Council archive · source document
07/1256 - MCU - Multiple Housing Type 2 - Duplex [As Published] · 132007.1256
Very large file (10.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Le
“f
oo
Provide temporary sediment fence:
along boundary refer detall.
oN
x.
----
—
\\
\
ne
\
mp men Set. |e
Ne Se
' t Y
q i
4 al 3 = ‘
\ & i
| \ \ y i
| \ \ =
po ;
1 ‘ wy
| 1 & !
i \ &
1
‘ ' '
sof !
oa! \
oN 1 i
1 ' ;
L | ce Y A ‘ Temporary construction entry/axit {
(Sooo ee if old Zc » YL seciment trap reer deta '
poe 4 18 i? ‘i , J :
\
Provide sedimentation basin during construction,
‘The sedimentation basin may be adjusted'in
secordance with the corstruction progress. However SEDIMENT FENCE DETAIL
always ensure a minimum of 1$0mm freeboard to ’ 4
the overflow weir. . j
The overflow discharging from the sedimentation , ‘
basin shafl bo by mesns of gravity. However a pump. .
sump as shown in the detail shat be provided to
‘ensure heavy rainfat! events can be dealt with. \
Ensure no scouring occurs. Provide velocity
breakers such as large rocks or straw bales.
‘The sedimentation basin shad catch 100% of the r
‘surface runoff from the site hence provkte barriers. t
and dam watts as temporary measure to direct the
flow through the sedimentation basin,
seen tao + Bene \
i
qi
4
i
i}
5 d :
Ay
2
[
i
i
i
i
‘
*g835
ise
Fl
aE
Provide safe and secure areas for stock piling.
Ensure no unwanted material is washed down the
drainage system. t
Soild wastes produced by construction activities
(0g concrete, lubricating oil etc.), offices (eg
Paper) and lunchrooms (9g aluminium cans) shall
be segregated and recycled. 1
Ingye Notes: Qete
g
i
a
fs
:
Baz
Fes
i
i
il
4
j
vs
i
i
e
i
3
SS Ag8 4? SS RE RS
1 Sata i
Se aoe
Medergrouna 4
Unoer'ao
Floor waste grates in pubtc areas to be chrome ctoted bears une Unless noted othersioa
emit [email protected] PH; Maas ages
“www conhyd.com EX S444 824
Noten sediment canto P. COLVIN
'g Tampere raloage contre Now atods be verted round ‘Une wor, i, here Pom, nd
fb) a , eroRien eegiment controte \nataited eowetionel commencing wp-sicoe FOSTER DESIGN PTY LTD
PROVECT: ~PROPOSED DUPLEX
LOT 1 PEREGIAN ESPLANADE
PEREGIAN BEACH
DRAWING TITLE:
13) Control meceuren may be removed whan on-site arcalon [a controlled end 7OX permonent sok
Coverage is obtained over af upetrecm disturbed land.
2. Sediment Fence Priar to the commencment of any construction activities the following measures.
@ ee woven fabrics : shall be Incorporated:
3, Temp Construction Entry/Est Sediment Trop. “
fo}
« Provide education of site personnel
4. Satety Iesuen wat be considered at of times, incorpate traffic control devices to the eallstaction of the superintendent, «Setup action ptans as # precaution In case of disturbanoas occuring
} EROSION & SEDIMENT
3. At dimensions In milimetres uniens indiccted olnerwiee, sapecially after an unexpected strong rainfall event ALTERNATIVE 2 . CONTROL PLAN
a
SEDIMENT TRAP
oo «Provide regutar Inspection and maintanance of all structures Including the
Dee ee ee ee evo wee temporary structures, Nw
{ Beam] Ri [eneanee Yomte[6-6-07 Ove He
7. Softy inves crust be considered ct ci times, Incorporate tretfic control devices to the ectlataction of the Suserintendent x \ \ was: 1:100 anuna| 3% 3 | 1725-0-3] 3
[RPD:= tet 1 on BUP37S9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1256 - MCU - Multiple Housing Type 2 - Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.