Response with Conditions - 2409-42553 SRA
Attached to the e-mail MCU24/0117 & OPW24/0139 - SARA Referral Agency Response.
2409-42553 SRA
Attachment 1—Referral Agency Conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. Conditions Condition Timing
Material Change of Use for Multiple Dwellings (4 Units)
10.9.4.2.4.1—Material change of use within 25 metres of a state-controlled road—The chief executive
administering the Planning Act 2016 nominates the Director-General of the Department of Transport
and Main Roads to be the enforcement authority for the development to which this development
approval relates for the administration and enforcement of any matter relating to the following
condition(s):
1. (a) Road access is located generally in accordance with the plan (a) At all times
titled General Arrangement 1 of 2 prepared by DME Projects,
26.11.24, job number 240604, drawing number 03 and revision C (b) and (c)
(as amended in red by SARA on 23 January 2025). Prior to the
commencement of use
(b) Provide road access works, comprising a 6 metre wide Vehicle
Crossing – Heavy Duty that continues for a minimum of 6 metres
inside the property boundary, at the road access location.
(c) Design and construct the road access works, referred to in part
(b) of this condition, in accordance with:
(i) Institute of Public Works Engineering Australasia (IPWEA)
Standard Drawing RSD-102, dated 07/23 and revision A
(ii) the Department of Transport and Main Roads’ Road
Planning and Design Manual
(iii) the Department of Transport and Main Roads’ Policies and
Technical Specifications
(iv) the Department of Transport and Main Roads’ Standard
Drawings Roads.
2. (a) Stormwater management of the development must not cause (a) At all times
worsening to the operating performance of the state-controlled
road, such that any works on the land must not: (b) Prior to the
commencement of
(i) create any new discharge points for stormwater runoff onto
operational work
the state-controlled road
(ii) concentrate or increase the velocity of flows to state- (c) Within 20 business
controlled road days of the completion
(iii) interfere with and/or cause damage to the existing of works
stormwater drainage on the state-controlled road
(iv) surcharge any existing culvert or drain on the state-controlled
road
(v) reduce the quality of stormwater discharge onto the state-
controlled road
(vi) impede or interfere with any overland flow or hydraulic
conveyance from the state-controlled road
State Assessment and Referral Agency Page 4 of 9