Demolition Notes:
1.) Dashed lines on demo plans represent items to be removed. Patch,
A B C D
REMOVE EXISTING FENCE ALONG BOUNDARY
N
repair and make good existing and adjoining areas, surfaces and finishes as
required to match and align with proposed finishes.
2.) The contractor shall not consider demolition and alteration notes to be
all inclusive. It is the contractor's responsibility to inspect and assess each
area and to fulfil the intent of the design indicated by the contract
EXISTING TIMBER
SLEEPER RETAINING Reuse
WALL TO REMAIN EXISTING DECK TO REMAIN
documents. The Contractor shall coordinate architectural demolition
drawings and notes in conjunction with structural, HVAC, electrical, fire
1 1
Recycle
protection and plumbing drawings and notes etc. Patch or rebuild any
elements remaining that have been damaged or disturbed by Structural, EXISTING PERGOLA ROOF
HVAC electrical, fire protection and & POSTS TO REMAIN
plumbing demolition. REMOVE EXSITING HYDRAULIC CONSULTANT TO CONFIRM
PAVING IF EXISTING IO CAN BE MOVED OR
EXISTING DECK TO REMAIN
3.) For all surfaces scheduled to remain, patch and match surfaces WILL NEED TO BE CAPPED.
disturbed by demolition or removal of equipment or utilities. Install Waste
patching to match adjacent work in finish, structural qualities, coursing of
EXISTING BLOCK WALL TO BE CORE FILLED
masonry, and other characteristics. Patch surfaces to comply with fire 2 2
ratings, smoke-tight ratings, acoustical criteria and other performance
criteria indicated.
IO
UNIT 3
EXISTING SLAB TO REMAIN
14.53
4.) All demolition shall be performed in a safe and acceptable manner to all FFL 14.64m
OWNER TO EXISTING DECK & ROOF
authorities having jurisdiction and the owner. A fire watch shall be provided DISMANTLE EXISTING RL14.55m
if any hazardous situations are thought to be possible. Comply with TO BE DEMOLISHED
TIMBER RETAINING
EXISTING BLOCK WALL TO BE CORE FILLED
Governing regulations pertaining to environmental protection for pollution WALL FOR REUSE
control. Thoroughly clean adjacent areas of dust, dirt and debris caused by
NEW RET. LINE
demolition work. Before new work begins, return adjacent areas to 3 3
condition found prior to start of demolition work.
5.) The contractor shall verify all conditions and dimensions within the UNIT 2
EXISTING BLOCK WALL TO BE DEMOLISHED
Contract documents and confirm site set out and building dimensions. The EXISTING SLAB TO REMAIN EXISTING DECK & ROOF
contractor shall notify the architect immediately in writing of any deviation FFL 14.04m TO BE DEMOLISHED
AVOCET PARADE
from contract documents necessitated by field conditions or items not
covered. 4 4
RL14.55m
6.) Maintain access to exits and exit stairs at all times. Fire alarm and smoke IO
detection system and emergency lighting and exit signs shall remain EXISTING SOIL
operational at all times. Protect smoke detectors as required and in TO BE REMOVED
DEMO EXIST.
14.53
UNIT 1
conformance with codes and local authorities having jurisdiction. REMOVE EXISTING SLAB TO REMAIN
LAUNDRY FFL 13.45m
EXISTING
7.) Hazardous material note: The contractor shall stop work and inform PAVING
both the architect and principal immediately in writing of any hazardous 5 5
material encountered or thought to be hazardous material. The architect REMOVE EXISTING PAVING
2100
after receiving written notice shall instruct contractor on how to proceed.
EXISTING CHAINLINK HYDRAULIC CONSULTANT TO
FENCE TO REMAIN CONFIRM IF EXISTING IO CAN DEMOLISH EXISTING UNIT 1
8.) Prior to any demolition, the contractor shall coordinate and review
existing bracing systems so as to maintain the structural integrity of the BE MOVED OR WILL NEED TO GRIND DOWN NOTE: ITEMS WITHIN UNIT TO BE
2375
BE CAPPED. EXISTING SLAB SALVAGED AND RE-USED. T.B.C
remaining elements of the building and its systems as required during the
BY 50MM
construction period. The contractor shall be responsible for the support of
adjacent structures during demolition and new construction work. The
contractor shall provide all temporary shoring, scaffolding, etc., which are 6 6
necessary to prevent collapse, subsidence, deflection or any other type of REMOVE EXISTING PAVING
damage. Repair all fire proofing systems and mechanisms damaged during REMOVE EXISTING
demolition work to ensure its integrity and associated fire rating is BLOCK FENCE
maintained
EXISITNG POWERLINE
REMOVE EXIST. RET WALL TO PROPERTY TO BE
9.) Provide temporary partitions/dust protection (rated and/or non-rated) ADJUSTED TO SUIT
as required. Review locations of temporary partitions/dust protection with
EXISTING STONE WALL TO
architect and principal prior to the commencement of work.
BE REMOVED AND REMOVE EXISTING PAVING
STOCKPILED BY OWNER
10.) All work shall be carried out in protected space. No dust or dirt shall
travel from construction area to adjacent areas. Temporary dust protection
shall be erected prior to start of work. Contractors shall review provisions
OWNER TO DISMANTLE AND
to control airborne dust with Facilities-building manager and construction EXISTING BITUMEN TO BE REMOVED
REMOVE / STOCKPILE EXISTING
manager. Coordinate additional filtration of exterior air intakes to CARPORT
mechanical systems.
11.) Cap off and terminate all services as required. Coordinate termination
of existing services in conjunction with all new services drawings to ensure
integrity of remaining existing services is not disrupted or compromised
during the construction period.
A B C D
12.) Any floor openings shall be covered during demolition and
construction.
Plan
SITE PLAN - EXISTING & 1 : 100
DEMOLISHED
Project Address Client Name Drawing Title
TENDER / B.A
Project Number Sheet Number
38 Avocet Pde Peregian JACQUI FYFFE
SITE PLAN - EXISTING & DEMO
Beach
ZEST DESIGN STUDIO
P | 0457 314 346
A | 1A/12 Action St, Noosaville, QLD 4566
Designer (s)
ICB
1
L
TENDER / BA ISSUE
HYDRO ENG SET
17/08/2020
15/07/2020
19009 A.102
E | [email protected] J BIN ENCLOSURE 20/04/2020
W | www.zestbuildingdesign.com.au
G Information Request 19/12/19
0 1m 2m 3m 4m 5m Phase Issue
Drawn by F DA Issue 03-09-2019
SCALE @A2
ABN: 37 601 151 508
Q.B.C.C Lic. No: 1307012 ICB Issue Description Date 1:100 T 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Demolition Site Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 812 KB (small file)
- File type
No other editions are linked here.