Approved Plans 220224 Middle Creek Rd

of 6

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
            OPERATIONS - UNDISTURBED AREAS                                                                                        VEGETATION RETENTION & REVEGETATION AREAS ANNUAL MAINTENANCE REGIME
            · Identify eeds If unsure consult A All ot er vegetation to be protected and                                           TASK               FREQUENCY                                          PERFORMANCE INDICATOR
              retained
                                                                                                                                  Brushcutting /      Every 2 eeks from October arc                      Regenerating plants and
                                                                                                                                                                                                                                                                                                                                                                                  NOOSA COUNCIL
            · Treat all eeds and pasture grasses Refer to eed Removal Sc edule
            · Remove all ant ropogenic rubbis
                                                                                                                                  Slashing            Every 4 eeks from April September                  revegetation areas free from                                                                                                                                             APPROVED PLAN
                                                                                                                                                                                                         competition it grass Remove
            · op dead dying or dangerous limbs or trees as required to remove risk of injury to                                                                                                            trim over anging branc es                                                                                                                                           OPW21/0357 2 MARCH 2022
              users of t e area Cut up aste material into 1 2 meter lengt s and place flat on                                                                                                            t at interfere it brus cutting
              ground surface it in regeneration ones at least 5 meters from pat s and ot er                                                                                                              slas ing
              infrastructure
            · All felled vegetation is to be retained on site mulc is to be used in revegetation                                  Weeding - by        Every eek during                                    inimal regro t of eeds No
              landscaping or soil stabilisation activities                                                                        hand                Establis ment Period Every                         competition from unc ecked
                                                                                                                                                      2 eeks during aintenance                            eed and grass regro t
            · Identify location for supplement planting for canopy integrity
                                                                                                                                                      Period beyond                                      Remove all no ious    ig risk
                                                                                                                                                                                                         environmental eeds
            WEED REMOVAL SCHEDULE
                                                                                                                                  Spraying /          Every 2 eeks from October                          No eeds or grass of greater
                Task                     Operation                                     Frequency                                  Wick Wiping           arc Every 4 eeks from                             eig t t an plant it in 500mm
                                         Remove entire plant by and Alternatively kill Follo ing                                                      April September se a                               of plants Remove all no ious
                Herbaceous               plant it erbicide application using ick iper identification of                                               Pre emergent erbicide if site is                    ig risk environmental eeds
                and small                or ooded spray no le For erbaceous eeds eeds As                                                               eavily eed infested                               C eck mo ing edge around site
                weed control             cut or scrape stem and paint it 1:1 mi of     required to kill                                                                                                    re spray if required
                                         glyp osate and ater                             eeds
                                                                                                                                  Re-mulching          Allo to carry out at least once during             niform 100mm deep to
                                           rill and fill or frilling erbicide is delivered into Follo ing                                                aintenance Period t en once per                 suppress eed gro t
                Large and                sap ood via drilled oles or frill cut pockets          identification of                                      year                                              maintain soil moisture
                woody weed               immediately after ound is made If                        eeds As
                                                                                                                                   Watering           Every 2 or 3 days during                           Plants e ibit ealt y gro t
                control                  accessibility permits cut stump met od Cut             required to kill
                                                                                                                                                      Establis ment Period every eek                     no signs of ater stress
                                         tree 30mm above ground and paint stump it                eeds
                                                                                                                                                      during aintenance Period or as
                                         undiluted glyp osate
                                                                                                                                                      required to maintain adequate soil
                                         Remove aste material containing flo ers or                      Follo ing                                    moisture
                Remove or                seeds or eed species from site t at can s oot                   identification of        Fertilising         As required ere            en plants are           Plants e ibit ealt y gro t
                manage                   from pieces of plant ispose of at approved                        eeds As                                    not responding to slo release                      no signs of ater stress
                vegetative               facility aste material to be covered en                         required to kill                             fertiliser applied at planting Allo to
                waste                    removing from site                                                eeds                                       fertilise once during aintenance
                                                                                                                                                      Period
            ·      ere furt er detail is required follo industry standards and met odologies or
                contact S PER                                                                                                     Storm Damage        Follo ing storm event          eavy rainfall       Any damage noted       rectified
                                                                                                                                  Inspection          or ig inds
            4. WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE                                                                    Pruning &           To promote ealt y plant gro t                      Plants ave desired natural
            · T is plan as been developed to specify regeneration operations for t e e isting                                     Plant                ont ly during Establis ment                       form display ealt y gro t
                aquatic one riparian area                      upland one                                                         Maintenance         Period Every 3 mont s during                       Remove vines from young
            · NOTE: T e regeneration plan must be read in conjunction it t e operational orks                                                          aintenance Period beyond                          plants
                landscaping decision notice and site environmental management plan                                                                     As required     or after flood event              All litter removed disposed of
                                                                                                                                  Rubbish
                                                                                                                                                                                                         properly off site Organic flood
            OBJECTIVES                                                                                                                                                                                   debris in trees it in reac
            1 To en ance t e ecological value of t e locality                                                                                                                                                en standing to be removed
            2 To remove eeds and minimise future incursion                                                                                                                                               spread on site
                                                                                                                                                                                                                                                                                                                                                                 1m OUT OF GROUND, STAKE PAINTED PINK
            3 Encourage natural recruitment and regeneration
                                                                                                                                  Supplementary        As required                                       Replace dead dying                                                                                               3x TUBE dia.
            4 Re abilitate degraded areas
                                                                                                                                  Planting                                                               damaged     or stolen plants
            5 Satisfy t e recreational requirements of residents as ell as t e ecological
               requirements of a flora and fauna reserve
                                                                                                                                                                                                                                                                                                                                                                 TUBESTOCK PLANT, REFER TO PLANT
            · From practical completion all maintenance activities as per follo ing sc edule need                                                                                                                                                                                                                                                                SCHEDULE FOR SPECIES. TREE GUARD
                to be conducted until project completion                                                                                                                                                                                                                                                                                                         WHERE GRAZING & FROST OCCURS
                                                                                                                                                                                                                                                                                                                                                                 FORM SHALLOW SAUCER SHAPED
                                                                                                                                  WEED DISTRIBUTION TABLE:                                                                                                                                                                                                       DEPRESSION AROUND PLANT BASE

                                                                                                                                                                                                                                                                                                                                                                 100mm DEEP ORGANIC MULCH PER AS
                                                                                                                                                                                                                                                                                                                                                                 SPECIFIED (500mm Diameter).
                                                                                                                                                                                                                                                                                                                                                                 KEEP MINIMUM 50mm CLEAR OF PLANT STEM.




                                                                                                                                                                                                                                                                                                                                                                 CULTIVATED SUBGRADE TO 150mm

         FINISHES SCHEDULE
           CODE ITEM                                                PRODUCT / DESCRIPTION                       SIZE / PATTERN                     FINISH                                                       COLOUR
                                                                                                                Top Soil Soil preparation As       Smoot uniform         eed free
                                                                    Ameliorated site topsoil: Refer to
                        Top soil                                                                                per Specification per plan         topsoil mulc surfaces it no                                  As supplied                                                                                                                                      10mg TERRAFORM PRODUCT GRANULES
                                                                    specifications
                                                                                                                nominated areas                    deleterious materials

                                                                                                                                                     niform finis 100mm deep free of deleterious
             FB         Organic        ulc                          Street Tree garden pt and gardens           25mm         composted             materials Install pinned coir mes over bio retention         As supplied                                                                                                                                      SUBGRADE
                                                                     Composted Forest itter                                                        basic mulc areas project entry batter and
                                                                                                                                                   storm ater overland flo pat lo flo s ales

                        Coir     ES                                 Coir    es   Coir Net                       400gsm                             Coir ES pinned do n over ulc as                              As supplied
                                                                                                                                                   per manufactures specification
                                                                                                                                                                                                                                                                                                             1            TUBESTOCK PLANTING                                                N.T.S.
                                                                                                                                                                                                                                                                                                            LD3           Typical Section




Client                                                                                      Project                                                                                                                                                                                      NORTH                                      TITLE:              JOB No.: S21081100
                                                                                                                                                                                                                                                                                                                                                                                             anembo consultants
                                                                                                                                                                                                                                                                                                                                                         FILE:    220224
DONOVAN BISS
                                                                                                                                                                                                                                            D   24.02.22     COUNCIL RFI       CK   TH
                                                                                            503 Middle Creek Rd, Federal                                                                                                                    C   06.12.21   COUNCIL UPDATES     CK   TH                                                                   DWG. No.   LD3
                                                                                                                                                                                                                                                                                                                                                                                             Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                                             Environmental
                                                                                                                                                                                                                                                                                                                                                                                                                                 Project Management


This document is the copyright of anembo consultants & shall
                                                                                            LANDSCAPE REHABILITATION PLAN                                                                                                                   B   17.09.21 COUNCIL SUBMISSION    CK   TH
                                                                                                                                                                                                                                                                                                                                    SCHEDULE OF
                                                                                                                                                                                                                                                                                                                                    FINISHES,
                                                                                                                                                                                                                                                                                                                                                        SHEET 3 OF 6                         anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                                             Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                                               A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                                           Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale                                                                                                                                                                                    A   23.08.21     FOR REVIEW        CK   TH                                              SPECIFICATION NOTES -                                    Ph: 07 5437 0000
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                                          email: [email protected]                www.anembo.com
                                                                                                                                                        ISSUE   DATE   DESCRIPTION      DRWN CKD ISSUE   DATE    DESCRIPTION   DRWN CKD ISSUE    DATE        DESCRIPTION      DRWN CKD   APPROVED:   T Hindley ALIA 713             & TYPICAL DETAIL    -
Log in to download the original file

Approved Plans 220224 Middle Creek Rd.pdf · 995 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗