Approved Plans OPW17/0055

of 35

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 23, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
DocuSign Envelope ID: 3C8D6058-F042-4FB0-8808-169246829F7D
             BIO RETENTION BASIN CONSTRUCTION SEQUENCE NOTES:
                                                                                                                                      B
             THE CONSTRUCTION AND ESTABLISHMENT OF BIO RETENTION BASINS IS TO BE IN ACCORDANCE WITH COUNCILS 'INFRASTRUCTURE                                                                                                         -
                 INSTALLATION AND CONSTRUCTION REQUIREMENTS MANUAL - SECTIONS 3.4 AND 8.5.1, AND STORMWATER MANAGEMENT
                 CONSTRUCTION AND MAINTENANCE PLAN FOR COOROY RETIREMENT COMMUNITY DATED FEB 2017 AND AS FOLLOWS:
             1. CIVIL WORKS FUNCTIONAL INSTALLATION – INITIALLY THE BASIN LOCATIONS MUST BE USED AS A SEDIMENT BASINS OR TRAPS. ONCE
                                                                                                                                                                                              NOOSA COUNCIL
                 THERE IS 80% GROUNDCOVER OF THE UPSTREAM CATCHMENT DISCHARGING TO THE BASIN, THE FUNCTIONAL ELEMENTS OF THE
                 BIORETENTION DEVICES WILL BE UNDERTAKEN. THIS INCLUDES INSTALLATION OF FUNCTIONAL ELEMENTS (E.G. INLETS, OUTLETS
                 STRUCTURES, SUBSOIL DRAINAGE, TRANSITION LAYERS AND FILTER MEDIA) MUST BE UNDERTAKEN AS PER THE METHODOLOGY
                                                                                                                                                                                              APPROVED PLAN
                 DETAILED IN SECTION 3.9.1 IN THE WATER BY DESIGN CONSTRUCTION AND ESTABLISHMENT GUIDELINES (2011). THE FUNCTIONAL
                 ELEMENTS MUST BE PROTECTED FROM CONSTRUCTION SEDIMENT LOADS BY:
                                                                                                                                                                                           OPW17/0055 13 APR 2017                                                                                                                                FILTER MEDIA - DEPTH 400mm SANDY
                                                                                                                                                                                                                                                                                                                                                 LOAM CONSISTENT WITH CURRENT                  B
                      · SEDIMENT FENCES AROUND THE PERIMETER OF THE SYSTEMS.                                                                                                                                                                                                                                                                     FAWB SPECIFICATIONS
                      · LAYING A TEMPORARY FILTER CLOTH (OR 25MM THICK LAYER OF COURSE SAND AND 25MM OF TOPSOIL) OVER THE                                                                                                                                                                                                                           TRANSITION LAYER - DEPTH 100mm
                         BIORETENTION FILTER. THIS WILL BE KEPT IN PLACE DURING THE FINALISATION OF CIVIL WORKS AND THE BUILDING PHASE.                                                                                                                                                                                                             COARSE SAND - NOMINAL PARTICLE SIZE 1mm
                                                                                                                                                                                                       C.I. CAP. EXTEND CAP TO                                                  150mm x 150mm CONCRETE
                      · SUBJECT TO TIMEFRAME OF BUILDING WORKS TOPSOIL CAN BE SEEDED.                                                                                                                                                                                           SURROUND TO CLEANOUT RISER                                                             LINER TO EXTEND 300mm INTO MEDIA
                                                                                                                                                                                                       APPROX. 100mm ABOVE
             2. BUILDING PHASE CONSTRUCTION – DURING THIS PHASE THE BIORETENTION DEVICES MUST CONTINUE TO OPERATE AS TEMPORARY                                                                                                                                                                                                                                         AND BE FIXED TO PERIMETER OF PIT
                                                                                                                                                                                                       BIO-RETENTION SURFACE.
                 SEDIMENT BASINS OR TRAPS. SEDIMENT FENCES MUST REMAIN AROUND THE PERIMETER OF THE SYSTEMS (BOTH AROUND THE
                                                                                                                                                                                                       SCREW CAP FIXED USING 3 SCREWS
                 FILTER MEDIA AND THE TOP OF BATTER) TO RESTRICT SEDIMENT INFLOW. CLEAR INDICATIONS OF THE RESTRICTION OF TRAFFIC TO
                                                                                                                                                                                                                                                                                                 STORMWATER QUALITY W.S.L.
                 THE BIORETENTION DEVICE MUST ALSO BE DISPLAYED.




                                                                                                                                                                                                                                                                                                  0.30m
             3. LANDSCAPE / OPERATIONAL ESTABLISHMENT – WHEN THE BUILDING PHASE IS 80% COMPLETE IN THE UPSTREAM CATCHMENT, THE                                                                     EXTEND LINER 300mm
                 TEMPORARY PROTECTIVE MEASURES AND ACCUMULATED SEDIMENTS WITHIN THE SYSTEMS MUST BE REMOVED. THE BASIN MUST                                                                        UNDER TOPSOIL AND PIN                                                                                                                                                                             TYPE 1 FIELD INLET
                 BE PLANTED WITH VEGETATION AND LANDSCAPED IN ACCORDANCE WITH THE APPROVED LANDSCAPE PLANS. SUFFICIENT WATERING                                                                    TO EMBANKMENT                                                                                                                                                                                     SURFACE LEVEL,
                 AND REMOVAL OF WEEDS FOLLOWING PLANTING MUST BE UNDERTAKEN IN ACCORDANCE WITH SECTION 3.9.3 OF THE WATER BY                                                                                                                                                                                                                                                                         INVERT LEVEL, AND




                                                                                                                                                                                                                                                                          50mm MIN.
                                                                                                                                                                                                       SUBSOIL DRAIN CLEANOUT - PVC                      0.50m




                                                                                                                                                                                                                                                                           COVER
                 DESIGN CONSTRUCTION AND ESTABLISHMENT GUIDELINES (2011).                                                                                                                                                                                 MIN.                                                                                                                                       SIZE AS SPECIFIED.
                                                                                                                                                                                                       PIPE (NON SLOTTED) AND CONNECTOR
             4. IN-SITU INFILTRATION TEST - AN IN-SITU INFILTRATION TEST WILL BE REQUIRED PRIOR TO PRACTICAL COMPLETION BEING GRANTED
                                                                                                                                                                                                       CLEANOUTS AT HEAD OF SUBSOIL
                 BY COUNCIL. THE TEST WILL NEED TO ACHIEVE AN AVERAGE RATE OF 120mm/h INFILTRATION (WITHIN APPROPRIATE TOLERANCES)




                                                                                                                                                                                                                                                                                                                                                              50mm
                                                                                                                                                                                                       DRAIN AS SHOWN ON PLAN




                                                                                                                                                                                                                                                                                                                                                               MIN
                 WITH AT LEAST 3 SAMPLE LOCATIONS AROUND THE BASIN. ANOTHER IN-SITU INFILTRATION TEST WILL BE REQUIRED FOR AT END OF
                 DEFECTS LIABILITY PERIOD.                                                                                                                                                              GRAVEL DRAINAGE LAYER
                                                                                                                                                                                                        - DEPTH VARIES (200mm MIN)
                                                                                                                                                                                                        TO SUIT GRADE OF SUBSOIL PIPES.
                                                                                                                                                                                                                                                                                                          PROVIDE BIDUM A12 OR
                                                                                                                                                                                                        5-7mm AGGREGATE NO FINES
             BIO RETENTION PARTICLE SIZE DISTRIBUTION AND PROPERTIES GUIDE:                                                                                                                                                                                                                               HDPE LINER - REFER NOTE
             SOURCE: (BIOFILTRATION MEDIA GUIDELINES (VERSION 3.01), PREPARED BY THE FACILITY FOR ADVANCING WATER BIOFILTRATION                                                                                                  UPVC JOINT TO                                        150Ø SMOOTH WALLED SLOTTED                              225Ø UNSLOTTED PVC                                   OUTLET PIPE -
             (FAWB), JUNE 2009.) & (BIO-RETENTION TECHNICAL DESIGN GUIDELINES (VERSION 1) PREPARED BY 'WATER BY DESIGN' (OCTOBER 2012)                                                                                           CONNECTION RISER                                     PVC PIPE - MIN 0.5% GRADE                               COLLECTOR PIPE - MIN 0.5% GRADE                      SIZE AS SPECIFIED
                                                                                                                                                                                                                                 TO SLOTTED PIPE                                      AND MAX 2.5m SPACINGS
             MATERIAL COMPOSITION RANGE GUIDE: FILTER MEDIA SPECIFICATION
             CLAY AND SILT           <3%           (<0.05mm)                                                                                                                                                                                                             TYPICAL BIO RETENTION BASIN SUBSOIL DRAIN
             VERY FINE SAND          5-30%         (0.05-0.15mm)
             FINE SAND               10-30%        (0.15-0.25mm)
                                                                                                                                                                                                                                                                         CLEAN OUT AND FILTER MEDIA SPECIFICATIONS
             MEDIUM TO COARSE SAND 40-60%          (0.25-1.0mm)                                                                                                                                                                                                                                            SCALE 1:20 (A1)
             COARSE SAND             7-10%         (1.0-2.0mm)
             FINE SAND               <3.0%         (2.0-3.4mm)

             WHILE TOTAL CLAY AND SILT CONTENT OF 3% IS RECOMMENDED, A CLAY AND SILT CONTENT UP TO 6% IS ACCEPTABLE PROVIDED:
             ·  THE SATURATED HYDRAULIC CONDUCTIVITY IS BETWEEN 100mm/hr & 300mm/hr AND
             ·  THE REMAINING MATERIAL MEETS THE COMPOSITION RANGE SPECIFIED ABOVE.
                                                                                                                                                                                                                                                   900x900 PRIMARY                                                                                               900x900 SECONDARY
             SOIL SPECIFICATIONS:                                                                                                                                                                                                                  OUTLET CONTROL PIT                                                                                            OUTLET CONTROL PIT
             · TOTAL NITROGEN CONTENT - <1000mg/kg                                                                                                                                                                                                                                                                           RL 100.15m AHD
             · ORTHOPHOSPHATE CONTENT - <80mg/kg SOILS WITH TOTAL PHOSPHORUS CONCENTRATIONS >100mg/kg SHOULD BE TESTED FOR                                                                                                                                                                     RL 100.00m AHD
                POTENTIAL LEACHING. WHERE PLANTS WITH MODERATE PHOSPHORUS SENSITIVITY ARE TO BE USED, TOTAL PHOSPHORUS
                CONCENTRATIONS SHOULD BE <20mg/kg)                                                                                                                                                                                                 2x Ø250 ORIFICE
             · ORGANIC MATTER CONTENT - AT LEAST 3% (w/w). AN ORGANIC CONTENT LOWER THAN 3% IS LIKELY TO HAVE TOO LOW A WATER                                                                                                                      AT IL 99.40
                HOLDING CAPACITY TO SUPPORT HEALTHY PLANT GROWTH. IN ORDER TO COMPLY WITH BOTH THIS AND THE TOTAL NITROGEN AND
                ORTHOPHOSPHATE CONTENT REQUIREMENTS, A LOW NUTRIENT ORGANIC MATTER WILL BE REQUIRED.                                                                                                                                     RL 99.40m AHD
             · pH - AS SPECIFIED FOR 'NATURAL SOILS AND SOIL BLENDS' 5.5-7.5 (pH 1:5 IN WATER)




                                                                                                                                                                                                                                                                 300mm
             · ELECTRICAL CONDUCTIVITY - AS SPECIFIED FOR 'NATURAL SOILS AND SOIL BLENDS' <1.2 dS/m.



             BIO RETENTION INSTALLATION NOTES:
             THE PLACEMENT OF DRAINAGE, TRANSITION AND FILTER MEDIA LAYERS MUST BE UNDERTAKEN CAREFULLY TO ENSURE CORRECT DEPTH,
             SLOPE AND COMPACTION:
             DEPTH: FILTER MEDIA SHOULD BE INSTALLED AND COMPACTED IN TWO LIFTS FOR DEPTHS OVER 500mm.
             SLOPE: THE TOP SURFACE OF THE DRAINAGE LAYER, TRANSITION LAYER AND FILTER MEDIA LAYER SHOULD BE FLAT. A SPREADER BAR
             SHOULD LEVEL THE SURFACE OF EACH LAYER.                                                                                                                                                                                                                                                                                                         1 x Ø375 RCP
             COMPACTION: THE FILTER MEDIA MUST BE LIGHTLY COMPACTED DURING INSTALLATION TO PREVENT THE MIGRATION OF FINE PARTICLES. THIS                                                                                                                                                       RL 98.00m AHD
             CAN BE ACHIEVED WITH A SINGLE PASS OF A LIGHT ROLLER SUCH AS A DRUM LAWN ROLLER. A VIBRATING PLATE CAN ALSO BE USED TO
             COMPACT SMALL BIO RETENTION SYSTEMS OR 'POZITRACK' LOADER CAN BE USED FOR LARGE SYSTEMS. ENSURE ONLY ONE COMPACTING
             PASS IS MADE OVER THE MEDIA FOR LIGHT COMPACTION.
             ROCK ARMOURING NOTES:
             1.    ROCKS TO BE DURABLE BLUE STONE OR OTHERWISE APPROVED BY SUPERINTENDENT.                                                                                                                       FILTER MEDIA REFER TYPICAL                               SUBSOIL DRAINAGE                                          1 x Ø300 ORIFICE
             2.    EACH ROCK SHALL BE:                                                                                                                                                                                  BIORETENTION DETAIL
                     - ANGULAR IN SHAPE (PROMOTES INTERLOCKING)
                     - FREE FROM OVERBURDEN, SPOIL, SHALE AND
                     ORGANIC MATERIAL.
             3.    NEITHER BREADTH NOR THICKNESS OF A SINGLE ROCK SHALL BE LESS THAN ONE HALF ITS LENGTH (ie THE ROCK SHALL BE CHUNKY                                                                                                                                             NORTHERN BASIN OUTLET PIT DETAIL
                   RATHER THAN FLAT).                                                                                                                                                                                                                                                                      SCALE 1:20 (A1)
             4.    ROCKS TO BE PLACED AND INTERLOCKED INTO POSITION AND BUILT UP TO FINAL LEVELS SHOWN, ENSURING COVERAGE OF                                                                                                                                                                               SCALE 1:40 (A3)
                   GEOFABRIC.
             5.    GAPS BETWEEN THE ROCKS ARE TO BE FILLED BY DROPPING SMALL ROCKS INTO GAPS AND LOCKING INTO POSITION WITH A
                   CROWBAR.
             6.    ALL ROCKWORK TO BE PLACED OVER BIDIM A24 OR EQUIVALENT.
             7.    FOR ROCK SIZED SPECIFIED AS D50 ON THE DRAWINGS, THIS CORRESPONDS TO THE MEDIAN DIAMETER OF WHICH HALF OF THE ROCK
                   SIZES SHALL BE GREATER AND HALF OF THEM SHALL BE SMALLER. THE ROCK SHALL BE WELL GRADED AND HAVE A MAXIMUM SIZE
                   NO GREATER THAN 30% AND A MINIMUM SIZE NO LESS THAN 30% SMALLER THAN D50. FOR EXAMPLE IF D50 = 400mm IS SPECIFIED, THE
                   EQUIVALENT ROCK DIAMETER RANGES FROM 280 to 520mm.
                                                                                                                                                                                                                                                                                                                                                                                 N.S.C. REF NO. MCU15/0111 & REC15/0031
REVISION    DATE   ISSUE DETAILS                                                DRAWN   DESIGN   DRAWN    STATUS                                                SCALE                                                  CLIENT                                                                                                          PROJECT                                               DRAWING TITLE


   A       30.01.17 ORIGINAL ISSUE                                               NA      BF                               FOR APPROVAL                                                                                          PALM LAKE WORKS PTY LTD                                                                                         PALM LAKE RESORT                                      STORMWATER QUALITY
   B       14.03.17 COUNCIL RFI RESPONSE - AMENDED TO COUNCILS REQUIREMENTS      BF      BF                             NOT FOR CONSTRUCTION                                                                                                                                                                                                        STAGE 4 & 5
                                                                                                                                                                    1:20   0.2   0   0.2   0.4   0.6   0.8   1   A1
                                                                                                                                                                                                                                                                                                                                                                                                        NOTES & DETAILS
                                                                                                 DESIGN   APPROVED                                                  1:40                                         A3                                                                                                                       19 TRADING POST ROAD - COOROY
                                                                                                          ANDREW McPHAIL                RPEQ 6921                                                                                                                                                                                                                                            PROJECT No.               DRAWING No.   REVISION
                                                                                                                                                                                                                                                                                                                                       DISCLAIMER

                                                                                                                                                                                                                                                                                      C 2015      www.calibreconsulting.co
                                                                                                                                                                                                                                                                                                                                                                                             16-003302
                                                                                                                                                                                                                                                                                                                                       ALL DIMENSIONS TO BE CHECKED ON SITE BY CONTRACTOR PRIOR TO
                                                                                                                                                                                                                                                                                                                                       CONSTRUCTION. USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE.
                                                                                                                                                                                                                                                                                                                                                                                                                             4702       B
                                                                                                          FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD
Log in to download the original file

Approved Plans OPW17_0055.pdf · 9.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.