Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

07/1256 - MCU - Multiple Housing Type 2 - Duplex [As Published] · 132007.1256

of 56

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

«

0

‘TOWN PLANNING REPORT

 

Specific Outcomes

sediments off site;

f) unmanaged public access;
g) effluent disposal;

h) changes to fauna habitat and
behaviour; and

i) disturbance of buildings and
features, including natural features
of cultural heritage

significance.

Probable Solutions
(Code Assessable)

fh

ken hicks

Proposal

ANO assOCIATE

 

Open space network

O17 An integrated open space
network is established, enhanced
and protected throughout

the locality to—

a) provide for both passive and
active recreational pursuits;

b) provide connectivity for
‘pedestrians and cyclists,

c) provide habitat connectivity for
wildlife;

d) protect watercourses and
drainage lines;

@) protect vegetation on steep
slopes; and

f) form a scenic backdrop for
tesidential development.

$17.1 Open space corridors and
existing native vegetation in areas
indicated in Schedule 5 - Map 4
are protected from fragmentation
and encroachment by
development.

Complies

The proposed development does not
adversely impact upon open space
corridors in the area.

 

Pedestrian and bicycle pathways
018 Safe and convenient
pedestrian and bicycle pathways
are provided and retained between
and throughout key destinations
including—

a) an east-west link between the
teach and the northern end of
Lake Weyba via Burgess

Creek:

b) a north-south link between the
Noosa National Park to the north of
the locality and the Shire boundary
near Peregian Beach; and

c) links within and around Sunrise
and Sunshine Beach linking business
and community uses with residential
development.

$18.1 Pedestrian and bicycle
pathways are provided and
retained where indicated in
Schedule 5 - Map 2;

AND
$18.2 Contributions toward a

Pathways Network are provided In
accordance with PSP20.

Complies

Site visits reveal that there is already a
pedestrian and bikeway established
along the frontage of the site, as
indicated in schedule 5 - Map 2. This will
be retained and upgraded as necéssary.

Contributions towards a Pathways
network will be provided in accordance
with PSP20.

 

Beach access points

O19 Access points to the sensitive
fore dune systems are defined and
controlted by the establishment of
key access nodes which are
designed and sited having regard
to the potential adverse impacts
on—

Q) visual amenity;

b) dune stability:

¢) natural habitat; and

d) water quality;

 

No solution provided

 

 

Complies - The site is located in close
proximity to an established and
formalised beach access node.

 

 

 

June 2007

Material Change of Use for Multiple Housing Type 2 Duplex

50 Peregian Esplanade, Peregian Beach

Page 13 of 21

Used in these records

About this file

File size
10.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1256 - MCU - Multiple Housing Type 2 - Duplex [As Published].pdf · 10.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.