53. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (e.g. by blocking or interfering with natural overland
flows).
54. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Environment
55. Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994)
must not be released from the site or to waters within the site, or be likely to be released
should rainfall occur, unless all reasonable and practicable measures are taken to
prevent or minimise the release and concentration of contamination.
56. Erosion and sediment control measures must be installed and maintained to minimise
erosion on the site and to minimise the export of sediment and associated pollutants
from the site. The erosion and sediment control measures must be designed, installed
and maintained in accordance with current best practice standards (refer to advisory
notes).
57. Prior to the commencement of the use, all site surfaces must be effectively stabilised
using methods which have achieved effective short-term stabilisation and which will
continue to achieve effective stabilisation in the medium to long-term (refer to advisory
notes). For the purpose of this condition, an effectively stabilised surface is defined as
one that does not, or is not likely to result in visible evidence of soil loss caused by
sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination.
Damage to Services and Assets
58. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION
Certification
59. Upon completion of the work a certificate must be issued by an RPEQ certifying that
the works have been constructed in accordance with the Operational Works permit.
60. A final inspection and approval of the new works and completed reinstatement works
by Council’s Inspector is required. Please contact Council on 5329 6245 to arrange for
the inspection.
Carried.
Page 8 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.