Original source · versioned page text
Approved Plans 220224 Middle Creek Rd
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn503 Middle Creek rd, Federal Re abilitation Plan ec 2021 NOOSA COUNCIL APPROVED PLAN OPW21/0357 2 MARCH 2022 The following landscape operational works plan package consists of the following schedule of drawings; LD1 eneral Notes LD2 eneral Notes LD3 Finis es Sc edule aintenance Notes Typical etail LD4 Plant Sc edules | | | | | | | | | | | LP1-2 andscape Plans | | | | | | | This package has been developed to comply with; C 20 014 LP2 LP1 Noosa Plan 2020 | | Invasive Plants isted in t e Biosecurity Act 2014 3°04'30" 14.082 Noosa Biosecurity Plan 2020 Sources; CA con Surveying To n Planning Sample Approvals; · Furnis A it follo ing samples for A approval prior to construction; Composted Forest itter " 2'05 53°3 63 132. 146.56 290°04 '30" 503 Middle Creed Rd, Federal QLD 4568 SHEET KEY LAYOUT N.T.S SITE LOCATION N.T.S Lot 8 on RP835350 Client Project NORTH TITLE: JOB No.: S21081100 anembo consultants FILE: 220224 DONOVAN BISS D 24.02.22 COUNCIL RFI CK TH 503 Middle Creek Rd, Federal C 06.12.21 COUNCIL UPDATES CK TH DWG. No. LD1 Landscape Architects Environmental Project Management This document is the copyright of anembo consultants & shall LANDSCAPE REHABILITATION PLAN B 17.09.21 COUNCIL SUBMISSION CK TH SHEET 1 OF 6 anembo consultants pty.ltd. Sunshine Coast: PO Box 24 A.B.N. 75 089 473 156 Moffat Beach QLD 4551 not be copied without written approval, nor shall it be used except for the development and the site specified. Scale A 23.08.21 FOR REVIEW CK TH - Ph: 07 5437 0000 can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 GENERAL NOTES -
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 5 pages
Page 2
inspected maintained as follo s;
PROJECT SPECIFICATIONS A uring construction: aily during dry eat er Cultivate VEGETATION MANAGEMENT PROTECTION PROGRAM
This plan has been developed to comply with the Noosa Shire Council Prior to predicted storm events · Cultivate ground in all disturbed areas to a dept ere possible to 5mm dept for
Planning Scheme as applicable where practical T ice daily during prolonged rain inspection before installation of soil reveg Issue Vegetation management - clearing & protection
ABBREVIATIONS · Avoiding any root systems
AS Australian Standard ot dipped B uring establis ment period: eekly during dry eat er Objective Identify areas of vegetation individual trees to be
EP Establis ment Period A andscape Arc itect Prior to predicted storm events Mulch protected retained it in t e development areas t ose
N A Not applicable OC On centre T ice eekly during prolonged rain · Organic and inorganic mulc es are required to be installed over all garden areas to be cleared
P aintenace Period m2 Square metres · All stockpiles are to be protected it suitable erosion control devices graded to ere s o n on t e dra ings Ensure t at orkers understand t e requirements of
m3 Cubic etres T P Typical ensure control of runoff · All mulc es supplied must be clean free from live eeds eed seeds specifically protection retention install protective devices to
NATA National Association of Testing Aut orities S PER Superintendent · Coordinate installation of sediment erosion control devices it civil contractor to nutsedge pests soil borne viruses and diseases Furt er S PER it certifications ensure no accidental damage occurs
ensure compatibility consistency in control measures respectively for approval prior to installations Ensure t at clearing met ods are appropriate for areas
uPVC nplasticised polyvinyl C loride Pipe NSC Noosa S ire Council
· All e posed surfaces once completed s all be immediately stabili ed to prevent being cleared especially in t e vicinity of areas to be
B ater by esign AO andscape Assessment Officer ulc types include:
protected
erosion · Forest Blend ulc 100mm dept to all revegetation areas
Ensure t at t e ork program is suc as to minimise t e
PROJECT PLANNING CONDITIONS - DEMONSTRATION OF COMPLIANCE · Coir es and Sugar Cane To all bio basin media time bet een en clearing occurs t e cleared ground
· Apart from declared eeds all e isting vegetation s all be retained as been SITEWORKS & DRAINAGE Furt er information located in Finis es Sc edule and dra ings is stabilised to reduce t e c ances of silt movement
identified it retention protection measures for suc are nominated erein · Remove all un anted material deleterious operational debris from site T ese · Supply install to s ale areas a layer of 50 100mm gravel spalls to 150mm dept Ensure t at cleared material is mulc ed or ood c ipped
· Identified areas are confined to areas of eed management t ose nominated on materials include but are not limited to: Star pickets abandoned fencing concrete as appropriate or disposed of in an approved manner
t ese plans it associated orks described erein pipes posts etc Recycle t ese materials en practical ot er ise dispose of REHABILITATION AREAS
· Plant sc edules are as per; properly off site TUBESTOCK PLANTING, SETOUT & TREE GUARD Tasks Ensure vegetation to be retained is correctly identified
· ere bad ground occurs or levels provided are not functional refer to S PER · Bamboo stake setout of trees and s rubs for approval by S PER clearly marked protective devices are installed
RE 12 3 1a · Ensure site drainage can occur to ole of site ere pat s edges gardens · Setout to be staggered and random to account for terrain variation and replicate maintained in functional condition
RE 12 3 2 etc may impede drainage refer to super before continuing orks natural c aracter Vegetation to be retained protected s all be as
RE 12 3 11 · Ensure drainage orks correlate it adjacent land · Install tubes per re abilitation sc edules densities specifications details nominated per plan field adjusted on site by la
All required species substitutions are to be confirmed in riting · Civil design as provided a positively drained site o ever ere drainage issues · Install tree guard in nominated location as per detail Protection fence s all be used to protect vegetation
from council s parks branc prior to t e commence of any landscape ork are identified refer S PER · aintain as per sc edule nominated for retention Fence to be as per detail
andscape contractor to ater plantings during construction period
MAINTENANCE TRACK - WHERE REQUIRED BY SUPER Integrity of protection devices
PROJECT DESCRIPTION VEGETATION PERFORMANCE OBJECTIVES - Criteria applies to tubestock planting
Performance
Retained vegetation trees retained in good ealt it
THIS WORK COMPRISES OF; · All tracks s all be installed in accordance it I specification and ave a indicators
no scars from eart orks mac inery
structurally stable surface generally provided by compacted e isting soils and mulc
Trees: At end of 12 month At end of 2 yr 3 Yr Off
1) CONSTRUCTION WORKS: · All tracks s all be monitored for structural integrity during t e maintenance period eekly inspection log by responsible person
Criteria establishment establishment maintenance Frequency
a Retaining associated drainage and ere storm ater flo s and ig ater tables impact on t e structural integrity
and maintenance and maintenance Objective
b Installation of slope drainage stabilisation products t e tracks ill be reconstructed it sands gravels and binding agents under
period period
c Tree protection fencing supervision of a certified civil engineer Responsible person for contractor reporting to super
· All sub surface drainage intersecting t e tracks must be designed and constructed in Percentage of 95% 90% 85% Responsible
accordance it t e NSC guidelines and provide adequate scour protection at t e person
REHABILITATION OF EXISTING VEGETATION WORKS; plants alive
a Installation of supplementary trees s rubs to improve canopy e tent point of disc arge and healthy ont ly for eac separable portion of contract to site
Reporting
bio diversity · All drainage pipes installed belo alking tracks must be properly si ed to suit t e Average height 1000mm 2000mm 3000mm
construction manager
local catc ments and flo requirements
REVEGETATION OF DEGRADED LAND; · T e minimum PVC pipe requirements is 2 100mm in locations ere levels Shrubs: At end of 12 month At end of 12 month Off
Corrective
ake good or replace any damage to trees or vegetation
cannot allo t e preferred minimum diameter of 300mm Criteria establishment establishment maintenance t at are marked for protection and retention; reinstate
a Installation of supplementary trees s rubs to create ne canopy and action
and maintenance and maintenance Objective protective devices
increase bio diversity
SLOPE STABILISATION - WHERE REQUIRED BY SUPER period period
ere stabilisation is identified refer to S PER for advice on ic met odology 3. WEED MANAGEMENT - CONSTRUCTION PHASE
2) VEGETATION MANAGEMENT & PROTECTION; Percentage of 95% 90% 85%
described belo is best suited · T is plan as been developed to specify regeneration operations for t e e isting
plants alive aquatic one riparian area upland one
3) WEED MANAGEMENT - CONSTRUCTION PHASE a) Rock stabilisation
and healthy · NOTE: T e regeneration plan must be read in conjunction it t e operational orks
a eed management under e isting canopy of all oody oods and Rock boulders gravels typically it geofabric under used as stabilisation
ere necessary No rock structure to be used it in t e aquatic one Refer Average height landscaping decision notice and site environmental management plan
reduction of erbaceous grassy eeds 400mm 1000mm 1200mm
to detail or width
b) Mulch OBJECTIVES
4) WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE
ere soils e posed install eed free forest fines mulc as soil protection 1 To en ance t e ecological value of t e locality
c) Mulch with Natural Fibre Netting 'Steep batter' 2. VEGETATION MANAGEMENT & PROTECTION 2 To remove eeds and minimise future incursion
1. CONSTRUCTION WORKS Natural Fibre matting applied ere necessary as soil protection for overflo · Native vegetation e ists on site In order to ma imise t e retained ecological values 3 Encourage natural recruitment and regeneration
PRELIMINARIES Install to manufactures specifications for t e site nominated e isting vegetation requires protection management 4 Re abilitate degraded areas
· Refer to plans by ot ers for all services locations footpat orks levels ot er t an d) Natural Fibre matting · Natural vegetation regeneration needs to be encouraged 5 Satisfy t e recreational requirements of residents as ell as t e ecological
t ose indicated on t ese plans boundaries All services related infrastructure Natural Fibre matting applied ere necessary as soil protection for overflo · Site eed removal is important to allo regeneration requirements of a flora and fauna reserve
including street lig ting s o n on t ese plans are indicative only Install to manufactures specifications · Vegetation to be protected is plan nominated predominately native species in a
· Call dial before you dig 11 00 prior to any excavation. e) Reinforced Turf ealt y safe condition t at are not located so as to interfere it required PRELIMINARIES
· Plan dimensions take precedence over scaled dimensions rass Roots synt etic matting applied it in aquatic one ere approved site orks · Before ork commences t e S PER is to organise a pre start meeting it t e
· Prior to commencing construction orks verify in t e field dimensions levels necessary Install to manufactures specifications · T e follo ing table summari es t e vegetation management program elements; landscape arc itect and SCC environment landscape officer to establis scope of
location of site services refer engineer s dra ings generally orks management procedures and clarify any issues
· Contractor to revie all sc edules erein to confirm t eir correlation to t ese plans EDGING TREE PROTECTION MEASURES · ere any discrepancies occur refer to A
ere discrepancies occur it in landscape documentation refer to A prior to · T e follo ing tree protection measures must at all times be ad ered to during any
Spade Edge
provision of tender pricing or construction
· Install Spade Cut edge as located on plans as per detail on site orks generally in accordance it AS49 0 2009 protection of trees on OPERATIONS - DISTURBED AREAS
· All proposed fence alignments e cept vegetation protection fencing are to be development sites A ill advise ere measures are required at Pre start but is · Identify eeds If unsure consult A All ot er vegetation to be protected and
pegged by a licensed surveyor in coordination it project surveyor generally to standard s of e isting trees t at are s o n as re abilitation areas retained
REVEGETATION AREAS
Soil · Prior to commencement of orks t e contractor to organise a pre construction · Treat all eeds and pasture grasses Refer to eed Removal Sc edule
SEDIMENT & EROSION CONTROL · ecompact ground and cultivate to 5mm deep
· Civil engineering eart ork operations ill ave arvested stockpiled site topsoils meeting to identify trees for protection removal and or pruning
· ere applicable T e landscape contractor to implement maintain for t e
andscape contractor to coordinate it civil contractor to ensure topsoil is · Protective fencing is to be installed around t e tree protection one generally in · rade ground surface to create smoot falls a ay from pat s ere necessary
contract duration best practice erosion sediment control measures in accordance accordance it AS49 0 2009 prior to site establis ment and remain intact and · Remove all ant ropogenic rubbis
re installed per t e follo ing specifications in respective landscape areas
it t e manual for erosion sediment control maroon manual good · op dead dying or dangerous limbs or trees as required to remove risk of injury to
· Clear remove all non organic deleterious and large organic matter suc as rocks monitored and certified by t e project arborist until completion of orks
environmental practice t e consulting civil engineers specification for erosion · Refer to etail for protective fencing specifications users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
greater t an 40mm diameter tree roots trunks limbs and stumps from all areas to
sediment control Penalties fines for non compliance ill apply · Any orks it in t e tree protection one to be supervised by t e project arborist ground surface it in regeneration ones at least 5 meters from pat s and ot er
be landscaped
· Install silt control fencing in accordance it site environmental management plan · E cavate and remove off site any remaining fill to turf and garden areas to ensure · Activities it in t e tree protection one are to be aut orised and supervised by t e infrastructure
local aut ority regulations project arborist No compaction from ve icles pedestrian movement stockpiling of · All felled vegetation is to be retained on site resultant mulc is to be used in
correct dept s for topsoils
· Sediment erosion control devices to be installed ere necessary as directed on · andscape contractor to conduct soils analyses tests to stockpiled topsoils and top soil e cavation no dumping of aste or cutting it in t e root one s is to revegetation landscaping or soil stabilisation activities
site by super occur · Add 100mm ulc to all disturbed areas
ameliorate per recommendations prior to re spreading Furnis la it results
· All sediment erosion control devices are to be installed in accordance it andscape contractor to allo for for p balancing nutrient ameliorations all soil · Any orks carried out beneat t e canopy s of t e tree is to be supervised by t e
manufacturer s specifications project arborist to ensure t at t e correct arboreal tec niques are utilised
testing to be conducted by a lab accredited by NATA
· T e contractor is responsible for ensuring sediment erosion control devices are NOOSA COUNCIL
inspected maintained as follo s;
A uring construction: aily during dry eat er APPROVED PLAN
Client Project
OPW21/0357 2 MARCH 2022
anembo consultants
NORTH TITLE: JOB No.: S21081100
FILE: 220224
DONOVAN BISS
D 24.02.22 COUNCIL RFI CK TH
503 Middle Creek Rd, Federal C 06.12.21 COUNCIL UPDATES CK TH DWG. No. LD2
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION PLAN B 17.09.21 COUNCIL SUBMISSION CK TH SHEET 2 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale A 23.08.21 FOR REVIEW CK TH - Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 SPECIFICATION NOTES -
Page 3
OPERATIONS - UNDISTURBED AREAS VEGETATION RETENTION & REVEGETATION AREAS ANNUAL MAINTENANCE REGIME
· Identify eeds If unsure consult A All ot er vegetation to be protected and TASK FREQUENCY PERFORMANCE INDICATOR
retained
Brushcutting / Every 2 eeks from October arc Regenerating plants and
NOOSA COUNCIL
· Treat all eeds and pasture grasses Refer to eed Removal Sc edule
· Remove all ant ropogenic rubbis
Slashing Every 4 eeks from April September revegetation areas free from APPROVED PLAN
competition it grass Remove
· op dead dying or dangerous limbs or trees as required to remove risk of injury to trim over anging branc es OPW21/0357 2 MARCH 2022
users of t e area Cut up aste material into 1 2 meter lengt s and place flat on t at interfere it brus cutting
ground surface it in regeneration ones at least 5 meters from pat s and ot er slas ing
infrastructure
· All felled vegetation is to be retained on site mulc is to be used in revegetation Weeding - by Every eek during inimal regro t of eeds No
landscaping or soil stabilisation activities hand Establis ment Period Every competition from unc ecked
2 eeks during aintenance eed and grass regro t
· Identify location for supplement planting for canopy integrity
Period beyond Remove all no ious ig risk
environmental eeds
WEED REMOVAL SCHEDULE
Spraying / Every 2 eeks from October No eeds or grass of greater
Task Operation Frequency Wick Wiping arc Every 4 eeks from eig t t an plant it in 500mm
Remove entire plant by and Alternatively kill Follo ing April September se a of plants Remove all no ious
Herbaceous plant it erbicide application using ick iper identification of Pre emergent erbicide if site is ig risk environmental eeds
and small or ooded spray no le For erbaceous eeds eeds As eavily eed infested C eck mo ing edge around site
weed control cut or scrape stem and paint it 1:1 mi of required to kill re spray if required
glyp osate and ater eeds
Re-mulching Allo to carry out at least once during niform 100mm deep to
rill and fill or frilling erbicide is delivered into Follo ing aintenance Period t en once per suppress eed gro t
Large and sap ood via drilled oles or frill cut pockets identification of year maintain soil moisture
woody weed immediately after ound is made If eeds As
Watering Every 2 or 3 days during Plants e ibit ealt y gro t
control accessibility permits cut stump met od Cut required to kill
Establis ment Period every eek no signs of ater stress
tree 30mm above ground and paint stump it eeds
during aintenance Period or as
undiluted glyp osate
required to maintain adequate soil
Remove aste material containing flo ers or Follo ing moisture
Remove or seeds or eed species from site t at can s oot identification of Fertilising As required ere en plants are Plants e ibit ealt y gro t
manage from pieces of plant ispose of at approved eeds As not responding to slo release no signs of ater stress
vegetative facility aste material to be covered en required to kill fertiliser applied at planting Allo to
waste removing from site eeds fertilise once during aintenance
Period
· ere furt er detail is required follo industry standards and met odologies or
contact S PER Storm Damage Follo ing storm event eavy rainfall Any damage noted rectified
Inspection or ig inds
4. WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE Pruning & To promote ealt y plant gro t Plants ave desired natural
· T is plan as been developed to specify regeneration operations for t e e isting Plant ont ly during Establis ment form display ealt y gro t
aquatic one riparian area upland one Maintenance Period Every 3 mont s during Remove vines from young
· NOTE: T e regeneration plan must be read in conjunction it t e operational orks aintenance Period beyond plants
landscaping decision notice and site environmental management plan As required or after flood event All litter removed disposed of
Rubbish
properly off site Organic flood
OBJECTIVES debris in trees it in reac
1 To en ance t e ecological value of t e locality en standing to be removed
2 To remove eeds and minimise future incursion spread on site
1m OUT OF GROUND, STAKE PAINTED PINK
3 Encourage natural recruitment and regeneration
Supplementary As required Replace dead dying 3x TUBE dia.
4 Re abilitate degraded areas
Planting damaged or stolen plants
5 Satisfy t e recreational requirements of residents as ell as t e ecological
requirements of a flora and fauna reserve
TUBESTOCK PLANT, REFER TO PLANT
· From practical completion all maintenance activities as per follo ing sc edule need SCHEDULE FOR SPECIES. TREE GUARD
to be conducted until project completion WHERE GRAZING & FROST OCCURS
FORM SHALLOW SAUCER SHAPED
WEED DISTRIBUTION TABLE: DEPRESSION AROUND PLANT BASE
100mm DEEP ORGANIC MULCH PER AS
SPECIFIED (500mm Diameter).
KEEP MINIMUM 50mm CLEAR OF PLANT STEM.
CULTIVATED SUBGRADE TO 150mm
FINISHES SCHEDULE
CODE ITEM PRODUCT / DESCRIPTION SIZE / PATTERN FINISH COLOUR
Top Soil Soil preparation As Smoot uniform eed free
Ameliorated site topsoil: Refer to
Top soil per Specification per plan topsoil mulc surfaces it no As supplied 10mg TERRAFORM PRODUCT GRANULES
specifications
nominated areas deleterious materials
niform finis 100mm deep free of deleterious
FB Organic ulc Street Tree garden pt and gardens 25mm composted materials Install pinned coir mes over bio retention As supplied SUBGRADE
Composted Forest itter basic mulc areas project entry batter and
storm ater overland flo pat lo flo s ales
Coir ES Coir es Coir Net 400gsm Coir ES pinned do n over ulc as As supplied
per manufactures specification
1 TUBESTOCK PLANTING N.T.S.
LD3 Typical Section
Client Project NORTH TITLE: JOB No.: S21081100
anembo consultants
FILE: 220224
DONOVAN BISS
D 24.02.22 COUNCIL RFI CK TH
503 Middle Creek Rd, Federal C 06.12.21 COUNCIL UPDATES CK TH DWG. No. LD3
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION PLAN B 17.09.21 COUNCIL SUBMISSION CK TH
SCHEDULE OF
FINISHES,
SHEET 3 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale A 23.08.21 FOR REVIEW CK TH SPECIFICATION NOTES - Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 & TYPICAL DETAIL -
Page 4
NOOSA COUNCIL
APPROVED PLAN
OPW21/0357 2 MARCH 2022
PLANT SCHEDULE 1 PLANT SCHEDULE 2 PLANT SCHEDULE 3
PLANT SCHEDULE 1 - Upper Bank Forest Revegetation Area 1 PLANT SCHEDULE 2 Lower Bank Forest Revegetation Area 1 PLANT SCHEDULE 3 Upper Bank Forest Revegetation Area 2
- Rehabilitation Plant Schedule: RE 12.3.1a - Rehabilitation Plant Schedule: RE 12.3.2
- Complex notophyll vine forest - Rehabilitation Plant Schedule: RE 12.3.2 - Eucalyptis grandis tall open forest on alluvial plans
- Total Approx Area: 1066 m² - Eucalyptis tereticornis +/- Eucalyptus siderophloia, corymbia - Total Approx Area: 371 m²
internmedia open forest on alluvial plains usually near coast
- Total Approx Area: 300 m²
Code GENUS species - Common Name Quantity Code GENUS species - Common Name Quantity
Trees @ 1/9m² 3m Spacing Code GENUS species - Common Name Quantity Trees @ 1/25m² 5m Spacing
IV aus IVISTONA aus 1 COR int COR BIA intermedia 4
CAS aus CASTANOSPER australe 1 Trees @ 1/25m² 5m Spacing E C mic E CA PT S microcorys 4
CR obo CR PTOCAR A obovata 1 COR int COR BIA intermedia 3 OP con OP OSTE ON confertus 4
E A gra E AEOCARPIS grandis 1 E C ter E CA PT S tereticornis 3 E sal E A E CA salicina 4
AT flo ATER O SIA floribunda 1 OP con OP OSTE ON suaveolens 3 TOTAL 16
S fra S I francisii 1 E sal E A E CA salicina 3 Groundcover
TRI lau TRISTANIPOSIS laurina 1 TOTAL 12 O ys O AN RA ystri 1 1 5m2 124
TOTAL 119 Groundcover T E tri T E E A triandra 1 m2 185
Groundcover O ys O AN RA ystri 1 1 5m2 100 TOTAL 309
O ys O AN RA ystri 1 1 5m2 355 T E tri T E E A triandra 1 m2 150
T E tri T E E A triandra 1 m2 533 TOTAL 250
TOTAL 888
REGIONAL ECOSYSTEM TABLES FOR REFERENCE
12.3.1a: 12.3.2: 12.3.11:
Comple notop yll vine forest Typical canopy species include Castanospermum Eucalyptus grandis E microcorys op ostemon confertus tall open forest it Eucalyptus tereticornis E siderop loia and Corymbia intermedia open
australe Elaeocarpus grandis revillea robusta Cryptocarya obovata vine forest understorey et sclerop yll Patc es of Eucalyptus pilularis forest to oodland Corymbia tessellaris op ostemon suaveolens and
Beilsc miedia obtusifolia yso ylum mollissimum subsp molle sometimes present especially in vicinity of sedimentary rocks e g around elaleuca quinquenervia frequently occur and often form a lo tree layer
Pseudo einmannia lac nocarpa Argyrodendron trifoliolatum Planc onella Palm oods Fringing streams and in narro gullies in ig rainfall areas BV 1 : Ot er species present in scattered patc es or lo densities include Angop ora
australis Ficus atkinsiana F macrop ylla forma macrop ylla Ap anant e 8a leiocarpa E e serta E grandis E latisinensis E tindaliae E racemosa and
p ilippinensis Toona ciliata and Sy ygium francisii Emergent Eucalyptus grandis elaleuca sieberi Corymbia trac yp loia and or C citriodora subsp Variegata
or op ostemon confertus may occur ater ousea floribunda and Tristaniopsis Vegetation communities in t is regional ecosystem include: may dominate on areas of Pleistocene alluvia Eucalyptus seeana may be
laurina may occur on banks of stream c annels Typical sub canopy species 12 3 2a: Open forest of Eucalyptus resinifera and Syncarpia glomulifera subsp present sout of andsboroug and ivistona decora may occur in scattered
include Cryptocarya triplinervis Arc ontop oeni cunning amiana Endiandra glomulifera it a et eat understorey Ot er species include elaleuca patc es or lo densities in t e lenbar SF and ongi SF areas Occurs on
pubens Arytera divaricata Sy ygium moorei and acadamia spp Occurs on linariifolia elaleuca sieberi Corymbia gummifera Narro gullies in ig rainfall uaternary alluvial plains and drainage lines along coastal lo lands Rainfall
uaternary alluvial plains and c annels in areas of ig rainfall generally areas Riverine etland or fringing riverine etland BV 1 : 8a usually e ceeds 1000mm y BV 1 : 1 c
1300mm Riverine etland or fringing riverine etland BV 1 : 4b
Client Project NORTH TITLE: JOB No.: S21081100
anembo consultants
FILE: 220224
DONOVAN BISS
D 24.02.22 COUNCIL RFI CK TH
503 Middle Creek Rd, Federal C 06.12.21 COUNCIL UPDATES CK TH DWG. No. LD4
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION PLAN B 17.09.21 COUNCIL SUBMISSION CK TH SHEET 4 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale A 23.08.21 FOR REVIEW CK TH - Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 PLANT SCHEDULES -
Page 5
Edge of LP2
NOOSA COUNCIL
o er Bank Forest Revegetation Area MCH254 LOT 244
Refer Plant Sc edule 2 APPROVED PLAN
Summary of Requirements pper Bank Forest Revegetation Area OPW21/0357 2 MARCH 2022
Area appro 300m2 Refer Plant sc edule 1
Re abilitation aim is for Summary of Requirements:
predominance of 12 3 2 species it Area appro 10 m2 E isting Forest anagement Area
full canopy Re abilitation aim is for predominance Summary Of Requirements:
remove any grass or eeds of 12 3 1a Species it full canopy Re abilitation aim is for mi of 12 3 1a 12 3 2 species it full
sequentially to provide space for Remove grass cover sequentially to canopy
mulc ing on eed mats provide space for mulc ing or eed ere any supplementary planting is required use species from
Provide minimum 500 500mm area mats RE tables on 4
iddle Creek Area
mulc ed or eed mat Provide minimum 500 500mm ere any stabilsation is required refer to spec and plant it
State and
install tubes as per specification mulc ed or eedmat lomandra ystri
oes Not Form Part of T is Application
sc edule Install tubes as per specification Nurture all emerging native regro t and protect from any eed
trees 5m spacing or 1 25m2 sc edule control orks
omandra ystri 1 5m2 trees 3m spacing s or 1 9m2 eed maintain monitor as per spec
T emeda triandra 1m2 omandra ystri 1 5m2
eed maintain monitor as per Top of Creek Bank T emeda triandra 1m2
spec eed maintain monitor as per spec
| | | | | | | | | | | |
| | | | |
iddle Creek Boundary
| | | | | |
| |
| | | |
| |
| |
| | |
| | |
| |
| | | | | |
| | | | |
| | |
| | |
| | |
20m
| | |
| |
|
LEGEND
20
|
| |
m
30m
|
| |
30m
E isting Forest
|
20m
anagement Area
3°04'30"
20
14.082
m
30
m pper Bank Forest
Proposed Buildings
Reveg Area 1
Refer to Plant Sc edule 1
Riparian Re abilitation Buffer Alignment
o er Bank Forest
20m From iddle Creek Boundary Reveg Area 1
Refer to Plant Sc edule 2
pper Bank Forest
Reveg Area 2
RP835350 LOT 8 Refer to Plant Sc edule 3
Edge of E isting Vegetation Cadcon Survey of E isting Vegetation Edge
Interpreted from nearmap ld lobe Verify on site Canopy eed E tent iddle Creek Area
Verify on site Adjust Plant Sc edule Accordingly Adjust Plant Sc edule Accordingly State and
Cadcon Survey of
pper Bank Forest Revegetation Area E isting Veg Edge
Summary of Requirements:
Area appro 10 m2
Nearmap ld lobe
Re abilitation aim is for predominance of 12 3 1a Species it full canopy y
Remove grass cover sequentially to provide space for mulc ing or eed mats rive a E isting Veg Edge
Provide minimum 500 500mm mulc ed or eed mat Property Boundary
Install tubes as per specification sc edule Riparian Re abiliation
trees 3m spacing s or 1 9m2
Buffer Alignment 20m
Edge of LP2
omandra ystri 1 5m2
Landscaped areas in accordance with Res Use
T emeda triandra 1m2
eed maintain monitor as per spec Property Boundary
Refer to plans
5"
2'0
°3
53 .63
Client Project NORTH JOB No.: S21081100
anembo consultants
2
13
TITLE:
FILE: 220224
DONOVAN BISS
D 24.02.22 COUNCIL RFI CK TH
503 Middle Creek Rd, Federal C 06.12.21 COUNCIL UPDATES CK TH DWG. No. LP1
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION PLAN B 17.09.21 COUNCIL SUBMISSION CK TH SHEET 5 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale A 23.08.21 FOR REVIEW CK TH SCALE 1:200 @A1 Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 LANDSCAPE PLAN SCALE 1:400 @A3
Page 6
Edge of LP1
NOOSA COUNCIL
APPROVED PLAN
OPW21/0357 2 MARCH 2022
iddle Creek Boundary
Edge of E isting Vegetation
Interpreted from nearmap ld lobe
Verify on site Adjust Plant Sc edule Accordingly
E isting Forest anagement Area
Summary Of Requirements:
Re abilitation aim is for mi of 12 3 1a 12 3 2 species it full
Property Boundary canopy
ere any supplementary planting is required use species from
RE tables on 4
ere any stabilsation is required refer to spec and plant it
o er Bank Forest Revegetation Area lomandra ystri
LEGEND Refer Plant Sc edule 3 Nurture all emerging native regro t and protect from any eed
Summary of Requirements control orks
E isting Forest Area appro 3 1m2 eed maintain monitor as per spec
anagement Area Re abilitation aim is for
predominance of 12 3 2 species
it full canopy
pper Bank Forest remove any grass or eeds
Reveg Area 1 sequentially to provide space for
Refer to Plant Sc edule 1 mulc ing on eed mats
Provide minimum 500 500mm area
mulc ed or eed mat
o er Bank Forest install tubes as per specification iddle Creek Area
Reveg Area 1 sc edule State and
Refer to Plant Sc edule 2 trees 5m spacing or 1 25m2 oes Not Form Part of T is Application
omandra ystri 1 5m2
T emeda triandra 1m2
pper Bank Forest eed maintain monitor as per
Reveg Area 2 spec
Refer to Plant Sc edule 3
iddle Creek Area
State and
RP835350 LOT 8
Cadcon Survey of
20m
E isting Veg Edge
Nearmap ld lobe
Riparian Re abilitation Buffer Alignment 20m
E isting Veg Edge Lan
dsca From iddle Creek Boundary
peda
rea
Riparian Re abiliation s in a
cco
Buffer Alignment 20m rd anc
Edge of LP1
ew
ith
R es U
Property Boundary se
Refer to plans
Client Project NORTH TITLE: JOB No.: S21081100
anembo consultants
FILE: 220224
DONOVAN BISS
D 24.02.22 COUNCIL RFI CK TH
503 Middle Creek Rd, Federal C 06.12.21 COUNCIL UPDATES CK TH DWG. No. LP2
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION PLAN B 17.09.21 COUNCIL SUBMISSION CK TH SHEET 6 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale A 23.08.21 FOR REVIEW CK TH SCALE 1:200 @A1 Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 LANDSCAPE PLAN SCALE 1:400 @A3