Approved Plans 220224 Middle Creek Rd

of 6

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                      503 Middle Creek rd, Federal
                                                                                                                                                                                                                                                                                                                                                                          Re abilitation Plan
                                                                                                                                                                                                                                                                                                                                                                                      ec 2021

                                                                                                                                                                                                                                                                                                                                                                     NOOSA COUNCIL
                                                                                                                                                                                                                                                                                                                                                                     APPROVED PLAN
                                                                                                                                                                                                                                                                                                                                                                  OPW21/0357 2 MARCH 2022




                                                                                                                                                                                                                                                                                                The following landscape operational works plan package consists of the following schedule of
                                                                                                                                                                                                                                                                                                drawings;

                                                                                                                                                                                                                                                                                                       LD1           eneral Notes
                                                                                                                                                                                                                                                                                                       LD2           eneral Notes
                                                                                                                                                                                                                                                                                                       LD3         Finis es Sc edule     aintenance Notes     Typical etail
                                                                                                                                                                                                                                                                                                       LD4         Plant Sc edules
                                                                                                                                 | | | | |
                                                                                                                        | |                                            |      | | |                                                                                                                    LP1-2         andscape Plans


                                                                                                              |
                                                                                                                  |   |
                                                                                                                                                                                          |   | | |                                                                                             This package has been developed to comply with;
                                                                                                                                                                                                                                                                                                        C 20 014
                                                                LP2                                                                              LP1                                                                                                                                                  Noosa Plan 2020
                                                                                               |
                                                                                                                                                                                                              |                                                                                       Invasive Plants isted in t e Biosecurity Act 2014




                                                                                                                                                                                                                     3°04'30"
                                                                                                                                                                                                                                14.082
                                                                                                                                                                                                                                                                                                      Noosa Biosecurity Plan 2020

                                                                                                                                                                                                                                                                                                Sources;
                                                                                                                                                                                                                                                                                                     CA con Surveying       To n Planning

                                                                                                                                                                                                                                                                                                Sample Approvals;
                                                                                                                                                                                                                                                                                               ·    Furnis A it follo ing samples for A approval prior to construction;
                                                                                                                                                                                                                                                                                                     Composted Forest itter


                                                                                                                                                                  "
                                                                                                                                                             2'05
                                                                                                                                                        53°3      63
                                                                                                                                                            132.




                                                                                 146.56
                                                                              290°04
                                                                                       '30"




                                                                                                                                                                                                                                                                                                                                         503 Middle Creed Rd,
                                                                                                                                                                                                                                                                                                                                         Federal QLD 4568




          SHEET KEY LAYOUT                                                                                                                                                                                                                                       N.T.S                      SITE LOCATION                                                                                                    N.T.S
                                                                                                                                                                                                                                                                                            Lot 8 on RP835350



Client                                                         Project                                                                                                                                                                                                NORTH                                      TITLE:                  JOB No.: S21081100
                                                                                                                                                                                                                                                                                                                                                                              anembo consultants
                                                                                                                                                                                                                                                                                                                                          FILE:   220224
DONOVAN BISS
                                                                                                                                                                                                    D     24.02.22                         COUNCIL RFI      CK   TH
                                                               503 Middle Creek Rd, Federal                                                                                                         C     06.12.21                       COUNCIL UPDATES    CK   TH                                                                       DWG. No.   LD1
                                                                                                                                                                                                                                                                                                                                                                              Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                              Environmental
                                                                                                                                                                                                                                                                                                                                                                                                                  Project Management


This document is the copyright of anembo consultants & shall
                                                               LANDSCAPE REHABILITATION PLAN                                                                                                        B     17.09.21 COUNCIL SUBMISSION                       CK   TH                                                                      SHEET    1 OF 6                      anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                              Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                                A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                            Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale                                                                                                                                            A     23.08.21                         FOR REVIEW       CK   TH                                                                       -                                   Ph: 07 5437 0000
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                           email: [email protected]                 www.anembo.com
                                                                                               ISSUE   DATE       DESCRIPTION   DRWN CKD ISSUE   DATE                      DESCRIPTION   DRWN CKD ISSUE    DATE                            DESCRIPTION     DRWN CKD   APPROVED:   T Hindley ALIA 713             GENERAL NOTES            -
Log in to download the original file

Approved Plans 220224 Middle Creek Rd.pdf · 995 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 5 pages

Page 2

                                                                                          inspected maintained as follo s;
PROJECT SPECIFICATIONS                                                                         A uring construction:                          aily during dry eat er                            Cultivate                                                                                                               VEGETATION MANAGEMENT PROTECTION PROGRAM
This plan has been developed to comply with the Noosa Shire Council                                                                          Prior to predicted storm events                    · Cultivate ground in all disturbed areas to a dept                      ere possible to 5mm dept for
Planning Scheme as applicable where practical                                                                                                T ice daily during prolonged rain                    inspection before installation of soil reveg                                                                           Issue                    Vegetation management - clearing & protection
ABBREVIATIONS                                                                                                                                                                                   · Avoiding any root systems
AS Australian Standard                                ot dipped                                 B   uring establis ment period:              eekly during dry eat er                                                                                                                                                     Objective                 Identify areas of vegetation individual trees to be
EP Establis ment Period                           A andscape Arc itect                                                                     Prior to predicted storm events                      Mulch                                                                                                                                              protected retained it in t e development areas t ose
N A Not applicable                               OC On centre                                                                              T ice eekly during prolonged rain                    · Organic and inorganic mulc es are required to be installed over all garden areas                                                                 to be cleared
  P   aintenace Period                           m2 Square metres                       · All stockpiles are to be protected it suitable erosion control devices graded to                            ere s o n on t e dra ings                                                                                                                    Ensure t at orkers understand t e requirements of
m3 Cubic etres                                   T P Typical                              ensure control of runoff                                                                              · All mulc es supplied must be clean free from live eeds eed seeds specifically                                                                    protection retention install protective devices to
NATA National Association of Testing Aut orities S PER Superintendent                   · Coordinate installation of sediment erosion control devices it civil contractor to                      nutsedge pests soil borne viruses and diseases Furt er S PER it certifications                                                                   ensure no accidental damage occurs
                                                                                          ensure compatibility consistency in control measures                                                    respectively for approval prior to installations                                                                                                 Ensure t at clearing met ods are appropriate for areas
uPVC    nplasticised polyvinyl C loride Pipe     NSC Noosa S ire Council
                                                                                        · All e posed surfaces once completed s all be immediately stabili ed to prevent                                                                                                                                                                           being cleared especially in t e vicinity of areas to be
  B     ater by esign                             AO andscape Assessment Officer                                                                                                                  ulc types include:
                                                                                                                                                                                                                                                                                                                                                   protected
                                                                                          erosion                                                                                               · Forest Blend ulc 100mm dept to all revegetation areas
                                                                                                                                                                                                                                                                                                                                                   Ensure t at t e ork program is suc as to minimise t e
PROJECT PLANNING CONDITIONS - DEMONSTRATION OF COMPLIANCE                                                                                                                                       · Coir es and Sugar Cane To all bio basin media                                                                                                    time bet een en clearing occurs t e cleared ground
· Apart from declared eeds all e isting vegetation s all be retained as been            SITEWORKS & DRAINAGE                                                                                    Furt er information located in Finis es Sc edule and dra ings                                                                                      is stabilised to reduce t e c ances of silt movement
  identified it retention protection measures for suc are nominated erein               · Remove all un anted material deleterious        operational debris from site T ese                    · Supply install to s ale areas a layer of 50 100mm gravel spalls to 150mm dept                                                                    Ensure t at cleared material is mulc ed or ood c ipped
· Identified areas are confined to areas of eed management t ose nominated on             materials include but are not limited to: Star pickets abandoned fencing concrete                                                                                                                                                                        as appropriate or disposed of in an approved manner
  t ese plans it associated orks described erein                                          pipes posts etc Recycle t ese materials en practical ot er ise dispose of                             REHABILITATION AREAS
· Plant sc edules are as per;                                                             properly off site                                                                                     TUBESTOCK PLANTING, SETOUT & TREE GUARD                                                                                  Tasks                      Ensure vegetation to be retained is correctly identified
                                                                                        ·    ere bad ground occurs or levels provided are not functional refer to S PER                         · Bamboo stake setout of trees and s rubs for approval by S PER                                                                                     clearly marked protective devices are installed
              RE 12 3 1a                                                                · Ensure site drainage can occur to ole of site          ere pat s edges gardens                        · Setout to be staggered and random to account for terrain variation and replicate                                                                  maintained in functional condition
              RE 12 3 2                                                                   etc may impede drainage refer to super before continuing orks                                           natural c aracter                                                                                                                                 Vegetation to be retained protected s all be as
              RE 12 3 11                                                                · Ensure drainage orks correlate it adjacent land                                                       · Install tubes per re abilitation sc edules densities specifications details                                                                       nominated per plan field adjusted on site by la
              All required species substitutions are to be confirmed in riting          · Civil design as provided a positively drained site o ever        ere drainage issues                  · Install tree guard in nominated location as per detail                                                                                            Protection fence s all be used to protect vegetation
              from council s parks branc prior to t e commence of any landscape ork       are identified refer S PER                                                                            · aintain as per sc edule                                                                                                                           nominated for retention Fence to be as per detail
                                                                                                                                                                                                 andscape contractor to ater plantings during construction period
                                                                                        MAINTENANCE TRACK - WHERE REQUIRED BY SUPER                                                                                                                                                                                                                 Integrity of protection devices
PROJECT DESCRIPTION                                                                                                                                                                             VEGETATION PERFORMANCE OBJECTIVES - Criteria applies to tubestock planting
                                                                                                                                                                                                                                                                                                                          Performance
                                                                                                                                                                                                                                                                                                                                                    Retained vegetation trees retained in good ealt                  it
 THIS WORK COMPRISES OF;                                                                · All tracks s all be installed in accordance it I specification and ave a                                                                                                                                                        indicators
                                                                                                                                                                                                                                                                                                                                                    no scars from eart orks mac inery
                                                                                          structurally stable surface generally provided by compacted e isting soils and mulc
                                                                                                                                                                                                 Trees:                        At end of 12 month At end of 2 yr                                 3 Yr Off
    1)        CONSTRUCTION WORKS:                                                       · All tracks s all be monitored for structural integrity during t e maintenance period                                                                                                                                                                      eekly inspection   log by responsible person
                                                                                                                                                                                                 Criteria                      establishment      establishment                                  maintenance              Frequency
              a Retaining associated drainage                                             and ere storm ater flo s and ig ater tables impact on t e structural integrity
                                                                                                                                                                                                                               and maintenance    and maintenance                                Objective
              b Installation of slope drainage stabilisation products                     t e tracks ill be reconstructed it sands gravels and binding agents under
                                                                                                                                                                                                                               period             period
              c Tree protection fencing                                                   supervision of a certified civil engineer                                                                                                                                                                                                               Responsible person for contractor reporting to super
                                                                                        · All sub surface drainage intersecting t e tracks must be designed and constructed in                   Percentage of                 95%                            90%                                85%                      Responsible
                                                                                          accordance it t e NSC guidelines and provide adequate scour protection at t e                                                                                                                                                   person
              REHABILITATION OF EXISTING VEGETATION WORKS;                                                                                                                                       plants alive
              a Installation of supplementary trees s rubs to improve canopy e tent       point of disc arge                                                                                     and healthy                                                                                                                                       ont ly for eac separable portion of contract to site
                                                                                                                                                                                                                                                                                                                          Reporting
                bio diversity                                                           · All drainage pipes installed belo      alking tracks must be properly si ed to suit t e                Average height                1000mm                         2000mm                             3000mm
                                                                                                                                                                                                                                                                                                                                                  construction manager
                                                                                          local catc ments and flo requirements
              REVEGETATION OF DEGRADED LAND;                                            · T e minimum PVC pipe requirements is 2 100mm in locations ere levels                                   Shrubs:                       At end of 12 month At end of 12 month                             Off
                                                                                                                                                                                                                                                                                                                          Corrective
                                                                                                                                                                                                                                                                                                                                                    ake good or replace any damage to trees or vegetation
                                                                                          cannot allo t e preferred minimum diameter of 300mm                                                    Criteria                      establishment      establishment                                  maintenance                                      t at are marked for protection and retention; reinstate
              a Installation of supplementary trees s rubs to create ne canopy and                                                                                                                                                                                                                                        action
                                                                                                                                                                                                                               and maintenance    and maintenance                                Objective                                        protective devices
              increase bio diversity
                                                                                        SLOPE STABILISATION - WHERE REQUIRED BY SUPER                                                                                          period             period
                                                                                           ere stabilisation is identified refer to S PER for advice on ic met odology                                                                                                                                                  3. WEED MANAGEMENT - CONSTRUCTION PHASE
    2)        VEGETATION MANAGEMENT & PROTECTION;                                                                                                                                                Percentage of                 95%                            90%                                85%
                                                                                        described belo is best suited                                                                                                                                                                                                   · T is plan as been developed to specify regeneration operations for t e e isting
                                                                                                                                                                                                 plants alive                                                                                                             aquatic one riparian area       upland one
    3)        WEED MANAGEMENT - CONSTRUCTION PHASE                                        a)     Rock stabilisation
                                                                                                                                                                                                 and healthy                                                                                                            · NOTE: T e regeneration plan must be read in conjunction it t e operational orks
              a eed management under e isting canopy of all oody oods and                        Rock boulders gravels typically it geofabric under used as stabilisation
                                                                                                    ere necessary No rock structure to be used it in t e aquatic one Refer                       Average height                                                                                                           landscaping decision notice and site environmental management plan
              reduction of erbaceous grassy eeds                                                                                                                                                                               400mm                          1000mm                             1200mm
                                                                                                 to detail                                                                                       or width
                                                                                          b)     Mulch                                                                                                                                                                                                                  OBJECTIVES
    4)        WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE
                                                                                                     ere soils e posed install eed free forest fines mulc as soil protection                                                                                                                                            1 To en ance t e ecological value of t e locality
                                                                                          c)     Mulch with Natural Fibre Netting 'Steep batter'                                                2. VEGETATION MANAGEMENT & PROTECTION                                                                                   2 To remove eeds and minimise future incursion
1. CONSTRUCTION WORKS                                                                            Natural Fibre matting applied ere necessary as soil protection for overflo                     · Native vegetation e ists on site In order to ma imise t e retained ecological values                                  3 Encourage natural recruitment and regeneration
PRELIMINARIES                                                                                    Install to manufactures specifications                                                           for t e site nominated e isting vegetation requires protection                             management                 4 Re abilitate degraded areas
· Refer to plans by ot ers for all services locations footpat orks levels ot er t an      d)     Natural Fibre matting                                                                          · Natural vegetation regeneration needs to be encouraged                                                                5 Satisfy t e recreational requirements of residents as ell as t e ecological
  t ose indicated on t ese plans       boundaries All services related infrastructure            Natural Fibre matting applied ere necessary as soil protection for overflo                     · Site eed removal is important to allo regeneration                                                                       requirements of a flora and fauna reserve
  including street lig ting s o n on t ese plans are indicative only                             Install to manufactures specifications                                                         · Vegetation to be protected is plan nominated predominately native species in a
· Call dial before you dig 11 00 prior to any excavation.                                 e)     Reinforced Turf                                                                                   ealt y safe condition t at are not located so as to interfere it required                                            PRELIMINARIES
· Plan dimensions take precedence over scaled dimensions                                           rass Roots synt etic matting applied it in aquatic one ere                                     approved site orks                                                                                                    · Before ork commences t e S PER is to organise a pre start meeting it t e
· Prior to commencing construction orks verify in t e field dimensions levels                    necessary Install to manufactures specifications                                               · T e follo ing table summari es t e vegetation management program elements;                                              landscape arc itect and SCC environment landscape officer to establis scope of
  location of site services refer engineer s dra ings generally                                                                                                                                                                                                                                                             orks management procedures and clarify any issues
· Contractor to revie all sc edules erein to confirm t eir correlation to t ese plans   EDGING                                                                                                  TREE PROTECTION MEASURES                                                                                                ·    ere any discrepancies occur refer to A
      ere discrepancies occur it in landscape documentation refer to A prior to                                                                                                                 · T e follo ing tree protection measures must at all times be ad ered to during any
                                                                                        Spade Edge
  provision of tender pricing or construction
                                                                                        · Install Spade Cut edge as located on plans      as per detail                                           on site orks generally in accordance it AS49 0 2009 protection of trees on                                            OPERATIONS - DISTURBED AREAS
· All proposed fence alignments e cept vegetation protection fencing are to be                                                                                                                    development sites A ill advise ere measures are required at Pre start but is                                          · Identify eeds If unsure consult A All ot er vegetation to be protected and
  pegged by a licensed surveyor in coordination it project surveyor                                                                                                                               generally to standard s of e isting trees t at are s o n as re abilitation areas                                        retained
                                                                                        REVEGETATION AREAS
                                                                                        Soil                                                                                                    · Prior to commencement of orks t e contractor to organise a pre construction                                           · Treat all eeds and pasture grasses Refer to eed Removal Sc edule
SEDIMENT & EROSION CONTROL                                                                                                                                                                                                                                                                                              · ecompact ground and cultivate to 5mm deep
                                                                                        · Civil engineering eart ork operations ill ave arvested stockpiled site topsoils                         meeting to identify trees for protection removal and or pruning
·     ere applicable T e landscape contractor to implement maintain for t e
                                                                                           andscape contractor to coordinate it civil contractor to ensure topsoil is                           · Protective fencing is to be installed around t e tree protection one generally in                                     · rade ground surface to create smoot falls a ay from pat s ere necessary
  contract duration best practice erosion sediment control measures in accordance                                                                                                                 accordance it AS49 0 2009 prior to site establis ment and remain intact and                                           · Remove all ant ropogenic rubbis
                                                                                          re installed per t e follo ing specifications in respective landscape areas
    it t e manual for erosion sediment control maroon manual good                                                                                                                                                                                                                                                       · op dead dying or dangerous limbs or trees as required to remove risk of injury to
                                                                                        · Clear remove all non organic deleterious and large organic matter suc as rocks                          monitored and certified by t e project arborist until completion of orks
  environmental practice t e consulting civil engineers specification for erosion                                                                                                               · Refer to etail for protective fencing specifications                                                                    users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
                                                                                          greater t an 40mm diameter tree roots trunks limbs and stumps from all areas to
  sediment control Penalties fines for non compliance ill apply                                                                                                                                 · Any orks it in t e tree protection one to be supervised by t e project arborist                                         ground surface it in regeneration ones at least 5 meters from pat s and ot er
                                                                                          be landscaped
· Install silt control fencing in accordance it site environmental management plan      · E cavate and remove off site any remaining fill to turf and garden areas to ensure                    · Activities it in t e tree protection one are to be aut orised and supervised by t e                                     infrastructure
  local aut ority regulations                                                                                                                                                                     project arborist No compaction from ve icles pedestrian movement stockpiling of                                       · All felled vegetation is to be retained on site resultant mulc is to be used in
                                                                                          correct dept s for topsoils
· Sediment erosion control devices to be installed ere necessary as directed on         · andscape contractor to conduct soils analyses tests to stockpiled topsoils and                          top soil e cavation no dumping of aste or cutting it in t e root one s is to                                            revegetation landscaping or soil stabilisation activities
  site by super                                                                                                                                                                                   occur                                                                                                                 · Add 100mm ulc to all disturbed areas
                                                                                          ameliorate per recommendations prior to re spreading Furnis la it results
· All sediment erosion control devices are to be installed in accordance it                andscape contractor to allo for for p balancing nutrient ameliorations all soil                      · Any orks carried out beneat t e canopy s of t e tree is to be supervised by t e
  manufacturer s specifications                                                                                                                                                                   project arborist to ensure t at t e correct arboreal tec niques are utilised
                                                                                          testing to be conducted by a lab accredited by NATA
· T e contractor is responsible for ensuring sediment erosion control devices are                                                                                                                                                                                                                                                                               NOOSA COUNCIL
  inspected maintained as follo s;
         A uring construction:                        aily during dry eat er                                                                                                                                                                                                                                                                                    APPROVED PLAN
Client                                                                  Project
                                                                                                                                                                                                                                                                                                                                                             OPW21/0357 2 MARCH 2022
                                                                                                                                                                                                                                                                                                                                                                       anembo consultants
                                                                                                                                                                                                                                                            NORTH                                         TITLE:              JOB No.: S21081100
                                                                                                                                                                                                                                                                                                                              FILE:    220224
DONOVAN BISS
                                                                                                                                                                                                             D     24.02.22     COUNCIL RFI       CK   TH
                                                                        503 Middle Creek Rd, Federal                                                                                                         C     06.12.21   COUNCIL UPDATES     CK   TH                                                                     DWG. No.     LD2
                                                                                                                                                                                                                                                                                                                                                                        Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                        Environmental
                                                                                                                                                                                                                                                                                                                                                                                                            Project Management


This document is the copyright of anembo consultants & shall
                                                                        LANDSCAPE REHABILITATION PLAN                                                                                                        B     17.09.21 COUNCIL SUBMISSION    CK   TH                                                                     SHEET      2 OF 6                         anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                        Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                          A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                      Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale                                                                                                                                                     A     23.08.21     FOR REVIEW        CK   TH                                                                      -                                        Ph: 07 5437 0000
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                     email: [email protected]                www.anembo.com
                                                                                                                           ISSUE   DATE   DESCRIPTION     DRWN CKD ISSUE   DATE   DESCRIPTION     DRWN CKD ISSUE    DATE        DESCRIPTION      DRWN CKD   APPROVED:   T Hindley ALIA 713                SPECIFICATION NOTES -

Page 3

            OPERATIONS - UNDISTURBED AREAS                                                                                        VEGETATION RETENTION & REVEGETATION AREAS ANNUAL MAINTENANCE REGIME
            · Identify eeds If unsure consult A All ot er vegetation to be protected and                                           TASK               FREQUENCY                                          PERFORMANCE INDICATOR
              retained
                                                                                                                                  Brushcutting /      Every 2 eeks from October arc                      Regenerating plants and
                                                                                                                                                                                                                                                                                                                                                                                  NOOSA COUNCIL
            · Treat all eeds and pasture grasses Refer to eed Removal Sc edule
            · Remove all ant ropogenic rubbis
                                                                                                                                  Slashing            Every 4 eeks from April September                  revegetation areas free from                                                                                                                                             APPROVED PLAN
                                                                                                                                                                                                         competition it grass Remove
            · op dead dying or dangerous limbs or trees as required to remove risk of injury to                                                                                                            trim over anging branc es                                                                                                                                           OPW21/0357 2 MARCH 2022
              users of t e area Cut up aste material into 1 2 meter lengt s and place flat on                                                                                                            t at interfere it brus cutting
              ground surface it in regeneration ones at least 5 meters from pat s and ot er                                                                                                              slas ing
              infrastructure
            · All felled vegetation is to be retained on site mulc is to be used in revegetation                                  Weeding - by        Every eek during                                    inimal regro t of eeds No
              landscaping or soil stabilisation activities                                                                        hand                Establis ment Period Every                         competition from unc ecked
                                                                                                                                                      2 eeks during aintenance                            eed and grass regro t
            · Identify location for supplement planting for canopy integrity
                                                                                                                                                      Period beyond                                      Remove all no ious    ig risk
                                                                                                                                                                                                         environmental eeds
            WEED REMOVAL SCHEDULE
                                                                                                                                  Spraying /          Every 2 eeks from October                          No eeds or grass of greater
                Task                     Operation                                     Frequency                                  Wick Wiping           arc Every 4 eeks from                             eig t t an plant it in 500mm
                                         Remove entire plant by and Alternatively kill Follo ing                                                      April September se a                               of plants Remove all no ious
                Herbaceous               plant it erbicide application using ick iper identification of                                               Pre emergent erbicide if site is                    ig risk environmental eeds
                and small                or ooded spray no le For erbaceous eeds eeds As                                                               eavily eed infested                               C eck mo ing edge around site
                weed control             cut or scrape stem and paint it 1:1 mi of     required to kill                                                                                                    re spray if required
                                         glyp osate and ater                             eeds
                                                                                                                                  Re-mulching          Allo to carry out at least once during             niform 100mm deep to
                                           rill and fill or frilling erbicide is delivered into Follo ing                                                aintenance Period t en once per                 suppress eed gro t
                Large and                sap ood via drilled oles or frill cut pockets          identification of                                      year                                              maintain soil moisture
                woody weed               immediately after ound is made If                        eeds As
                                                                                                                                   Watering           Every 2 or 3 days during                           Plants e ibit ealt y gro t
                control                  accessibility permits cut stump met od Cut             required to kill
                                                                                                                                                      Establis ment Period every eek                     no signs of ater stress
                                         tree 30mm above ground and paint stump it                eeds
                                                                                                                                                      during aintenance Period or as
                                         undiluted glyp osate
                                                                                                                                                      required to maintain adequate soil
                                         Remove aste material containing flo ers or                      Follo ing                                    moisture
                Remove or                seeds or eed species from site t at can s oot                   identification of        Fertilising         As required ere            en plants are           Plants e ibit ealt y gro t
                manage                   from pieces of plant ispose of at approved                        eeds As                                    not responding to slo release                      no signs of ater stress
                vegetative               facility aste material to be covered en                         required to kill                             fertiliser applied at planting Allo to
                waste                    removing from site                                                eeds                                       fertilise once during aintenance
                                                                                                                                                      Period
            ·      ere furt er detail is required follo industry standards and met odologies or
                contact S PER                                                                                                     Storm Damage        Follo ing storm event          eavy rainfall       Any damage noted       rectified
                                                                                                                                  Inspection          or ig inds
            4. WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE                                                                    Pruning &           To promote ealt y plant gro t                      Plants ave desired natural
            · T is plan as been developed to specify regeneration operations for t e e isting                                     Plant                ont ly during Establis ment                       form display ealt y gro t
                aquatic one riparian area                      upland one                                                         Maintenance         Period Every 3 mont s during                       Remove vines from young
            · NOTE: T e regeneration plan must be read in conjunction it t e operational orks                                                          aintenance Period beyond                          plants
                landscaping decision notice and site environmental management plan                                                                     As required     or after flood event              All litter removed disposed of
                                                                                                                                  Rubbish
                                                                                                                                                                                                         properly off site Organic flood
            OBJECTIVES                                                                                                                                                                                   debris in trees it in reac
            1 To en ance t e ecological value of t e locality                                                                                                                                                en standing to be removed
            2 To remove eeds and minimise future incursion                                                                                                                                               spread on site
                                                                                                                                                                                                                                                                                                                                                                 1m OUT OF GROUND, STAKE PAINTED PINK
            3 Encourage natural recruitment and regeneration
                                                                                                                                  Supplementary        As required                                       Replace dead dying                                                                                               3x TUBE dia.
            4 Re abilitate degraded areas
                                                                                                                                  Planting                                                               damaged     or stolen plants
            5 Satisfy t e recreational requirements of residents as ell as t e ecological
               requirements of a flora and fauna reserve
                                                                                                                                                                                                                                                                                                                                                                 TUBESTOCK PLANT, REFER TO PLANT
            · From practical completion all maintenance activities as per follo ing sc edule need                                                                                                                                                                                                                                                                SCHEDULE FOR SPECIES. TREE GUARD
                to be conducted until project completion                                                                                                                                                                                                                                                                                                         WHERE GRAZING & FROST OCCURS
                                                                                                                                                                                                                                                                                                                                                                 FORM SHALLOW SAUCER SHAPED
                                                                                                                                  WEED DISTRIBUTION TABLE:                                                                                                                                                                                                       DEPRESSION AROUND PLANT BASE

                                                                                                                                                                                                                                                                                                                                                                 100mm DEEP ORGANIC MULCH PER AS
                                                                                                                                                                                                                                                                                                                                                                 SPECIFIED (500mm Diameter).
                                                                                                                                                                                                                                                                                                                                                                 KEEP MINIMUM 50mm CLEAR OF PLANT STEM.




                                                                                                                                                                                                                                                                                                                                                                 CULTIVATED SUBGRADE TO 150mm

         FINISHES SCHEDULE
           CODE ITEM                                                PRODUCT / DESCRIPTION                       SIZE / PATTERN                     FINISH                                                       COLOUR
                                                                                                                Top Soil Soil preparation As       Smoot uniform         eed free
                                                                    Ameliorated site topsoil: Refer to
                        Top soil                                                                                per Specification per plan         topsoil mulc surfaces it no                                  As supplied                                                                                                                                      10mg TERRAFORM PRODUCT GRANULES
                                                                    specifications
                                                                                                                nominated areas                    deleterious materials

                                                                                                                                                     niform finis 100mm deep free of deleterious
             FB         Organic        ulc                          Street Tree garden pt and gardens           25mm         composted             materials Install pinned coir mes over bio retention         As supplied                                                                                                                                      SUBGRADE
                                                                     Composted Forest itter                                                        basic mulc areas project entry batter and
                                                                                                                                                   storm ater overland flo pat lo flo s ales

                        Coir     ES                                 Coir    es   Coir Net                       400gsm                             Coir ES pinned do n over ulc as                              As supplied
                                                                                                                                                   per manufactures specification
                                                                                                                                                                                                                                                                                                             1            TUBESTOCK PLANTING                                                N.T.S.
                                                                                                                                                                                                                                                                                                            LD3           Typical Section




Client                                                                                      Project                                                                                                                                                                                      NORTH                                      TITLE:              JOB No.: S21081100
                                                                                                                                                                                                                                                                                                                                                                                             anembo consultants
                                                                                                                                                                                                                                                                                                                                                         FILE:    220224
DONOVAN BISS
                                                                                                                                                                                                                                            D   24.02.22     COUNCIL RFI       CK   TH
                                                                                            503 Middle Creek Rd, Federal                                                                                                                    C   06.12.21   COUNCIL UPDATES     CK   TH                                                                   DWG. No.   LD3
                                                                                                                                                                                                                                                                                                                                                                                             Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                                             Environmental
                                                                                                                                                                                                                                                                                                                                                                                                                                 Project Management


This document is the copyright of anembo consultants & shall
                                                                                            LANDSCAPE REHABILITATION PLAN                                                                                                                   B   17.09.21 COUNCIL SUBMISSION    CK   TH
                                                                                                                                                                                                                                                                                                                                    SCHEDULE OF
                                                                                                                                                                                                                                                                                                                                    FINISHES,
                                                                                                                                                                                                                                                                                                                                                        SHEET 3 OF 6                         anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                                             Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                                               A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                                           Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale                                                                                                                                                                                    A   23.08.21     FOR REVIEW        CK   TH                                              SPECIFICATION NOTES -                                    Ph: 07 5437 0000
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                                          email: [email protected]                www.anembo.com
                                                                                                                                                        ISSUE   DATE   DESCRIPTION      DRWN CKD ISSUE   DATE    DESCRIPTION   DRWN CKD ISSUE    DATE        DESCRIPTION      DRWN CKD   APPROVED:   T Hindley ALIA 713             & TYPICAL DETAIL    -

Page 4

                                                                                                                                                                                                                                                                                                                                          NOOSA COUNCIL
                                                                                                                                                                                                                                                                                                                                          APPROVED PLAN
                                                                                                                                                                                                                                                                                                                                       OPW21/0357 2 MARCH 2022
                               PLANT SCHEDULE 1                                                                                PLANT SCHEDULE 2                                                                                                                                      PLANT SCHEDULE 3
                               PLANT SCHEDULE 1 - Upper Bank Forest Revegetation Area 1                                        PLANT SCHEDULE 2 Lower Bank Forest Revegetation Area 1                                                                                                PLANT SCHEDULE 3 Upper Bank Forest Revegetation Area 2

                                  -        Rehabilitation Plant Schedule: RE 12.3.1a                                                                                                                                                                                                  -     Rehabilitation Plant Schedule: RE 12.3.2
                                  -        Complex notophyll vine forest                                                         -         Rehabilitation Plant Schedule: RE 12.3.2                                                                                                   -     Eucalyptis grandis tall open forest on alluvial plans
                                  -        Total Approx Area: 1066 m²                                                            -         Eucalyptis tereticornis +/- Eucalyptus siderophloia, corymbia                                                                              -     Total Approx Area: 371 m²
                                                                                                                                           internmedia open forest on alluvial plains usually near coast
                                                                                                                                 -         Total Approx Area: 300 m²
                               Code                    GENUS species - Common Name               Quantity                                                                                                                                                                            Code             GENUS species - Common Name                            Quantity

                               Trees @ 1/9m² 3m Spacing                                                                        Code                GENUS species - Common Name                                                       Quantity                                        Trees @ 1/25m² 5m Spacing
                                IV aus     IVISTONA aus                                              1                                                                                                                                                                               COR int    COR BIA intermedia                                                 4
                               CAS aus    CASTANOSPER         australe                               1                         Trees @ 1/25m² 5m Spacing                                                                                                                             E C mic    E CA PT S microcorys                                               4
                               CR obo     CR PTOCAR A obovata                                        1                         COR int    COR BIA intermedia                                                                                  3                                       OP con     OP OSTE ON confertus                                              4
                               E A gra    E AEOCARPIS grandis                                        1                         E C ter    E CA PT S tereticornis                                                                              3                                       E sal      E A E CA salicina                                                 4
                                 AT flo     ATER O SIA floribunda                                    1                          OP con     OP OSTE ON suaveolens                                                                              3                                                                                                 TOTAL              16
                               S fra      S     I   francisii                                        1                          E sal      E A E CA salicina                                                                                  3                                      Groundcover
                               TRI lau    TRISTANIPOSIS laurina                                      1                                                                                                                TOTAL                   12                                      O     ys   O AN RA ystri              1 1 5m2                                124
                                                                                        TOTAL        119                       Groundcover                                                                                                                                           T E tri   T E E A triandra             1 m2                                   185
                               Groundcover                                                                                      O     ys   O AN RA ystri                         1 1 5m2                                                      100                                                                                               TOTAL              309
                                O     ys   O AN RA ystri               1 1 5m2                       355                       T E tri   T E E A triandra                        1 m2                                                         150
                               T E tri   T E E A triandra              1 m2                          533                                                                                                              TOTAL                   250
                                                                                        TOTAL        888




                               REGIONAL ECOSYSTEM TABLES FOR REFERENCE

                              12.3.1a:                                                                                         12.3.2:                                                                                                                                                12.3.11:
                              Comple notop yll vine forest Typical canopy species include Castanospermum                       Eucalyptus grandis     E microcorys op ostemon confertus tall open forest it                                                                           Eucalyptus tereticornis      E siderop loia and Corymbia intermedia open
                              australe Elaeocarpus grandis revillea robusta Cryptocarya obovata                                vine forest understorey et sclerop yll Patc es of Eucalyptus pilularis                                                                                 forest to oodland Corymbia tessellaris op ostemon suaveolens and
                              Beilsc miedia obtusifolia yso ylum mollissimum subsp molle                                       sometimes present especially in vicinity of sedimentary rocks e g around                                                                                 elaleuca quinquenervia frequently occur and often form a lo tree layer
                              Pseudo einmannia lac nocarpa Argyrodendron trifoliolatum Planc onella                            Palm oods Fringing streams and in narro gullies in ig rainfall areas BV 1 :                                                                            Ot er species present in scattered patc es or lo densities include Angop ora
                              australis Ficus atkinsiana F macrop ylla forma macrop ylla Ap anant e                            8a                                                                                                                                                     leiocarpa E e serta E grandis E latisinensis E tindaliae E racemosa and
                              p ilippinensis Toona ciliata and Sy ygium francisii Emergent Eucalyptus grandis                                                                                                                                                                           elaleuca sieberi Corymbia trac yp loia and or C citriodora subsp Variegata
                              or op ostemon confertus may occur ater ousea floribunda and Tristaniopsis                        Vegetation communities in t is regional ecosystem include:                                                                                             may dominate on areas of Pleistocene alluvia Eucalyptus seeana may be
                              laurina may occur on banks of stream c annels Typical sub canopy species                         12 3 2a: Open forest of Eucalyptus resinifera and Syncarpia glomulifera subsp                                                                          present sout of andsboroug and ivistona decora may occur in scattered
                              include Cryptocarya triplinervis Arc ontop oeni cunning amiana Endiandra                         glomulifera it a et eat understorey Ot er species include elaleuca                                                                                     patc es or lo densities in t e lenbar SF and ongi SF areas Occurs on
                              pubens Arytera divaricata Sy ygium moorei and acadamia spp Occurs on                             linariifolia elaleuca sieberi   Corymbia gummifera Narro gullies in ig rainfall                                                                          uaternary alluvial plains and drainage lines along coastal lo lands Rainfall
                                uaternary alluvial plains and c annels in areas of ig rainfall generally                       areas Riverine etland or fringing riverine etland BV 1 : 8a                                                                                            usually e ceeds 1000mm y BV 1 : 1 c
                                1300mm Riverine etland or fringing riverine etland BV 1 : 4b




Client                                                                    Project                                                                                                                                                                   NORTH                                    TITLE:              JOB No.: S21081100
                                                                                                                                                                                                                                                                                                                                                 anembo consultants
                                                                                                                                                                                                                                                                                                                 FILE:   220224
DONOVAN BISS
                                                                                                                                                                                                    D     24.02.22     COUNCIL RFI       CK    TH
                                                                         503 Middle Creek Rd, Federal                                                                                               C     06.12.21   COUNCIL UPDATES     CK    TH                                                                DWG. No.     LD4
                                                                                                                                                                                                                                                                                                                                                 Landscape Architects
                                                                                                                                                                                                                                                                                                                                                 Environmental
                                                                                                                                                                                                                                                                                                                                                                                     Project Management


This document is the copyright of anembo consultants & shall
                                                                         LANDSCAPE REHABILITATION PLAN                                                                                              B     17.09.21 COUNCIL SUBMISSION    CK    TH                                                                SHEET      4 OF 6               anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                 Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                   A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                               Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale                                                                                                                                            A     23.08.21     FOR REVIEW        CK    TH                                                                -                               Ph: 07 5437 0000
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                              email: [email protected]                www.anembo.com
                                                                                                                ISSUE   DATE         DESCRIPTION   DRWN CKD ISSUE   DATE   DESCRIPTION   DRWN CKD ISSUE    DATE        DESCRIPTION      DRWN CKD    APPROVED:   T Hindley ALIA 713           PLANT SCHEDULES     -

Page 5

                    Edge of LP2
                                                                                                                                                                                                                                                                                                                                                                                      NOOSA COUNCIL
                                       o er Bank Forest Revegetation Area                                                                                                         MCH254 LOT 244
                                      Refer Plant Sc edule 2                                                                                                                                                                                                                                                                                                                          APPROVED PLAN
                                      Summary of Requirements                                                                                                                                                                                   pper Bank Forest Revegetation Area                                                                                                 OPW21/0357 2 MARCH 2022
                                      Area appro 300m2                                                                                                                                                                                         Refer Plant sc edule 1
                                             Re abilitation aim is for                                                                                                                                                                         Summary of Requirements:
                                             predominance of 12 3 2 species it                                                                                                                                                                 Area appro 10 m2                                                                             E isting Forest anagement Area
                                             full canopy                                                                                                                                                                                              Re abilitation aim is for predominance                                                Summary Of Requirements:
                                             remove any grass or eeds                                                                                                                                                                                 of 12 3 1a Species it full canopy                                                            Re abilitation aim is for mi of 12 3 1a 12 3 2 species it full
                                             sequentially to provide space for                                                                                                                                                                        Remove grass cover sequentially to                                                           canopy
                                             mulc ing on eed mats                                                                                                                                                                                     provide space for mulc ing or eed                                                               ere any supplementary planting is required use species from
                                             Provide minimum 500 500mm area                                                                                                                                                                           mats                                                                                         RE tables on 4
                                                                                                      iddle Creek Area
                                             mulc ed or eed mat                                                                                                                                                                                       Provide minimum 500 500mm                                                                       ere any stabilsation is required refer to spec and plant it
                                                                                                             State and
                                             install tubes as per specification                                                                                                                                                                       mulc ed or eedmat                                                                            lomandra ystri
                                                                                                              oes Not Form Part of T is Application
                                             sc edule                                                                                                                                                                                                 Install tubes as per specification                                                           Nurture all emerging native regro t and protect from any eed
                                             trees     5m spacing or 1 25m2                                                                                                                                                                           sc edule                                                                                     control orks
                                               omandra ystri       1 5m2                                                                                                                                                                              trees     3m spacing s or 1 9m2                                                                eed maintain monitor as per spec
                                             T emeda triandra       1m2                                                                                                                                                                                 omandra ystri       1 5m2
                                                eed maintain monitor as per                                                                                                        Top of Creek Bank                                                  T emeda triandra       1m2
                                             spec                                                                                                                                                                                                        eed maintain monitor as per spec




                                                                                                                                              | | | | | | | | | | | |
                                                                                                                                    |   |                                                         | | |
                                   iddle Creek Boundary
                                                                                                                              | |                                                                              |                    | | |
                                                                                                                       |    |
                                                                                                                                                                                                                                               |       | | |
                                                                                                                 |   |
                                                                                                                                                                                                                                                                          | |
                                                                                                           |   |                                                                                                                                                   |
                                                                                                                                                                                                                                                                                 | | |
                                                                                                  |    |
                                                                                            |   |                                                                                                                                                                                                |    | | |
                                                                                      | |                                                                                                                                                                                                                                 | | |
                                                                                |   |                                                                                                                                                                                                                                 |
                                                                                                                                                                                                                                                                                                                                           | | |
                                                                          |   |                                                                                                                                                                                                                                                      |




                                                                                                                                                                                                                                                                                                                                            20m
                                                                                                                                                                                                                                                                                                                                                   |   | |
                                                                                                                                                                                                                                                                                                                                                             | |
                                                                      |




                                                                                                                                                                                                                                                                                                                                                                                                       LEGEND
                                                                                                                            20
                                                                |




                                                                                                                                                                                                                                                                                                                                                                       | |
                                                                                                                               m



                                                                                                                                             30m
                                                                 |




                                                                                                                                                                                                                                                                                                                                                                             | |




                                                                                                                                                                                                                                                                           30m
                                                                                                                                                                                                                                                                                                                                                                                                                  E isting Forest
                                                               |




                                                                                                                                                                                                                                                                         20m
                                                                                                                                                                                                                                                                                                                                                                                                                   anagement Area




                                                                                                                                                                                                                                                                                                                                                                                   3°04'30"
                                                                                                           20




                                                                                                                                                                                                                                                                                                                                                                                              14.082
                                                                                                             m




                                                                                                   30
                                                                                                      m                                                                                                                                                                                                                                                                                                            pper Bank Forest
                                                                                                                                                                  Proposed Buildings
                                                                                                                                                                                                                                                                                                                                                                                                                  Reveg Area 1
                                                                                                                                                                                                                                                                                                                                                                                                                  Refer to Plant Sc edule 1


                                                                                                                                                                                                                                                   Riparian Re abilitation Buffer Alignment
                                                                                                                                                                                                                                                                                                                                                                                                                   o er Bank Forest
                                                                                                                                                                                                                                                        20m From iddle Creek Boundary                                                                                                                             Reveg Area 1
                                                                                                                                                                                                                                                                                                                                                                                                                  Refer to Plant Sc edule 2


                                                                                                                                                                                                                                                                                                                                                                                                                   pper Bank Forest
                                                                                                                                                                                                                                                                                                                                                                                                                  Reveg Area 2
                                                                                                                           RP835350 LOT 8                                                                                                                                                                                                                                                                         Refer to Plant Sc edule 3

                                                                                         Edge of E isting Vegetation                                                                                                                                                                         Cadcon Survey of E isting Vegetation Edge
                                                                                             Interpreted from nearmap     ld lobe                                                                                                                                                                 Verify on site Canopy     eed E tent                                                                              iddle Creek Area
                                                                                             Verify on site Adjust Plant Sc edule Accordingly                                                                                                                                                       Adjust Plant Sc edule Accordingly                                                                             State and

                                                                                                                                                                                                                                                                                                                                                                                                                  Cadcon Survey of
                                                     pper Bank Forest Revegetation Area                                                                                                                                                                                                                                                                                                                           E isting Veg Edge
                                                    Summary of Requirements:
                                                    Area appro 10 m2
                                                                                                                                                                                                                                                                                                                                                                                                                  Nearmap      ld lobe
                                                          Re abilitation aim is for predominance of 12 3 1a Species it full canopy                                 y
                                                          Remove grass cover sequentially to provide space for mulc ing or eed mats                          rive a                                                                                                                                                                                                                                               E isting Veg Edge
                                                          Provide minimum 500 500mm mulc ed or eed mat                                                                                                                                                                                               Property Boundary
                                                          Install tubes as per specification sc edule                                                                                                                                                                                                                                                                                                             Riparian Re abiliation
                                                          trees     3m spacing s or 1 9m2
                                                                                                                                                                                                                                                                                                                                                                                                                  Buffer Alignment 20m
                    Edge of LP2




                                                            omandra ystri       1 5m2
                                                                                                                                                    Landscaped areas in accordance with Res Use
                                                          T emeda triandra       1m2
                                                             eed maintain monitor as per spec                                                                                                                                                                                                                                                                                                                     Property Boundary
                                                                                                                                                                                                                                                                                                                                                                                                                  Refer to plans
                                                                                                                                                                                                                           5"
                                                                                                                                                                                                                        2'0
                                                                                                                                                                                                                     °3
                                                                                                                                                                                                                   53         .63



Client                                                                         Project                                                                                                                                                                                               NORTH                                                               JOB No.: S21081100
                                                                                                                                                                                                                                                                                                                                                                                                         anembo consultants
                                                                                                                                                                                                                           2
                                                                                                                                                                                                                        13
                                                                                                                                                                                                                                                                                                                                  TITLE:
                                                                                                                                                                                                                                                                                                                                                         FILE:   220224
DONOVAN BISS
                                                                                                                                                                                                                                       D    24.02.22     COUNCIL RFI       CK   TH
                                                                              503 Middle Creek Rd, Federal                                                                                                                             C    06.12.21   COUNCIL UPDATES     CK   TH                                                                       DWG. No.     LP1
                                                                                                                                                                                                                                                                                                                                                                                                         Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                                                         Environmental
                                                                                                                                                                                                                                                                                                                                                                                                                                             Project Management


This document is the copyright of anembo consultants & shall
                                                                              LANDSCAPE REHABILITATION PLAN                                                                                                                            B    17.09.21 COUNCIL SUBMISSION    CK   TH                                                                       SHEET      5 OF 6                               anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                                                         Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                                                           A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                                                       Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale                                                                                                                                                                               A    23.08.21     FOR REVIEW        CK   TH                                                                       SCALE 1:200 @A1                                 Ph: 07 5437 0000
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                                                      email: [email protected]                www.anembo.com
                                                                                                                                            ISSUE   DATE   DESCRIPTION   DRWN CKD ISSUE   DATE   DESCRIPTION   DRWN CKD ISSUE                DATE        DESCRIPTION      DRWN CKD   APPROVED:   T Hindley ALIA 713               LANDSCAPE PLAN         SCALE 1:400 @A3

Page 6

                                                                                                                                                                                                                                                                                                                                                                  Edge of LP1
                                                                                                                                                                                                                                                                                                                  NOOSA COUNCIL
                                                                                                                                                                                                                                                                                                                  APPROVED PLAN
                                                                                                                                                                                                                                                                                                               OPW21/0357 2 MARCH 2022




                                                                                                   iddle Creek Boundary




                                                                                                                Edge of E isting Vegetation
                                                                                                                    Interpreted from nearmap     ld lobe
                                                                                                                    Verify on site Adjust Plant Sc edule Accordingly
                                                                                                                                                                                                                                               E isting Forest anagement Area
                                                                                                                                                                                                                                               Summary Of Requirements:
                                                                                                                                                                                                                                                      Re abilitation aim is for mi of 12 3 1a 12 3 2 species it full
                    Property Boundary                                                                                                                                                                                                                 canopy
                                                                                                                                                                                                                                                         ere any supplementary planting is required use species from
                                                                                                                                                                                                                                                      RE tables on 4
                                                                                                                                                                                                                                                         ere any stabilsation is required refer to spec and plant it
                                                                                                                                                         o er Bank Forest Revegetation Area                                                           lomandra ystri
    LEGEND                                                                                                                                              Refer Plant Sc edule 3                                                                        Nurture all emerging native regro t and protect from any eed
                                                                                                                                                        Summary of Requirements                                                                       control orks
                          E isting Forest                                                                                                               Area appro 3 1m2                                                                                eed maintain monitor as per spec
                           anagement Area                                                                                                                    Re abilitation aim is for
                                                                                                                                                             predominance of 12 3 2 species
                                                                                                                                                               it full canopy
                           pper Bank Forest                                                                                                                  remove any grass or eeds
                          Reveg Area 1                                                                                                                       sequentially to provide space for
                          Refer to Plant Sc edule 1                                                                                                          mulc ing on eed mats
                                                                                                                                                             Provide minimum 500 500mm area
                                                                                                                                                             mulc ed or eed mat
                           o er Bank Forest                                                                                                                  install tubes as per specification                                                                         iddle Creek Area
                          Reveg Area 1                                                                                                                       sc edule                                                                                                        State and
                          Refer to Plant Sc edule 2                                                                                                          trees     5m spacing or 1 25m2                                                                                    oes Not Form Part of T is Application
                                                                                                                                                               omandra ystri       1 5m2
                                                                                                                                                             T emeda triandra       1m2
                           pper Bank Forest                                                                                                                     eed maintain monitor as per
                          Reveg Area 2                                                                                                                       spec
                          Refer to Plant Sc edule 3


                            iddle Creek Area
                          State and
                                                                                                                                                                            RP835350 LOT 8
                          Cadcon Survey of




                                                                                                                                                                                                                                                                                                                           20m
                          E isting Veg Edge

                          Nearmap      ld lobe
                                                                                                                                                                                                                                                                        Riparian Re abilitation Buffer Alignment 20m
                          E isting Veg Edge                                               Lan
                                                                                              dsca                                                                                                                                                                                    From iddle Creek Boundary
                                                                                                   peda
                                                                                                           rea
                          Riparian Re abiliation                                                               s   in a
                                                                                                                        cco
                          Buffer Alignment 20m                                                                              rd anc




                                                                                                                                                                                                                                                                                                                                                                   Edge of LP1
                                                                                                                                  ew
                                                                                                                                    ith
                                                                                                                                        R     es U
                          Property Boundary                                                                                                            se
                          Refer to plans


Client                                                         Project                                                                                                                                                                 NORTH                                     TITLE:               JOB No.: S21081100
                                                                                                                                                                                                                                                                                                                                 anembo consultants
                                                                                                                                                                                                                                                                                                       FILE:   220224
DONOVAN BISS
                                                                                                                                                                                        D     24.02.22     COUNCIL RFI       CK   TH
                                                               503 Middle Creek Rd, Federal                                                                                             C     06.12.21   COUNCIL UPDATES     CK   TH                                                                   DWG. No.   LP2
                                                                                                                                                                                                                                                                                                                                 Landscape Architects
                                                                                                                                                                                                                                                                                                                                 Environmental
                                                                                                                                                                                                                                                                                                                                                                          Project Management


This document is the copyright of anembo consultants & shall
                                                               LANDSCAPE REHABILITATION PLAN                                                                                            B     17.09.21 COUNCIL SUBMISSION    CK   TH                                                                  SHEET    6 OF 6            anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                 Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                   A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                               Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale                                                                                                                                A     23.08.21     FOR REVIEW        CK   TH                                                                   SCALE 1:200 @A1           Ph: 07 5437 0000
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                              email: [email protected]                          www.anembo.com
                                                                                                        ISSUE   DATE    DESCRIPTION   DRWN CKD ISSUE   DATE   DESCRIPTION    DRWN CKD ISSUE    DATE        DESCRIPTION      DRWN CKD   APPROVED:   T Hindley ALIA 713            LANDSCAPE PLAN        SCALE 1:400 @A3

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.