Original source · versioned page text
210312 Proposed Drainage Works (202793)
LEGEND IT IS THE RESPONSIBILITY OF THE CONTRACTOR
TO CONTACT THE RELEVANT AUTHORITIES TO
PROPOSED STORMWATER CONFIRM THE LOCATION OF ALL EXISTING SERVICES
PRIOR TO THE COMMENCEMENT OF EXCAVATION
PROPOSED KWIK KERB "BORDER TO EDGE"
EXISTING WATER MAIN
EXISTING SEWER MAIN
EXISTING STORMWATER
EXISTING SURFACE CONTOURS (0.2 INCREMENT)
14
12
13 12
10
14 11
9
8
15 10
15
9
12 10
13
15 REFER PLAN C100 FOR ADDITIONAL DETAILS (INSERT A)
15
11
14
EXISTING CAR PARK DRAINAGE HEADLAND DRIVE 8 8
15 DIRECTED TO HEADLAND DRIVE
15
15 EXISTING
15
9
DRAINAGE SYSTEM
10
13
12
7
15
14
15
11
7
15
LOT 79
7
8
RP71151
7
15
9
16
10
12
INSPECT AND
14
AD
REPAIR DOWN PIPE
13
EXISTING DRAINAGE PIT IN
RO
FIX DOWN PIPE TO WALL TO ADJOINING LOT (UN MAPPED)
A
DIRECT FLOW INTO
S
15
OO
UNDERGROUND DRAINAGE
11
IN
16
9
8
ND
MU
16
EU
16 16
13
12
10
14
9
15
15 8
16 14
12
11
13
10
17 12
17
14
8
9
17
10
14
16
15
8
11
17
12
OVERALL SITE LAYOUT
SCALE 1:500 (A3)
SCALE 1:500 (A3)
SR
Consulting Civil & BUSY BEES CHILD CARE CENTRE 202793 C001
SR KG Structural Engineers SITE PLAN 87 EUMUNDI NOOSA ROAD, NOOSAVILLE C001 SITE PLAN B
AS SHOWN FEB 2021 Project Management B & L FAWCETT HOLDINGS PTY LTD
ASSOCIATES PTY LTD
APPROVAL & Planning
c:\12dS\data\12dserver\202793_1434\dwg covey\OPW\uncontrolled\C001 SITE PLAN.dwg
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.