Original source · versioned page text
MCU23/0090.02 - APPLICATION FOR A MINOR CHANGE TO A DEVELOPMENT APPROVAL FOR MATERIAL CHANGE OF USE - HOTEL (EXTENSION TO EXISTING HOTEL) AND DBW23/0073.02 BUILDING WORK (DEMOLITION) AT 118 POINCIANA AVENUE AND 26 DIYAN STREET, TEWANTIN · ATTACHMENT 3 - (MCU23 0090.02 & DBW23 0073.02) - Proposal Plans
Plans and drawings: the text below has words only, no drawings.
Very large file (28.8 MB): may take a few minutes to open.
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
RETAIN EXISTING FACADE RETAIN EXISTING FACADE
FINISH. MAKE GOOD AND FINISH. MAKE GOOD AND
REPAIR ANY DAMAGED PAINT REPAIR ANY DAMAGED PAINT
HOTEL ROOF FINISH FINISH
20.820 m
RETAIN EXISTING FACADE
FINISH. MAKE GOOD ANY
DAMAGED FINISH
10040
FIRST FLOOR NEW METAL BALUSTRADE DETAIL TO COMPLY
FE-01 AC-02 FE-01 AC-02 FE-01 AC-02 FE-01 AC-02
14.880 m WITH BCA.
1000mm HIGH WITH BOTTOM RAILING FROM
RN-01
150MM FROM FLOOR AND CLEAR PLEXIGLASS
RN-01 RN-01 RN-01
PANEL BEHIND HORIZONTAL RAILINGS
NEW LIQOURLAND PYLON
WITH DIRECTIONAL TEXT
NEW FRAMED GLAZED
WINDOWS AND DOORS
GROUND FLOOR MATCHING EXISTING
10.780 m 'LIKE FOR LIKE'
NBG LEVEL
9.600 m
SANDBLAST AND STRIP BACK EXISTING NEW FENCE TO SOUTHERN
PAINT OVER BRICK BANDS BEER GARDEN MATCHING
EXISTING IN PA30 FINISH
2 PROPOSED ELEVATION - POINCIANA STREET.
-- 1 : 100
NEW METAL BALUSTRADE DETAIL TO RETAIN EXISTING FACADE
COMPLY WITH BCA. FINISH. MAKE GOOD AND
1000mm HIGH WITH BOTTOM RAILING REPAIR ANY DAMAGED
FROM 150MM FROM FLOOR AND PAINT FINISH
HOTEL ROOF CLEAR PLEXIGLASS PANEL BEHIND
20.820 m HORIZONTAL RAILINGS
NEW PERGOLA STRUCTURE
IN TIMBER FINISH WITH TM-04 AW-01
TRANSLUCENT LASERLITE ROOF
NEW SHADE SAIL
PLAYGROUND PE-01 PERGOLA 1
STRUCTURE WITH
10040
LIGHTWEIGHT ROOF IN
PE-01 PERGOLA 3
AW-01
STRUCTURE WITH
FIRST FLOOR FE-01 AC-02 FE-01 AC-02 FE-01 AC-02 PERGOLA 3 ROOF LINE PERGOLA 2 ROOF LINE LIGHTWEIGHT
14.880 m ROOF IN AW-01
RL 13.610 PE-01
PE-01 PE-01
RN-01
RL 13.297 PE-01 RL 12.715
AW-01 2500
PE-01 GL-01 GL-01 GL-01
GROUND FLOOR
10.780 m
NBG LEVEL RN-01
9.600 m
1200
BUS SHELTER SANDBLAST AND STRIP BACK EXISTING
PAINT OVER BRICK BANDS
HYDRANT 1200mm H FENCING IN ENTRY GATE ON BICYCLE PARKING
PARKING / BEER GARDEN
9.800 m 1 PROPOSED ELEVATION - DIYAN STREET BOOSTER ON
CONCRETE SLAB
TIMBER TOP RAIL
WITH STAINLESS
SAFETY GLASS
-- 1 : 100 STEEL ROD RAILINGS TM-04
MATERIAL LEGEND
CODE DESCRIPTION IMAGE
SW1C5TEXTURED RENDER TO
DULUX ACRATEX SIENNA NATURAL BE APPLIED TO NEW WALLS
RN-01 TEXTURED RENDER. A CRASHIELD ONLY. ALL EXISTING
TOP COAT RENDERED FACADE WALLS
COLOUR CODE: WHITE POLAR TO RECEIVE NEW PAINT
FINISH ONLY AS SPECIFIED.
PC-01 DULUX DURALLOY SOLID COLOUR RANGE.
PE-01 PERGOLA COLOURBOND ROOF ALL EXISTING ROOF TO BE RETAIN EXISTING FACADE RETAIN EXISTING FACADE COLOUR: NATURAL WHITE
STRUCTURE 3 WITH OVER BAR AREA CLEANED AND MADE GOOD. FINISH. MAKE GOOD AND FINISH. MAKE GOOD AND COLOUR CODE: 272380M
AW-02 REPAIR ANY DAMAGED PAINT REPAIR ANY DAMAGED PAINT
LIGHTWEIGHT ROOF FINISH FINISH
HOTEL ROOF RL 20,820
20.820 m RL 20,752
PA-18
DULUX EXTERNAL WEATHERSHIELD LOW
SHEEN.
COLOUR CODE: TO MATCH RN01 (WHITE
POLAR SW1C5)
DULUX EXTERNAL WEATHERSHIELD LOW
1:2
PA-20
1:2
SHEEN.
1:2
PA-30
RL 17,936
1 :2 PA-30 RL 18,216
COLOUR CODE: CUDDLE POT S09F5
RL 17,936
RL 17,936 RL 17,829
5940
EXISTING ROOF TO BE PLEXIGLASS PANEL
AC-02
RN-01 CLEANED AND MADE GOOD NEW ILLUMINATED GAMING PLANT DECK ENCLOSED WITH COLOUR: CLEAR
RL 16,658 ROOM SIGNAGE, LIKE FOR LIKE NEW LIKE FOR LIKE LOURVE METAL RAILING & BALUSTRADE IN PAINTED
NEW GAMING SIGN IN PA18 PAINT FINISH FINISH
FE-01
C:\Users\dexter.dionisio\Documents\AVC0013 - Royal Mail Hotel_DA_(BEFORE REMOVE PLAYGROUND)_dexter.dionisio.rvt
RN-01 COLOUR CODE : TO MATCH PA-18 (WHITE
RL 15,868 RL 15,680 POLAR SW1C5)
PA-18 RL 15,380 PA-18 PA-18
BEER GARDEN PERGOLA STRUCTURE,
1:3
RN-01
PE-01
FIRST FLOOR ROOF FASCIA, ROOF BEAM AND COLUMN.
14.880 m RL 14,505
DULUX POWDERCOAT:
RL 15,208 COLOUR CODE: TERRAIN GM243A SATIN
1:11
RL 14,413
AW-02
11020
AW-01 PE-01 AW-01 PE-01 AW-01 AW-02
RN-01
RL 13,580 PA-18 RL 13,932 BEER GARDEN ROOF:
AW-01
1:4 RL 13.590
AW-02 SUNTUF BEEHIVE HIGH IMPACT ROOFING
1:4
6080
RL 13,305 RL 13.297
LOT 3 TO TOP OF THE WALL
COLOUR: SOLAR ICE
LOT 3 TO TOP OF THE ROOF
RN-01
LOT 3 TO TOP OF THE ROOF
RL 12.714
4100
BEER GARDEN ROOF:
G-01 AW-02
RN-01 COLORBOND ROOFING TRIMDEK SHEET:
3830
G-01 G-01 G-01 D FINISH: COLOURBOND SURFMIST
4100
RN-01 EX.13
3740
GROUND FLOOR
4020
FE-01
3435
10.780 m
NORTH BEER GARDEN FENCING:
TM-04
980
SPOTTED GUM TIMBER FINISH TO TOP RAIL
RN-01
RL 9.600 WITH STAINLESS STEEL ROD RAILING
PARKING / BEER GARDEN
9.800 m PA-18 PA-18 CLEAN AND MAKE GOOD NEW 2400MM H PERGOLA STRUCTURE. NEW 1800MM H NEW 2400MM H PERGOLA STRUCTURE.
EXISTING FACADE. APPLY NEW POSTS IN PC-01 POWDERCOATED FE-01 FENCING POSTS IN PC-01 POWDERCOATED
NEW RENDER FINISH TO EXISTING TOUGHENED CLEAR GLASS G-01 PROPOSED NEW SEMI SOLID CORE NEW SHADE SAIL PLAYGROUND BEER GARDEN WINDOW:
PA-18 PAINT FINISH ALUMINIUM WITH AW-02 ROOF SHEETING ALUMINIUM WITH AW-02 ROOF SHEETING G-01
FACADE IN WARM WHITE TONE TO ALL GLAZING PANELS BY DOOR TO ACHIEVE. MINIMUM OF TOUGHENED CLEAR GLASS GLAZING BY
NBG LEVEL CONTRACTOR. 12.5KG/M3 SURFACE MASS DENSITY. CONTRACTOR
9.600 m PROVIDE PERIMETER SEALS AS PER
3 PROPOSED ELEVATION . WINDOW FRAME COLOR TO
MATCH PE-01.
ACOUSTIC REPORT. TYPE D DOOR
HANDE WITH FREE LEVER ACCESS OUT
-- 1 : 100 AND RIGID ON CARPARK SIDE
PLANNING APPROVAL
NOT FOR CONSTRUCTION
0 0.5 2.0 4.0 5.0
SCALE IN METRES
Rev Description By Date Project Name Project No. Drawn
11 Revision 38 DD 11.10.2024
AVC0013 KI
12 REVISED TOWN PLANNING ISSUE DD 03.02.2025
ROYAL MAIL HOTEL
Date Checked
13 REVISED TOWN PLANNING ISSUE - CARPARKING DD 04.02.2025 Site Address OCT 2024 DD
14 REVISED TOWN PLANNING- CARPARKING DD 13.02.2025
22/08/2025 4:51:08 PM
120 POINCIANA AVE, TEWANTIN QLD 4565, AUSTRALIA Scale Certified
15 REVISED TOWN PLANNING- CARPARKING DD 17.02.2025 As indicated @ A1 R. OVCARIC
16 REVISED TOWN PLANNING - PROPOSED CONDITIONS DD 20.03.2025 Drawing Title Drawing No. Revision
ISSUED TO AVC
17 REVISED DA - PLANNING CONDITIONS DD 05.05.2025
18
19
REVISED DA - PLANNING CONDITIONS
REVISED DA - PLANNING CONDITIONS
DD
DD
29.05.2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.