at least
50% transparent);

 

Complies - Alternative Solution

A 1.8m high fence, with open and solid
sections, and setback landscaped
recesses is proposed along the front
boundary.

This fence will contribute to the
attractiveness of the street and will
provide an improved landscaped
appearance than the many existing
fencing examples within the street.

The fence is compatible with the existing
streetscape character, which has several
solld built to the boundary fences.

The fence wilt be made from the sare
materials, and reflect design principles
established in the architectural style of
the bullding.

The fence will not interfere with the
movement of stormwater.

The design of the front fence will allow
casual surveillance from the street.

The fence will provide recesses to
provide planting towards the footpath,
and will not impede pedestrian
thoroughfare.

Although the fence is higher than what is
specified In the Probable Solution, the
permeable design of the fence,
incorporated planting, and considering
the existing streetscape character,
proposal complies with the Specific
Outcome.

 

 

4.3.2 Residential Uses Code

For Ali Residential Uses

134,52 Effects cf Use stammmmrrrmmmmr-cammryr eimanmcarangmp a0 Sm GR

 

Electricity supply infrastructure

O1 The development does not
adversely impact on existing or
future electricity supply
infrastructure;

AND

02 All uses and works maintain an

 

 

$1.1 No solution provided

$2.1 Development for uses
adjacent to or within 50m of an
existing electricity substation

 

Complies - The development will not
negatively impact on existing electrical
infrastructure. The site Is not located
within 50m of an electricity substation or
under overhead electicity transmission
lines or within electricity easements.

 

 

 

June 2007

Material Change of Use for Multiple Housing Type 2 Duplex
50 Peregian Esplanade, Peregian Beach

Page 15 of 21

Page 31

ay

“TOWN PLANNING REPORT

 

Specific Outcomes

adequate safe distance fromm
electrical infrastructure including
substations, overhead powerlines,
power poles and transformers.

Probable solutions
(Code Assessable)
incorporates noise attenuation
measures to mitigate noise
impacts;
AND
$2.2 Buildings and structures
including swimming pools, sheds,
tennis courts or outbuildings) are
not constructed under overhead
electricity transmission lines, or
within electricity easements;
AND
$2.3 A minimum separation
distance is maintained from the
electricity transmission line to the
closest boundary of habitable
buildings and child activity areas,
as follows—
20m for transmission lines up to
132kV;
30m for transmission jines between
133kV and 275kV; and
40m for transmission tines greater
than 275kV,

hb

ken hicks

an associates

Proposal

 

414.53 Environmentally Sustainable Building Des! gr Saya Zug aC A eee te

 

Hot Water Systems

O3 Hot water systems are installed
and operated to support the
efficient use of natural resources
and minimise consequent pollution
such as greenhouse gas emissions.

 

$3.1 All hot water systerns installed
are— solar systems; or electric
heat pump systems; or natural gas
or LPG systems; or any
combination of a), b) or c).

Compiles ~ The building will implement
hot water systems as prescribed by the
applicable probable solution.

 

Water supply and conservation

Q4 On-site water storage is
designed and operated to support
the efficient use of water;

AND .

O85 On-site water storage is
adequate for occupants every day
use and fire fignting purposes.

$4.1 If in a designated rainwater
tank area as Identified in Map 1 of
Schedule 8, residential uses that
qualify as class 1A or 1B structures
under the Building Code of
Australia have a rainwater tank or
tanks in accordance with
Schedule 8.

AND

$5.1 Where not in a water service .
area a rainwater tank of a
minimum of 60,000 litres is
provided for each dwelling unit,
with the exception of Multiple
Housing Type 1.

Complies - The proposal is identified in
Map | of schedule 8 as being within a
tainwater tank area. A rainwater
harvesting tank will be provided in
accordance with schedule 8.

 

Erosion and sediment control

06 Development does not cause
erosion or result in transport of
sediments off-site.

No solution provided,

Advisory Note

Persons undertaking
development, including building
work, are required under the
Environmental Protection (Water)
Policy 1997 (EPP) to ensure that
sediment and other material
including building waste, sawdust,
concrete, cement or paint are
not deposited or released into a
roadside gutter, stormwater drain
or waterway, or into a place
where it could reasonably be
expected to move or be washed
into a roadside gutter, stormwater
draln or waterway and are not
washed frorn the site. Council
enforces the EPP and penalties
may apply.

Complies - The appropriate measures
will be taken during the construction
stage and beyond to eliminate erosion
and the transportation of sediments from
site.

 

414.54 Amenity. cand Built ferry tte emneinindmnimmnelan sistance SR OL PA

 

Safety and security
07 For Multiple Housing Types 2, 3

 

$7.1 The building entrance is

 

 

clearly identifiable and visible

Complies - The respective building
entrances are clearly identifiable and

 

 

 

June 2007

Material Change of Use for Multiple Housing Type 2 Duplex

50 Peregian Esplanade, Peregian Beach

Page 16 of 21

Page 32

“TOWN PLANNING REPORT

 

Specific Outcomes

and 4, buildings and outdoor spaces
are designed to protect the
personal security and safety of
residents by allowing for natural
surveillance

Probable solutions
(Code Assessable)
from the street, footpath and
driveway;
AND
$7.2 The internal path network
has clear sightilnes to the dwelling
entry and street access points;
AND
$7.3 Visitors have direct access to
the.entrance without passing
through private outdoor living
areas.

hb

ken hicks

Proposal

visible from Peregian Esplanade, the
driveway and the footpath.

The internal path network Is very legible
and contains clear sightiInes to the
dwelling entrance and street access
points. .

Visitors will have direct access to each of
the respective dwellings without passing
through any private areas.

 

Emergency access

O08 For Multiple housing Type 3, 4 &
5, site design and layout ensures
efficient access and egress for
emergency vehicles.

No solution provided

Complies - The site will accommodate
efficient access for emergency vehicles.

AND astoeearen

 

Separation of incompatible uses
09 Development is designed to
minimise noise carrying between
dwelling units or accommodation
units by locating noise sensitive
spaces such as bedrooms away
from noise generating areas of the
development, such as carparking
areas or mechanic plant and
equipment or recreational facillties,

$9.1 Bedroom windows are at
least 3m away from shared
driveways or carparking areas of
adjacent dwelling units or
accommodation units.

Complies - Bedroom windows are alll
located at least 3m away from shared
driveways and carparking.

 

Mechanical plant & equipment
010 Mechanical plant and
equipment associated with
Residential Uses are designed and
located so as not have an adverse
impact on the visual amenity of the
site or surrounding areas.

$10.1 Mechanical plant and
equipment, Including pool and
spa pumps, pool heaters, air-
conditioning units and
refrigeration units are— where
located at ground level, screened
by fencing 1.5m in height or
dense vegetation of at least 1.5m
in width incorporating grouped
trees and shrubs with maximum
separation distance of 1m
measured from the centre of the
plant: and for Multiple housing
Type 2, 3:& 4 are visually
integrated into the line and plane
of the building and roof design
and do not project beyond the
height or width of the building
when viewed from the street and
adjoining properties.

Complies - Mechanical plant equipment
will be appropriately screened and will
otherwise comply with the probable
solutions specified in the code.

 

Ancillary recreation uses

O11 Ancillary recreation uses, such
as outdoor tennis courts and half
netball courts, do not have an
adverse effect on the amenity
enjoyed by users of adjacent or
nearby premises.

$11.1 If the use involves ancillary
use of outdoor courts including
tennis courts, half courts and
netball courts—the use complies
with the requirements in Section 2
of PSP8 Tennis and Other Courts.

Not Applicable - There is no outdoor
ancillary recreational uses proposed
within the development.

 

Privacy

O12 For Multiple Housing Types 2, 3
and 4, building and structures are
designed and sited to ensure the
visual privacy of residents of the
development and neighbouring
properties is protected.

Figure 5-1 Privacy Measures

 

 

 

“rh

 

 

 

 

 

~

 

 

 

 

$12.1 Transparent doors and
windows are designed and
located so they do not directly
face transparent doors or
windows or the private open
space areas of other dwelling
units within 10 metres;

AND

$12.2 Planter boxes, louvre
screens, pergolas, landscaping
and architectural design of
balconies are used to screen the
ground floor private open space
of dwelling units or
accommodation units from upper

 

Complies - Transparent doors and
windows will not be aligned to face
transparent windows or doors of the
other dwelling unit.

Both dwelling units will be separated by
planter boxes located between the two
buildings.

Additionally, the design of the balconies
and living areas has been undertaken in
order to orientate then towards Peregian
Esplanade, the beach and the north
easterly aspects.

 

 

 

June 2007

Material Change of Use for Multipte Housing Type 2 Duplex
50 Peregian Esplanade, Peregian Beach

Page 17 of 21

Page 33

. “TOWN PLANNING REPORT

 

hh

ken hicks

Specific Outcomes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[=~ Bw
my
i at
| 1 |
Inv tet |

 

Probable solutions

(Code Assessable)
level units (refer to Figure 5-1
Privacy Measures which illustrates
how trees, awnings, screens,
fences and planter boxes reduce
minimise the ability to directly look
into neighbouring homes and
yards). .

Proposal

 

Access to Sunlight

O13 For Multiple housing, buildings
and structures are designed and
sited so as not to unreasonably
diminish the existing sunlight to
adjoining residences and
associated private open space
areas;

AND

O14 Multiple housing is designed
and sited to minimise the extent of
shadows cast on solar photovoltaic
cells on roofs of adjoining buildings.

 

 

$13.1 Development does not
reduce sunlight to at least 50% of
the private open space areas of
any adjoining residences to less to
than 2 hours between 9am and
3pm on any day of the year;

OR

$13.2 Where overshadowing by
existing structures and fences
occurs to more than 50% of the
private open space areas of any
adjoining residences, sunlight is
not further reduced by more than
20%.

(See Figure 5-2— Preventing
overshadowing)

Figure 5-2—Preventing

overshadowing

Soadecacioe 1, e
o

oy iLjj 2 oy 7.24

 

   

 

 

 

 

 

 

PLAN - ILLUSTRATES DWELLINGS
THAT ARE SITED TO MAXIMISE
SOLAR ACCESS

 

 

 

 

 

ELEVATION - ILLUSTRATES
BUILDINGS THAT ARE SITED TO
MAXIMISE SOLAR ACESS TO
ADJOINING PROPERTIES THROUGH
ROOF DESIGN AND UPPER STOREY
POSITIONING TO MINIMISE
IMPACTS ON PROPERTIES O THE

SOUTH,
aS

28.
SRG HT or 8 1h TaD Ie |

%

 

 

 

 

 

 

 

 

 

DETAILED ELEVATION - THE
MEASUREMENT AT **” IS 50% OF

 

Complies - The development has been
designed to not reduce sunlight to at
teast 50% of the private open space

areas of any adjoining residences to less

to than 2 hours between Yam and 3pm
on any day of the year.

 

 

dune 2007

Material Change of Use for Multiple Housing Type 2 Duplex

50 Peregian Esplanade, Peregian Beach

 

Page 18 of 21

Page 34

”

ony

* TOWN PLANNING REPORT

 

Specific Outcomes

Probable solutions

(Code Assessable)
THE WIDTH OF THE SOUTHERN
PROPERTY. IT’S NOT AFFECTED BY
SHADOWS FROM THE NORTHERN
NEIGHBOUR, EVEN IN THE MIDDLE
OF WINTER WHEN THE SUN IS LOW.
$14.1_No solution provided

hb

ken hicks

Proposal

ano aasgesares

 

 

Wail length and detailing

O16 Within the Semi-attached

Housing. Attached Housing and

Visitor Mixed Use Zones buildings

and other structures provide for

visual interest and amenity by—
(a) staggering or separating
continuous walls into smaller
sections to vary the elevation:
and
(6) providing well articulated
building forms with strong vertical
design features.

 

$16.1 The maximum wall lengih is
1m;

AND

$16.2 Wall planes incorporate
design elements to add visual
interest and amenity, such as
windows, pergolas, sun shading
devices and variations in balcony
styles.

 

Complies - As evident in the Proposal
Plans, there are no walls longer than 15
metres, Wall planes incorporate design
elements to add visual interest, including;
windows, balconies, sun awnings and
detail. See proposal plans attached,

 

 

For Multiple housing Type 2 Duplex ,
Specific Outcomes Probable solutions Proposal
(Code Assessable)

lk 14.551 Built Form.

 

 

Garages and carports
O17 Garages, carport structures
and vehicle manoeuvring areas are

designed and sited to—
= provide for resident and visitor
parking:

* visually integrate with the
building and to not dominate
the street front;

« — atlow opportunity for
landscaping to screen vehicle
parking and manoeuvring
areas;

= minimise the number of
driveway accesses; and

* — allow safe and efficient access
to and egress from the
premises.

 

$17.1 Where lock up garages are

Included—

* ~~ garages are stepped back a
minimum of 600mrn from
each other. in relation to the
frontage; and

* atleast one open visitor
carpark is provided between
the building and the frontage
and is not restricted by gates,
security screens or other
obstacles;

AND

$17.2 Garages, carports and

uncovered spaces are designed

to allow vehicles to enter and exit
the site in a forward gear through

9 3-point turn maximum:

AND

$17.3 The development provides

for shared driveways to minimise

the number of access points,
except on corner sites where
garages or carports in the
development front separate
streets.

 

Complies ~ There are no proposed lock
up garages directly next to each other.

The garages and visitor spaces are
integrated into the basements’ of the
proposal, and are not directly visible
from the Peregian Esplanade frontage.

Carparking areas will be serviced by a
shared driveway running up the centre
of the site.

Garages and visitor spaces are designed
to allow vehicles to enter and exit the

| site in a forward gear with a 3-point turn.

maximum,

The 6m wide driveway/aisle will allow
vehicles to enter and exit the site in a
forward gear through no more than a 3-
point turn.

 

 

4.3.3 Landscaping Code

The overall outcome is the achievement of a high quality of landscape design that—

a) retains, reinforces and enhances the natural landscape character of the site,

streetscape and locality;

b) retains existing vegetation and other natural features for their ecological, aesthetic

and cultural values;

c) ensures the revegetation and rehabilitation of native wildlife habitat and riparian
zones to protect and enhance ecological and biodiversity values;

 

June 2007

Material Change of Use for Multiple Housing Type 2 Ouptex
50 Peregian Esplanade, Peregian Beach

Page 19 of 21

Page 35

a

aan de

TOWN PLANNING REPORT

hf

ken hicks

qd) facilitates water management including on-site detention and the efficient
infiltration of stormwater;

e) enables the establishment of appropriate plantings that are of a scale and density
commensurate with building height, bulk and scale to buffer development and
conflicting land uses;

f) enhances privacy between dwelling units and accommodation units;

g) accommodates the outdoor recreation needs of dwelling occupants; and

h) provides adequate vegetation treatment to steep slopes and unstabie landforms.

The proposal achieves the overall outcome of the Code in that it:

* achieves a landscape character consistent with the existing Peregian Esplanade and
adjoining nature conservation areas.

«retains and enhances the natural landscape character of the beach frontage:

« facilitates water management and on-site detention of stormwater;

* enables the establishment if appropriate plantings that are of a scale and character
consistent with the exiting urban character

* accommodates the outdoor needs of occupants.

For the Semi-Attached housing zone, the minimum landscape requirement is the proposed
population 6.6 persons) multiplied by 40m? (264m?), though 60% of this area (158m?) must be
soft landscaping.

The development provides a total landscaped area of 455m?, These landscaping works entail
about 300m? of soft landscaping, which is more than 60% of the landscape requirement.

Further details of the Landscaping Code will be addressed within a subsequent application for
an Operational Works Development Permit.

4.3.4 Engineering Works Codes

A Stormwater drainage design has been prepared by Construction Hydraulics and
accompanies this application for preliminary assessment. Water supply and sewerage
reticulation will be separately addressed in a subsequent Operational Works application.
Remaining relevant Engineering Works Code considerations for assessment of the subject
application are carparking provision.

Extracts from the Driveways and carparking Code relating to carparking requirements are:
Table 14-47—Minimum vehicle parking requirements

       
   

   
 
       
     
   

Use Vehicle parking requirements Proposal
Bi ee a
Type 2 Duplex 1 covered space per dwelling unit, 1 private and
AND 1 visitor space
l space for visitor parking, accessible at all times for each unit

 

The table above shows the amount of spaces required and provided for the proposal. The
proposal has provided car parking that is consistent with the provisions of planning scheme.

The code does not prescribe any minimum requirement for bicycle parking, though it is
considered that the large store rooms in the basement level of each unit will be able to cater
for bicycle storage at the owners’ discretion.

The proposal therefore meets the minimum parking requirements prescribed in the driveways
and car parking code, and otherwise will meet all other specific solutions of the code.

 

June 2007 Material Change of Use for Multiple Housing Type 2 Duplex Page 20 of 21
50 Peregian Esplanade, Peregian Beach

40 ANG CIArES

Page 36

a ABM
TOWN PLANNING REPORT
ken hicks

ano augociates

6. CONCLUSION

This planning report demonstrates that approval for the proposed Material Change of Use for
Multiple Housing Type 2 Duplex is warranted subject to the imposition of reasonable and
relevant conditions on the following basis:-

The proposed development is in accordance with the applicable Planning Scheme Codes
being the:-

* Eastern Beaches Locality Code;

» Residential Uses Code

*» Landscaping Code:

* Engineering Works Codes;

Where not compliant with the listed probable solutions of applicable codes, alternative
solutions have been provided demonstrating that the corresponding Specific Outcomes have
been satisfied.

@ The proposal is classed as a consistent use as per the Eastern Beaches Locality Code and the
Table of Development Assessment for the Semi-attached housing Zone.

The proposal is consistent with the established character and development form of the
surrounding Semi-Attached Housing Zone. The proposal will positively contribute to the
upgrade and enhancement of the existing Peregian Beach urban form.

 

June 2007 - Material Change of Use for Multiple Housing Type 2 Duplex Page 21 of 21
50 Peregian Esplanade, Peregian Beach

Page 37

 

 

aon . LAND USE SECTION FEES :
oy Dae :

RECEIPT TYPE

SALE OF DOCUMENTS . .
Superseded Planning Scheme’ Documentation §20
Copy of Permit/Approval Letter . 110
The Noosa Plan Documentation . 111

APPLICATION FEES

Material Cha Use CoseD pact
‘onsiste! Z570 521
‘Onsistent 521

- Assessment under Superseded Planning Scheme 521
Modification to a Development Permit ; §21
Extension of a Currency Period ‘ §21
Operational Works - Landscaping 521
e} ’ Bldg Work assessable against the Planning Scheme = ~ §21
_ PRE LODGEMENT REVIEW .
Half Hour 522
_ One Hour 522
ADVERTISING
: Purchase Advertised Applications — . : 523
JETTIES :
Jetty Application Fee 524
* Jetty Bond : , 51
oo : . (Category 4)
BONDS © : :
Performance Bond . . . : 51
: . . (Category 9)
SIGNS Lo
Registration Fee , . _ . - 222
se@ FEE . : .
Search of Land Use Section file 112
Liquor Licensing Request , 113 .

TOTAL. $ 2570

 

NAME: or AZ f2ter) Ce

 

 

| fo Ber. 6380, Mavmoringolaht. eT e

 

 

FILENO: _ 21 12 <te DATE: 29/oJo7
‘RECEIPT NO: 'ZAAZIO : Signature of TP Officer: 7S Amex as

AUTHORITY NO:

g/ Z2eo7|/ l2sto/)

Page 38

CALCULATION OF FEES

 

APPLICATION |

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION ~

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
“|Inconsistent 3.0

FEE CALCULATION

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

’

 

 

 

TOTAL FEES

 

 

a

 

Page 39

 

Melek Nemo

 

 

’ DATE: , Monday, 2 July 2007 , : FILE: see below

TO: File Note

C.C: Shane Adamson, Wayne Jensen

FROM: Trish Sweeney, Admin Officer - Land Use
SUBJECT: Application fees received 29/6/07

 

The following applications were received at the counter on 29/06/07, late afternoon. They

were not able to be receipted at the time as the application has to be determined as “properly

made” and loaded into Civica prior to a receipt generating. The income is deemed

“unearned income’ and would have been transferred to the new financial year anyway. After

discussion with Wayne Jensen, he confirmed that the fees could be receipted and credited in
_ the new financial year without any consequence.

 

 

 

 

 

 

 

 

 

07/1256. | Duplex - 50 Peregian Esplanade $2950
07/1259 | Visitor Accommodation etc (Essence at Peregian) . $84138.45
07/1262 | Veterinary Hospital - Rene St $11504.76
07/1264 | Commercial Offices & Reconfiguring a Lot - Eenie Creek Rd $58515.35
07/1273 Showrooms & Reconfiguring a Lot — Eenie Creek Rd $126844.35
} 07/1286 | Duplex - 49 Park Rd. - : : $2950
Total $286902.91

 

 

 

Page 40

PROPOSED DUPLEX

50 PEREGIAN ESPLANADE, PEREGIAN BEACH
C

 

  

H & Tee Development Approval Application Submission
PTY LTD ARCHITECTS June 2007

Page 41

 

wev9

RF2

 

  
          

          

     

       

 

         

             

     

     

 

  
          

  
   

       
      

  

     

    

     

 

 

        

 

0

Griveway & = |
crossover to Noosa
Council requirements.|

   

Lige of Bidg over

 

+ 536
Paves sree pore 832% 627
generally RL a7g ' Ps
|
noes NOTE - Rar! Ground ev! contours Existing fence to be retained. 704
7 * ase tee by cadastral survey shown. — — xis! lence to re We tak |
y. X 6.84 i
Brick toe '
| X 655 '
— er ee . ts
Nor .ocaren —| Zi, 2000 setback 7 - ty (fhe |
L 10.24 . |
ago ise! | ; ( I Line rer 7 ig / i |
1} 4] YT Roe 1. i
| ‘@ /
I ;
| | i | --4 Fs 669 ; ae |
high '
I] | a, oe «
j APE POOL OVER ia: i
4 1 ' = [ Fi . a5 | =
| | Roly n = 652 }
| { s 3
‘| {1 by 652 i
| i J I jae QF os !
yt ° 5 '
| a : 3 r ear/ t". x 632 | | a
= s | ” as | i
o> i z 642 597 th | x
& | > x 660 | fasl ips ' e
'
| Hee sibs, over: ! ~J
r I Q
%
t 6o1 wy
. t
|
!
|

     

|

| ¥ 576

PEREGIAN

 

|
Line of driveway &

| crossover from
previous development ;

| shown dashed.

 

"NOTE -
SITE TOBE ;~Bitii}
| BACKFILUED WHERE |
PREVIOUS

DEVELOPMENT WILL |
\ Cause cavity. |

        

 

 

       

 

\ ro
x sist
oe, bene i
* 5
“4
3
594 !
x x i
5.98 5.62
5 !
Line BX Bidg over - 61
~
x ans | North
|
573 |
|

2M 4M 8M

6.88 $59 i

  

6.92
Existing fence to be retained. +

   
        

    

MP 18/05/05 ee

    
        

    

   

 

     

    

  

  

 

 

LL 10.26 Insc)
Kh 9.93 I
— wrt o8r weneroar = x gil Scale 1: 100 at A2 SIZE

MP18/05/04 MP18/05/03 x 633 Al } 8

T 8.57 Insc) + s/s !
NOT LOCATED és nogdytse ante if 3220 ety 18 aces, ll? |
FC Garage MP18/05/02 2 3 x 674
ee Le 878 tac Te | PROPOSED DUPLEX at
easy Sewer sh 571 Lot 340 PEREGIAN
neg pele ESPLANADE for P. COLVIN

Settee ‘Suite 7/8 Grebe Street Ph. 07 5448 3186

Web: www fosterdesigns.com au
Peragian Beach 4573 Email: [email protected]

foster designs

PTY LTD ARCHITECTS
CRW Foster Qid Board Arch. Reg. N° 002793

 

 

(LO O SCALE 1100
\=/ FLOOR PLAN / SITE PLAN — SK-O1

Page 42

 

Existing fence to be retained.

   

  

UNI
ENTERTAINMENT
ROOM

  
  

9pi'sz

   
  

‘95.641

  

“ATP Tye ora F, ag-toooo

Lyfe of Level 2 over

Line of Level 2
Balcony over

    

‘BZLSE

   

BED 3)

[FFT 930)

r=4

    
  

LOW HEIGHT WALLS
passage

      

y 4
Me | North

—— ee |] ES EE Le. ° 2M 4M 8M

Existing fence to be retained I =, — |
ey/—
o

vo sf Scale 1: 100 at A2 SIZE

PROPOSED DUPLEX at
Lot 340 PEREGIAN
ESPLANADE for P. COLVIN

Suite 7/8 Grebe Street Ph. 07 5448 3186

Peregian Beach QLD Fax. 07 5448 1415

PO Box 86 Web: www fosterdesigns.com au
Peregian Beach 4573 Email: [email protected]

  

 

foster designs

— PTY LTD ARCHITECTS
/L 1 SCALE 1:100 CRW Foster Qid Board Arch. Reg. N° 002783

 

 

 

\= 7 FLOOR PLAN 2007-01 SK-O2

DATE: 13-06-07

Page 43

 

 

 

1500_ setback

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|
]
|

Line of Roof over

 

 

 

 

 

 

 

 

 

 

 

 

UNIT 2

LIVING

eshte

 

 

 

 

 

 

 

 

 

 

 

 

EFL u35]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6000 setback

 

2000 setback

 

1o af [

250

 

 

 

Line of Root over
'

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

i
3
° i
Lat 1 {
Teele) ele
tjelale “lejele
via | BALCONY|2[5| 0/0
up, jin Ee —.26)1 | "1" 1] Line of Root over
wielelela ={=|@
3 ‘UNIT 1
H LIVING
3 EFL195
3

 

 

 

 

 

 

 

 

 

rn

 

 

 

 

 

 

 

 

 

poorest

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

. owe
3 \3 3 Tine-oi Rost oval 2200
ln |. ° L.5| ee a I 2000 setback |
ja. | 3. BA - = ~ -_ —. s
alg 3 ~o4
ele ; ~ @p) ~ ~ ~ ~ 1800 setback
S550
i
+
(L2» LEVEL 2 SCALE 1100 :
\x/ FLOOR PLAN ;

 

3007-01

North

oO 2M 4M 8M

Scale 1: 100 at A2 SIZE

PROPOSED DUPLEX at
Lot 340 PEREGIAN
ESPLANADE for P. COLVIN

Suite 778 Grebe Street Ph. 07 5448 3186
Fax, 07 5448 1415,

‘Webs www fosterdesigns.com.au
Peregian Beach 4573 Email: adringlosrdskes. comau

 

   
       

PTY LTO ARCHITEC ARCHITECTS
CRW Foster Qid Board Arch, Reg. N° 002793

“SK-O3

os DATE: 13-06-07

 

 

Page 44

cent Ay Lah Bee

                     

  

1500 setback

|
1

cl

 

2000 setback

 

setback

6000 set
2600 aot

 

 

inet remy

 

Pop-out shelt
low

 

 

 

|
|
|

 

ROOF to
Pop-out shelf

Roo a

eb

 

 

G98 OOOT

 

 

North

| . ° 2m 4M 6M

SS |

Scale 1: 100 at A2 SIZE

than 7.5m

} PROPOSED DUPLEX at
i Lot 340 PEREGIAN

ESPLANADE for P. COLVIN
a Suite 7/8 Grebe Steet Ph. 07 5448 3188
Peregian Beach QLD Fax. 07 5448 1415

PO Box 8 Web: www.losterdesigns.com.ay
Pereglan Beach 4573  Emai: [email protected]

a designs

PTY LTD ARCHITECTS
CRW Foster Qid Board Arch, Reg. N° 002783

ROOF SCALE 1:100 2007-01 SK-04
\c-/ PLAN | Sore ioneor

 

  
       

 

5

Page 45

 

 

Colorbond root
sheating

Bed1
FFL 13.15

>

 

 

Level 2
FFL 14,95_

 

Beds

 

Level 1

  

Garage Level 0
8.1

(E) OVERALL EAST ou 222!
ELEVATION

 

ee ee

FC sheeting

EOFS shooting

nme.

 

i

 

Alum, framed windows

 

     

 

a eee

=

 

 

 

 

 

 

 

 

Beds
L 9.2

 

 

a
i

 

 

 

 

 

_ FFL 11.95

Bed1

Level 2

an | a | > i 7 8 doors
Rendered i . @
. e[Ronderes masonry ' , _ BFP 139.15_

Level 1

 

   

3100

 

 

 

OVERALL WEST one sco
\/ ELEVATION

CE’

Scale 1

100 at A2 SIZE

ne?

AL

PROPOSED DUPLEX at
Lot 340 PEREGIAN
ESPLANADE for P. COLVIN

‘Suite 7/8 Grebe Street Ph, 07 5448 3188

Pereglan Beach QLD = Fax. 07 5448 1415

‘PO Box 88 ‘Web: wow fostardesigns.com.au
Peregian Beach 4573 Email: [email protected]

 

 

   

 

 
 

PTY LTD ARCHITECTS
CRW Foster Qid Board Arch. Reg. N* 002790

SK-O5

DATE: 13-06-07

A

2007-01

 

 

Page 46

FC or Seasoned
Hardwood Boarding
*

  
     

ee : Atum. framed
weeeeot windows & doors

 

   

 

\

| <existing tance
1 to ba retained

Boundary

\

‘
'
t
1
s
1

         
  

 

   

3100

Rendered masonry
Beds
Lg2

  

Natural Grd Level 1

  

 

Existing Grd Line from
previous development
shown dashed

      

 

Finished Gf

 

   

FFL 5.95

  

fence to comply
with Australian standards Stone retaining
to future datail to future dotall

E\ Unit 1 NORTH nese

\x/ ELEVATION ‘
‘

FC of Seasoned
Hardwood Boarding

RL 17.07 . FCO sheeting
= RL 16.55

 
           

Level Bed1
FFL 13.15_

        

hey

 

Alum. framed windows:

Level 2 ah "
: : i a
Wierr. ngss EEE in 8 sore
1

at Grd Line i i i
i G 7
Existing Grd Line from
previous development
Garage Level 0 shown dashed
. FFL 6.1 wo ee - —

 

Bount

———_
- Boundary

          

      

Existing fence Rendered masonry

to be ratained—>y

 

63

Beds
Level 1 FFL

Wo rrrsa6

 

Lot 340 PEREGIAN
ESPLANADE for P. COLVIN

rES Unit 1 SOUTH suri.
\x/ ELEVATION

 

: PROPOSED DUPLEX at
4

   

° 2M am am SCE OS pe
PTY LTO ARCHITECTS

Se CRW Foster Old Board Arch, Reg. N° 002793
Scale 1: 100 at A2 SIZE 2007-01 SK o6

DATE: 13-06-07

 

 

fl Suite 7/8 Grebo Steet Ph. 07 54483188
H Peregian Beach QLD Fax. 07 5448 1415
a H PO Box 88 Web: www Josterdesigns.com.au
Hl Peregian Beach 4873 Emait [email protected]
1

 

Page 47

——— FC or Seasoned
“Hardwood Bosrding

      

Level Bed1
FFL 13.15

 

Level 2
FEL 11.

 

 

5.

 

|
|
|
|
|
|
|
|

Alum. framed
windows & doors

 

 

Exleting fence
te be re

Beds
FFL

  

 

 

Rendered masonry

    

 

Level 1
: ep

  

 

Garage Level 0
- Fe Gt} Existing Ged. Linn. trom - SHS

 

Finlshea Gra Ling

        

 

   

fFLses TOU “avelsEmEM~
° shown dashed
fence to comply
i Stone retaining with Australian standards
. to future detail to future detail
Unit 2 SOUTH
(ES ni SCALE 1:100
\/ ELEVATION
1
'
: ee
x RL 1.0L ---—
 ——— —
cose | MS | ji.

    

Level Bedt

         

    

  

 

  

Alum. framed _ =. FFL 13,15

windows & doors = "S

FC sheeting Lovel 2 i
° FFL 11.95 t

    

   
 

xisting fence
to be retained

Beds
“FFL 9.2

Rendered masonry

   

 

 

 

Nature! Grd Lind, Level 1

 

| fiz-o =n
ad eins eT
l,
|

Existing Grd Line from
previous development
shown dashed

      

FFL 5: 38

 

PROPOSED DUPLEX at
Lot 340 PEREGIAN

ESPLANADE for P. COLVIN
‘Suite 778 Grebe Street Ph, 07 5448 3186
paregian Beach QLD Hrtcapboad
4 a om Perogian Beach 4573. Emal:admingyost'Vesigrs.con ou
[foster designs
é PTY. LTO ARCHITECTS

 

 

90 2M 4M 8M

. | ‘ = CRW Foster Oki Board Arch, Reg. N* 002783,

\/ ELEVATION eronest

 
  

 

Page 48

1 Setback sod

    

    

Level Bed1
FFL 13.15

Level 2
FFL 11.95

BALCONY 3

(aL 119)

   

{at 1135)

   

   
             

Existing fence
to be re

 

   
    

 
    

    

Beds
FFL

BED 3
Catz}

BALCONY 3

 

 

Level 1 Natueat Gra ting

 

 

               
    

 
 

 
 

   
  

Water tank

 

 

 

ae _ Natural Ged cing

carport 8| |eagh (SSS
(Ri $.30)

 

  

 

Garage

 

5.

 

 

Existing Grd Line from
previous development
shown dashed

/B\ SECTION A-A eccvee
\x/ SECTION .
| 5500 _| . b

 

 

pee en i .

 

   

Popout
shett

 

Level Bed!
EFL

Level 2

BALCONY 3
Ca 11.9]

    

 

  

15

 

 

Existing fence
to be +

    

SHR
(Cat 92)

 

     

      

Beds
FFL 9,

 

Level 1 patural Grd Ling

               
    

 

 

soy

 

Water tank

CARPORT | BATT 7 OOo ne

(R696)

 

   

FFL 5.95
Existing Grd Line from
previous development
shown dashed

o 2M 4M 8M

| i
(s» SECTION B-B SCALE +100 Scale 1: 100 at A2 SIZE

 

\/ SECTION

 
      

= >
is
z
8 t
FFL 11.95 2 ee + ee
\
|

PROPOSED DUPLEX at
Lot 340 PEREGIAN
ESPLANADE for P. COLVIN

i ‘Suite 7/8 Grebe Street Ph. 07 5448 3186
A Peragian Beach QLD Fax. 07 5448 1415
a PO Box 86 Web: www fosterdesigns.com.au
_ Peregian Beach 4573 Email: [email protected]

 

    
    

BROS er OK
PTY LTD ARCHITECTS
CRW Fostar Qld Board Arch. Rog, N° 002793

2007-01 SK-O8

DATE: 13-08-07

 

Page 49

  

 

LTC

 

TAT

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

‘ Goundary

  

 

 

   

 

 

 

 

 

 

 

 

 

Bed1 KITCHEN
ey WFO 3.15 as)
S} Level 2
_ Ay ret 95 _
Of
3|
L Ly
evel
_ fPt EL. _
=3 TC v-et ~ ets
\
a
5 :
Garage Level 0
tate W tse RS
CFR gS

rs\ SECTION C-C
\x/ SECTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ies

SCALE 1:100

i
'
‘
i
!

eee.

ms

 

 

 

Nawal GedVing |
|

|

Existing Grd Line from
Previous development
Shown dashed

0 2M aM

Scale 1

 

100 at A2 SIZE

pate a

ean ah pte ml emt

8 cae

PROPOSED DUPLEX at
Lot 340 PEREGIAN
ESPLANADE for P. COLVIN

fic

2007-01

 

Suita 7/8 Grebe Steet Ph. 07 5448 3188

Peregian Beach QLD == Fax, 07 5448 1415

PO Box 88 Webs wwe fosterdesigns com au
Peregian Beach 4573 Emait [email protected]

a OS ai Omir

PTY LTD ARCHITECTS
CRW Foster Qld Board Arch. Reg. N° 002793

SK-O9

DATE: 13-06-07

  

 

Page 50

 

53 7°28 we
y y
Ha /
| |
\
Top fees | Liliiio A TOTAL LANDSCAPED AREA
BALCONY 3 y : 455.78 sq M
et FFL 876] 2o5ne 44 j AREA SUITABLE iors
bec iioarcnclly BALCONY 3 t “yy SCAPE IS IN EXCESg? OF 60%
. fle =| 4 =e
passage ENTERTAINMENT | & a
LAUNDRY FFL 6.65] Ui >
[FFL920) Fete) ie y) a. =
Lspedo—bsat) A Uy 3 ; /
_—_— DETR AREAS 806 a g | /
/
S :
// !
Se !
d
/LANDSCAPE OPEN SPACE “ o
AREA = 369.71 sqM # /
é : a jf
———<. Keledcnmade [ / c J
AREA = 11.81 sqM wh | |
| j |
||
; North
©
whys eet 2M 4M | 8M
a ne eee: ee. i tty { 100 at 3 SIZE
a ll y &
PROPO at
Lot 340 GIAN
E for P. COLVIN
1 : - 445 267 3 7 Reemees Roe,
——_—_—_———— OT le cm eo ee ws es ee. ee. ee. ee eo ee st reach 4573 eral
@ Gg S eo
LANDSCAPE OPEN SPACE 27-08-07>~ aR

o . SS. LOGS

Page 51

 

 

  

 

1500 setback j oh, ; E

  

oS

1500 setback

 

 

 

|

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

PROPOSED Plot Ratio = .439:1
TOTAL U1 + U2 GFA = 353.2 sqM

(Decks over 3m incl.)

 

|
7 2000 setback _ Z _ | | __ 2000 setback} § ° _
8 ECOVER=1446sqM / | [5 .
r------- -4 8 ° / . a
oe Dee <a s / |
{ ig / is ff SITE AREA = 803.7 sqM
|| ee ye 2 = PERMISSABLE SITE COVER 40% =321.48 sqM
_ |e / Bo i PROPOSED SITE COVER
er / : sas U2 SITE COVER =144.6 sqM
\ / “| U1 SITE COVER =143.3sqM
k / , PROPOSED SITE COVER =287.9sqM 36%
1 | ' IDSCAPEPpOoL oveR || -. ff -.
xe it if REQUIRED LANDSCAPED OPEN SPACE
NOTE - R |! i” = 6.6 X 40 = 264 sqM
SITE TO BE / - ia a
BACKFILLED WHERE { “24 PROPOSED LANDSCAPED OPEN SPACE
PREVIOUS = 455.78 sqM
a {DEVELOPMENT WILL AI locos 7
CAUSE CAVITY. rr tl yt «i.
ri tt vii PERMISSABLE Plot Ratio = .45:1
/ | B> TOTAL Permissable GFA = 361.67 sqM
|

 

TINE a Za EA = 52.6 $qM

+ + — ——bt—

 

          

 

 

 

 

 

 

      
 

 

 

 

 

 

 

 

 

 

 

 

U2 GFA = 173.4 sqM,_

“Add Deck AREA =. -1.3 sqM
Add Deck AREA= 1.1-sqM

U2 TOTAL GFA =.175.8 sqM

 

 

 

 

 

 

 

 

 

  

 

 

 

xRL 5.85 -

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PeNTRY : AL 5.85.

 

 

 

 

U1 GFA = 175.0 sqM

Add Deck AREA= 1.3 sqM
Add Deck AREA= 1.1 sqM
U1 TOTAL GFA = 177.4 sqM

 

 

 

 

 

 

| NOTE -

SITE TO BE
BACKFILLED WHERE
PREVIOUS
DEVELOPMENT WILL
CAUSE CAVITY.

c--cr

 

 

 

 

 

 

      

 

POOL OVER

y LL Be 2 caPe/E___ A)

 

t----

 

 

 

&
|
L

North

 

7 WY
‘@e---

—

 

2000 L
1500 setback . Scale 1: 100 at A3 SIZE

 

 

49PQ}95 OOSL

"TT 0002
|
42EqQeS OOSS

 

 

 

 

 

 

2 Cy | PROPOSED DUPLEX at
is Ma * 8 Lot 340 PEREGIAN
ret ESPLANADE for P. COLVIN

‘Suite 7/8 Grebe Street Ph. 07 5448 3186
Po cea QLD for 5448 1415
x: www fosterdesigns.com.au

AREAS - LEVEL O 27-6-07 ARSC

CRW Foster Qid Board Arch. Reg. N° 002783

 

 

 

 

 

Page 52

 

 

AREAS -

7°28'

AREA = 27.5 sqM

AREA=18sqM |

U2 DECK AREA = ads sqM

/

|

|

U1 DECK anes 34.7 sqM
nS

Nn

LEVEL 1

27-08-07. -

North
a |

100 at AS SIZE

/

PROPO at
Lot 340 GIAN
E for P. COLVIN

ij Grebe Street Ph. 07 5448 3186
BeachQLD Fax. 07 5448 1415

86 Web:

Beach 4573 Emait:

 

Page 53

1500 setback

 

I
(i -
i 2000 setback

~|Gne of Roof over

 

SV

RA Qa

Popout

Line of Roof over

 

AREA = 1.1 sqM|
| U2 DECK AREA = 28.0 sqM |

U1 DECK AREA = 34.5 sqM |
Line of Roof over ; |

AREA = 11.0 sqM

Line of Roof over

North

Tine of Root ovel Z Z QZ: AN I 0 a ow

i

Scale 1: 100 at A3 SIZE

 

 

MORQIPS OOSL
T

TT 0002
lol oosd

1500 setback
PROPOSED DUPLEX at
Lot 340 PEREGIAN

 

SPLANADE for P. COLVIN
+35 ——+ Suite 7/8 Grebe Street Ph. 07 5448 3186

Beach QLD Fax. 07 5448 1415

AREAS - LEVEL 2. 27-6-07 PCE

CRW Foster Qid Board Arch. Reg. N* 002793

 

Page 54

 

 

PEREGIAN BEACH

FOR

P. COLVIN

   

  

how been designed and shot be
Sewerega Lom. O'la Stongorg Water
AS 3SG0.. all relevant

       

construction.

SANITARY DRAINAGE

Underground pigewart shall be 100 dia, PVC DW, min grode 1:60 U.N.O,

Suipended Pipewar shal ba OVC cory DWV. .

Toga waste Dipewark to greoee (rap suepanded kholl be “Coesprane’ or

WORE. Undergrouna shall be vitreous clay or HOPE, ,

t pework to ol sencrator shell be HOPE, or Vitreous cloy with
rings.

section evenings brought to eurtoce In paved oF concrete

lings to howe Gren coDe.

STORMWATER DRAINAGE

Ungergravnd pipework shail be 160 die OVC closs SW min grade 1:100 UN.O,
Downpipes nai be 100 Oio PVC class SW. .

Reinecter cutlets (RHO) ono planter ovllets (PO) sholl be “otic Wade’ ar similar,
wih membrana chang where required,

WATER SUPPLY .
Fipeworn shall be conper tube tyoe B. UND. Wolter evoply pioewom shofl be 20 cio
one fating only evoy be 1S aio, max. tengin JOD mm.

    

          

edjocent to Bectrical meters, ar in @ position ae indicated by tne Wchiteet.
BACKFLOW PREVENTION

Provion hove connection vocuum breakers to of hase cocky
Provide RPZD te any irrigation connections,

COVERS & FRAMES .

ject to venicn iran, medi duty UNO.
grained of ce i tet tight duty.
paved oreon

 

GRATINGS
for storm water ta be “fasten, Getic’ or approved equol,
y ta match manufacturers recommendations ter loading condition.
Teeneh grete to be troreverne bar
Floor waste grates to be chrome plciea brosa

 

  

LEGENO
19 — kon poteols water . Biomater
Sv _ Enitung ‘water $08, Gaorowt to murtoce
Zs casting Fever GP" Seabed junetion
—-1V— _Eniating storm soter ov Conret vowe
OE ntating howe Groin cs Ceeners rink
—_Sontery Dratmage ex, Gad Water
STI aes Dov Bovtte check vive
SSNS fet eeu FS ow Femies Banas
a= Storm Hote Drainage.
wiiieeeen Fire fe
1 —— Agi Drain mM
Ba ots wer oe ra
@— Down Pipe oa
OR = cin
Qe wet Pie o
ex Crova vant we
NCB Hovts connection branch
Eouct vent r oor cr
ox inehuect vent « Inspection Chomber
CR He Hot water ier t invets Une
g Shire dropper » inspection opening
CD tre tw fic Kaw'a’Chonnet'™ |" Surort
@ Ke’ note
Non potable caer ne nan return volve
mee e= water en Den
woter meter Py Presture fmiting valve
—— v Vole PO Planter qutlet
0 te Mose Cok 9D, eal Progeny sencsocen
Star ecwntrc ertcrper AED auvegreamury, Lone device
nese om Enlarger Bee ain eter Resa
a0 Senltory Droinage
QE Overtlon ater Guty = IL Surtoce Level
wc OWoter a ‘Sots Troy
‘Crest SwD ‘Storm water éroin
yet Teopeed Tyndiah
fy «sm Tort, gate
to ° facial
Cy J t rene everte hor
Che tse we By SS ee eee,
em Washing TMM, — Thermostetic mizing volve:
Mocking Ww Tempering vote
Fag Poor Weate ufo Underground:
e uty u/a Under shot
Som fm Spe Gale notes otnrvine
= Koos
‘Shower
EX run Fire Howe Real O_o at wotee eat
TD cs Cisanens Sx

 

HY DRAULICESERUIGES

LOT 1 PEREGIAN ESPLANADE

PDE

AVOCET

       

 

 

 

 

Lot 1 on BUP3759

}
i
DRAWINGS

   

 
 

Proposed Site

 

1725-0-1 ie GENERAL NOTES & LEGEND
1725-0-2 — STORMWATER DRAINAGE OPERATIONAL WORKS
4725-0-3 | ~ EROSION & SEDIMENT CONTROL PLAN

Tt. of Management

2. ring devices like leaf eoters

3. of cleaning

4, ‘irst flush storage tank
os to manufactures specification
=minimum quarterly, but monthly in rainy season
-ofter each major roinfoll event

5. To inspect ond cleon tanks minimum once yearly

6. To instail ond maintain pump ond fixtures for

reuse/wotering/irrigation os to manvfactures specification

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

i

Note: }

All kitchen, laundry & bathroom fittings and toilets
to comply with the AAA Water Conservation Rating
System os defined by AS/NZS6400.

Provide flow restrictor valves where necessary

to taps ond shower roses. The flow shall not
exceed a moximum of 9L/min

 

Description oat}
Site 8040?
Roof 332mt
Driveway 94m!
Landscape 4 samt
New impervious. 426m?
CATCHMENT. AREAS.
rT hates ae
Fror Devalopenent Approval] x $-5-07.

 

 

 

 

 

 

 

 

 

 

 

 

 

P. COLVIN

 

“ARETECT +
FOSTER DESIGN PTY LTO
PROC: PROPOSED OUPLEX

LOT + PEREGIAN ESPLANADE
PEREGIAN BEACH

DRAWNO TITLE:

  
   

 

GENERAL NOTES &
LEGEND

 

Brean] RX [ovate] Tine [o—6-07__] Oo Ro
\, sour 11:10 oa vanaf) 3 |1725-0-1| J
[RPO:- Lot 1 on BUP37S9

 

 

 

 

 

 

Page 55

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PERECIAN ESPLA ADE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PO Bow 1176

P, COLVIN

oN

conrct: Reinhold Koenning wittset Rta Ho 7023

 

 

  

PROECT: PROPOSED DUPLEX
PEREGIAN BEACH

FOSTER DESIGN PTY LTO

LOT 4 PEREGIAN ESPLANADE

   
   

 

‘DRAWS TITLE:

STORMWATER
DRAINAGE
OPERATIONAL WORKS

‘

 

deoan] RK [omnes] [este [4-6-07,

 

 

sear: 12108, owas unaf 2 of 3

 

eo 7
1725-0-2 |]

 

 

[RPD:— Lot 1 on BUP3759

 

Page 56

Le
“f

oo

 

 

Provide temporary sediment fence:

 

along boundary refer detall.

 

 

oN
x.
----
—

 

 

 

\\
\

    

ne

\

mp men Set. |e

 

 

Ne Se

 

 

 

 

 

 

 

' t Y
q i
4 al 3 = ‘
\ & i
| \ \ y i
| \ \ =
po ;
1 ‘ wy
| 1 & !
i \ &
1
‘ ' '
sof !
oa! \
oN 1 i
1 ' ;
L | ce Y A ‘ Temporary construction entry/axit {
(Sooo ee if old Zc » YL seciment trap reer deta '
poe 4 18 i? ‘i , J :
\

 

 

 

 

Provide sedimentation basin during construction,
‘The sedimentation basin may be adjusted'in
secordance with the corstruction progress. However SEDIMENT FENCE DETAIL
always ensure a minimum of 1$0mm freeboard to ’ 4

the overflow weir. . j
The overflow discharging from the sedimentation , ‘
basin shafl bo by mesns of gravity. However a pump. .

sump as shown in the detail shat be provided to

‘ensure heavy rainfat! events can be dealt with. \

 

Ensure no scouring occurs. Provide velocity
breakers such as large rocks or straw bales.

‘The sedimentation basin shad catch 100% of the r
‘surface runoff from the site hence provkte barriers. t
and dam watts as temporary measure to direct the

flow through the sedimentation basin,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

seen tao + Bene \

 

 

i
qi

 

 

 

4
i
i}
5 d :
Ay
2
[
i
i
i
i
‘

 

*g835
ise
Fl
aE

 

Provide safe and secure areas for stock piling.
Ensure no unwanted material is washed down the
drainage system. t

Soild wastes produced by construction activities
(0g concrete, lubricating oil etc.), offices (eg
Paper) and lunchrooms (9g aluminium cans) shall
be segregated and recycled. 1

Ingye Notes: Qete

 

 

g
i

 

a
fs
:

Baz
Fes
i

 

i
il

 

 

 

 

 

 

4

j
vs
i

i

 

e
i

 

 

 

 

 

3
SS Ag8 4? SS RE RS

1 Sata i
Se aoe

Medergrouna 4
Unoer'ao
Floor waste grates in pubtc areas to be chrome ctoted bears une Unless noted othersioa

 

emit [email protected] PH; Maas ages
“www conhyd.com EX S444 824

 

Noten sediment canto P. COLVIN

'g Tampere raloage contre Now atods be verted round ‘Une wor, i, here Pom, nd
fb) a , eroRien eegiment controte \nataited eowetionel commencing wp-sicoe FOSTER DESIGN PTY LTD
PROVECT: ~PROPOSED DUPLEX
LOT 1 PEREGIAN ESPLANADE
PEREGIAN BEACH

DRAWING TITLE:

13) Control meceuren may be removed whan on-site arcalon [a controlled end 7OX permonent sok
Coverage is obtained over af upetrecm disturbed land.

2. Sediment Fence Priar to the commencment of any construction activities the following measures.
@ ee woven fabrics : shall be Incorporated:
3, Temp Construction Entry/Est Sediment Trop. “

fo}

  
 

 

 

 

 

« Provide education of site personnel
4. Satety Iesuen wat be considered at of times, incorpate traffic control devices to the eallstaction of the superintendent, «Setup action ptans as # precaution In case of disturbanoas occuring

} EROSION & SEDIMENT
3. At dimensions In milimetres uniens indiccted olnerwiee, sapecially after an unexpected strong rainfall event ALTERNATIVE 2 . CONTROL PLAN
a
SEDIMENT TRAP

oo «Provide regutar Inspection and maintanance of all structures Including the
Dee ee ee ee evo wee temporary structures, Nw

 

 

 

 

 

 

 

 

 

{ Beam] Ri [eneanee Yomte[6-6-07 Ove He
7. Softy inves crust be considered ct ci times, Incorporate tretfic control devices to the ectlataction of the Suserintendent x \ \ was: 1:100 anuna| 3% 3 | 1725-0-3] 3

[RPD:= tet 1 on BUP37S9

 

 

 

 

 

 

Used in these records

About this file

File size
10.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1256 - MCU - Multiple Housing Type 2 - Duplex [As Published].pdf · 10.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.