2022-11-14 GC Agenda - Item 8 - Attachment 1 - Operational Plan update Q1 22_23
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnCorporate Plan Theme – The Noosa Economy Operational Plan 22/23
Corporate Plan Key Operational Initiatives Outcomes Responsible Update Q1 status
Focus Areas Areas
3.1 Implement the Implement priority activities Broadening of the economic structure that Economic Ongoing implementation of priority actions in On track
Noosa Economic from the Economic de-risks Noosa’s exposure to economic Development Economic Development Strategy.
Plan Development Development Strategy to shocks and increased job opportunities
Strategy build the resilience of •
Noosa’s traditional sectors
and continue to build
capacity in growth sectors
that diversify the economy
3.2 Provide support Develop and implement a A holistic approach to the management of Economic Project Governance-Project Control Group On track
for a sustainable Destination Management Plan tourism and implemented and clear Development established (EOI); External Reference Group
tourism sector direction for managing Noosa as a established (EOI); and Internal Reference Group
destination is established established (ET).
Economic Process implementation-Procurement Processes Behind
Development Completed and Consultants appointed; Schedule
Implementation Process Framework incl.
Product Audit and Dashboard (ongoing), AIR
DNA (ongoing), Demand profile (ongoing),
Noosa Values and Positioning (rescheduled to
Q2 and Q3).
Grant Application ($150k) submitted to DTIS
Eco-Accreditation Program (DMP Environmental
Stewardship).
Continue to support local Increased participation and engagement of CEO/Economic Building business eco-systems On track
businesses and collaborative business associations Development
arrangements e.g., Business Business Round Table-Meeting # 2 considered
Round Table proposed Adopt a Worker Program (30 x local
businesses, identified for pilot program); 2032
Olympic Games potential, opportunities tabled for
consideration.
NBN Collaboration-Improved understanding of
existing NBN capability in the shire, beyond