Delegated Report - Code - Planning OPW23 0189 [As Published] · OPW23/0189

of 10

Text shows just the words. Original shows the document exactly as it was published.

               13.    All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               14.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice;
                      b.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines; and
                      c.      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                      Works within Road Reserve/Reinstatement
               15.    Safe vehicle and pedestrian access on all streets in the vicinity of the development must be
                      maintained at all times. Should footpath/road closures be necessary to carry out construction
                      works, Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               16.    All frontage works must match neatly with existing road and verge/footpath features.
                      Additional works beyond the frontage may be required to provide an acceptable transition to
                      existing road and verge/footpath profiles.
               17.    Electrical conduits or other services proposed to be installed within existing and proposed
                      road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
                      driveways or significant vegetation must be installed by boring. Trenching is not permitted,
                      unless specifically approved by Council.
                      Earthworks and Retaining Walls
               18.    All earthworks and associated retaining structures/batters, both above and below ground
                      level, both temporary and permanent, must be contained entirely within the subject site
                      unless written permission from the respective landowner(s) is provided to Council.
               19.    All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
                      on Earthworks for Commercial and Residential Development, with geotechnical testing
                      undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 2’ as
                      defined in Appendix B. Test results as required by AS 3798.
               20.    All excavation and dewatering works must be undertaken in accordance with the
                      recommendations provided by ADG Consulting’s Dewatering Management Plan
                      (ADG1580.23, Rev. 0) dated 28 September 2023 and in a manner that will not cause
                      environmental harm or damage to surrounding infrastructure or property as a result of the
                      developments interaction with actual or potential Acid Sulphate Soils or groundwater.
               21.    All excavated material must be treated for Acid Sulfate Soils generally in accordance with
                      the recommendations provided by Pacific Geotechnical’s Acid Sulfate Soil Investigation
                      Report (PG-10899, Ver. 3) dated 28 November 2023.
                      Treated material must undergo verification testing at the rate of one sample per 250m3
                      throughout the duration of the excavation phase of the development. The verification testing
                      must be undertaken by a qualified person in accordance with the Queensland Acid Sulfate
                      Soil Technical Manual: Soil Management Guidelines v4.0, and the results must be submitted
                      to Council for appraisal when requested during construction and prior to commencement of
                      use and must demonstrate that the material has been adequately neutralised.
                      Certification of the verification results for compliance with this condition must be provided by
                      a suitably qualified Geotechnical Engineer prior to the issuing of the certificate of
                      classification for the dwelling.


                                                                                                        Page 6 of 10

Document Set ID: 22822217
Version: 3, Version Date: 23/02/2024

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW23 0189 [As Published].pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.