Skip to the record
The gold standard in government transparency.

Council archive · source document

Checklist 1—Various aspects of development · OPW16/0229

Attached to the e-mail Operational Works Application - OPW16/0229.

of 4

Text shows just the words. Original shows the document exactly as it was published.

Schedule 3 Assessable Development
Checklist 1—Various aspects of development
(Sustainable Planning Act 2009 version 3.1 effective 20 December 2013)

This checklist applies to the carrying out of various aspects of development, as specified in the Sustainable Planning
Regulation 2009, Schedule 3, Part 1, Table 5.

You may complete this checklist as part of your development application. The checklist will:
     help you identify whether you need to make a development application for the proposed development
     help you identify the relevant Integrated Development Assessment System (IDAS) form you need to complete as
      part of your application
     assist in identifying the assessment manager or referral agency for development that is assessable development
      under schedule 3 of the Sustainable Planning Regulation 2009.

If your development involves a material change of use, reconfiguring a lot, operational work or building work, it is
recommended you complete the relevant checklists: Checklist 2—Material change of use, Checklist 3—Reconfiguring a
lot, Checklist 4—Operational work, or Checklist 5—Building work.

If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of State Development, Infrastructure and Planning’s (DSDIP) website at www.dsdip.qld.gov.au.

All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

Part 1—General questions

1.1    Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
       notice is required under the Water Act 2000, other than within a priority development area or on a
       premises to which structure plan arrangements apply?

      No            Continue to question 1.2
      Yes           Complete part 2 of this checklist

1.2    Is any part of the proposed development intended to be carried out on a Queensland heritage place
       under the Queensland Heritage Act 1992?

      No            Continue to question 1.3
      Yes           Complete part 3 of this checklist

1.3    Does the proposal involve development on a local heritage place?

      No            Continue to question 1.4
      Yes           Complete part 4 of this checklist

1.4    Is any part of the development on strategic port land or airport land (other than development for a
       material change of use that is inconsistent with the land use plan for the strategic port land or airport
       land mentioned in the Sustainable Planning Regulation 2009, Schedule 3, Part 1, Table 2, item 3 or 4)?

      No            End of checklist – A development permit is not required for this aspect of development under
                     Sustainable Planning Regulation 2009, Schedule 3, Part 1, Table 5
Full text of the other 3 pages

Page 2

      Yes        Complete part 5 of this checklist

Part 2—Removing quarry material

2.1    Is any part of the quarry material which is intended to be removed, located within a wild river area under
       the Wild Rivers Act 2005?

      No         A development permit is required and this application requires assessment by the chief executive of
                  DSDIP as assessment manager or concurrence agency against the Sustainable Management of
                  Water Resources State Code in the State Development Assessment Provisions (SDAP).
                 Your application must include IDAS form 18—Removal of quarry material from a watercourse or lake.
      Yes        Continue to question 2.2

2.2    Will the development be carried out on land to which a property development plan under the Wild Rivers
       Act 2005 applies?

      No      A development permit is required and this application requires assessment by the chief executive of
              DSDIP as assessment manager or concurrence agency against the Sustainable Management of Water
              Resources State Code in the SDAP.
              Your application must include IDAS form 18—Removal of quarry material from a watercourse or lake.
      Yes     Continue to question 2.3

2.3    Is the development consistent with the property development plan?

      Yes     A development permit is required and this application requires assessment by the chief executive of
              DSDIP as assessment manager or concurrence agency against the Sustainable Management of Water
              Resources State Code in the SDAP.
              Your application must include IDAS form 18—Removal of quarry material from a watercourse or lake.
      No      This aspect of development is prohibited development. A development application for this development
              cannot be made.

Section reference:
     Sustainable Planning Regulation 2009, schedule 3, part 1, table 5, item 1
     Sustainable Planning Regulation 2009, schedule 7, table 2, item 12
     Sustainable Planning Act 2009, schedule 1, item 2

Part 3—Queensland heritage place

3.1    Do any of the following apply to the proposal?

The proposed development is only ongoing maintenance or minor work permitted by a general            Yes          No
exemption certificate issued under section 75 of the Queensland Heritage Act 1992.
An exemption certificate has been issued under the Queensland Heritage Act 1992.                     Yes          No
The proposed development is liturgical development under section 78 of the Queensland                Yes          No
Heritage Act 1992.
The work is being carried out by the state.                                                          Yes          No
The work is being carried out in a priority development area.                                        Yes          No
The development is mentioned in schedule 4 of the Sustainable Planning Regulation 2009.              Yes          No




                                                                            Checklist 1—Various aspects of development
                                                                                        Version 3.1—20 December 2013

Page 3

     If you answered no to all of the above, a development permit is required and this application requires assessment
      by the chief executive of DSDIP as assessment manager or concurrence agency against the Queensland Heritage
      Place State Code in the SDAP.
     Your application must include IDAS form 3—Queensland heritage place.
     If you answered yes to any of the above, a development permit is not required. End of part 3 of this checklist.

Section reference:
     Sustainable Planning Regulation 2009, schedule 3, part 1, table 5, item 2
     Sustainable Planning Regulation 2009, schedule 7, table 2, item 19

Part 4—Local heritage place

4.1    Do any of the following apply to the proposal?

The development is building works to be carried out by or on behalf of the state, a public             Yes          No
sector entity or a local government
The development is for public housing                                                                  Yes          No
The development is to be carried out by the state on land designated for community                     Yes          No
infrastructure under the Sustainable Planning Act 2009.
The development is mentioned in schedule 4 of the Sustainable Planning Regulation 2009.                Yes          No
The local heritage place is on an airport lessee’s airport land under the Airport Assets               Yes          No
(Restructuring and Disposal) Act 2008.

     If you answered no to all of the above, a development permit is required and your application to the local
      government, as assessment manager, must include IDAS form 4—Local heritage place.
     If you answered yes to any of the above, a development permit is not required.

Section reference:
     Sustainable Planning Regulation 2009, schedule 3, part 1, table 5, item 3
     Sustainable Planning Regulation 2009, schedule 3, part 2, table 1, item 1
     Airports Assets (Restructuring and Disposal) Act 2008, section 54

Part 5—Strategic port land or airport land

5.1    Does the land use plan for the strategic port land or airport land state that the development is
       assessable development?

      No          A development permit is not required for this aspect of development; end of this checklist.
      Yes         A development permit is required and your application may include, where applicable:
                       for a material change of use—IDAS form 5—Material change of use assessable against a
                        planning scheme
                       for building or operational work—IDAS form 6—Building or operational work assessable against
                        a planning scheme
                       for reconfiguring a lot—IDAS form 7—Reconfiguring a lot
                  The assessment manager will either be the local government or the port authority or DSDIP.

Section reference:
     Sustainable Planning Regulation 2009, schedule 3, part 1, table 5, items 6 and 7


                                                                             Checklist 1—Various aspects of development
                                                                                         Version 3.1—20 December 2013

Page 4

    Privacy—Please refer to your assessment manager for further details on the use of information recorded in
    this checklist.

    Disclaimer:
    While DSDIP believes that the information contained on this checklist and provided as part of this process will be of
    assistance to you, it is provided on the basis that you will not rely on the information. It is your responsibility to make
    your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

    To the full extent permitted by law, DSDIP expressly disclaims all liability (including but not limited to liability for
    negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
    consequence which may arise from your reliance on this process and the information contained on this checklist.




    OFFICE USE ONLY

    Date received                                              Reference numbers



    The Sustainable Planning Act 2009 is administered by DSDIP. This checklist and all other required application
    materials should be sent to your assessment manager and any referral agency.




Department of State Development, Infrastructure and Planning
PO Box 15009 City East Qld 4002
tel 13 QGOV (13 74 68)
[email protected]                                                               Checklist 1—Various aspects of development
                                                                                                Version 3.1—20 December 2013
www.dsdip.qld.gov.au

Used in these records

About this file

File size
58 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

sara-idas-checklist-1-various-aspects-of-development.pdf · 58 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.