Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 25 March 2024, requesting a minor change to an existing
development approval. Council decided your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: 51986.3023.05
Street address: 37 Hastings St Noosa Heads Qld 4567
Real property description: BUP 8083
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
The following type of approval was issued on 20 January 1987
• Town Planning Consent Permit - Multiple Dwelling of 9 Units and 4 Shop
In relation to the request to make a minor change to the existing approval, Council on 22 May 2024,
decided to approve the requested changes. The changes are detailed below.
A. Approve the change.
B. Include additional condition 46
C. Refuse to amend condition 46 to include landscape plans for the following reasons;
• The requested landscaping of the existing garden bed directly to the north of the site is
external to the site and not within the property description and planning area for the
application. The proposed landscaping is not endorsed as part of this change request
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 13
Document Set ID: 23033864
Version: 3, Version Date: 28/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 12 pages
Page 2
3. CURRENCY PERIOD OF APPROVAL
To be read in conjunction with previous approvals for TPC 1845 (attached)
Amended conditions April 2015
Approved Plans
35. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
WD.202 P4 Roof Terrace Plans, prepared by Carol Tretheway February 2015
Design
WD.203 P4 Roof Plans, prepared by Carol Tretheway Design February 2015
WD.601 P4 Sections, prepared by Carol Tretheway Design February 2015
Building Height
36. The maximum height of the vergola must not exceed the height of the existing structure or
that indicated on the approved plans whichever is the lessor.
37. The alfresco dining and BBQ area on the north and western sides must not be enclosed by
permanent fixtures such as shutters, louvers, glass panelling or the like. An exception is made
to the southern facing wall of Unit 11 which is permitted to be partially enclosed by an Accoya
timber screen as per the approved plans.
Amended conditions 17 November 2020
21. (Amended 17 November 2020) Landscaping shall be established and maintained in
accordance with Project Plan No. 2022009 Rev (B), titled Landscape Plan, Plant Schedule
Specifications, prepared by John Hope Design and PSP 2 Landscaping. To minimise the
extent of hard pavement, the approved landscape plan must include the following
amendments:
a. The garden adjacent to the western entry stairs (high side) must be a minimum of
0.75m wide for its full length proposed, including the portion along the northern
boundary; and
b. The eastern garden starting from the pool extending to the stairs near the new shower
must be a minimum of 0.75m wide and must include 1 feature tree that grows to a
minimum height of 3m.
c. Vegetation in the garden outside the northern property boundary must be retained;
d. The amended plan must be submitted to Council prior to the issue of a building permit
for the works.
17 November 2020 - Approved Plans
Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
202009 (B) Landscape Plan, Plant Schedule, Specifications, N/D
prepared by John Hope Design and as annotated by
Council
WD 1.3 A Ground Floor Plan – proposed, prepared by Sparks 07.10.20
Architects
WD 1.4 A Pool Floor Plan – existing + demolition, prepared by 07.10.20
Sparks Architects
Page 2 of 13
Document Set ID: 23033864
Version: 3, Version Date: 28/05/2024
Page 3
WD 1.5 A Pool Floor Plan – proposed, prepared by Sparks 07.10.20
Architects and as annotated by Council
WD 2.1 B North Elevation, prepared by Sparks Architects 28.10.20
WD 2.2 A East Elevation, prepared by Sparks Architects 07.10.20
WD 2.3 A West Elevation, prepared by Sparks Architects 07.10.20
WD 3.3 A Section C, prepared by Sparks Architects 07.10.20
WD 3.5 A Section E, prepared by Sparks Architects 07.10.20
WD 3.6 A Section F, prepared by Sparks Architects 07.10.20
WD 3.7 A Section G, prepared by Sparks Architects 07.10.20
WD 8.4 A Pool internal Elevation, prepared by Sparks Architects 07.10.20
Performance Bond
38. Security in the form of a cash bond or trading bank guarantee to the sum of $30,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to pre-
start meeting. The cash bond or trading bank guarantee will be returned on performance of
the conditions of approval less any costs incurred by Council in respect of enforcing
performance of this permit. Council reserves the right to call upon the bond or guaranteed
sum to effect compliance with conditions.
Works
39. All works must be undertaken outside of all school holidays.
40. The 2 pathways connections extending from the site at the eastern and western beach
access points to the Council boardwalk must:
a. be constructed in accordance with the approved plan;
b. be constructed with a suitable slip resistant surface;
c. be constructed at the same level as the adjacent boardwalk and match smoothly with
the boardwalk; and
d. the adjacent landscaped areas must be filled to the level of the pathway to eliminate
any trip/fall hazard.
41. A Construction Management Plan must be submitted to and approved by Council prior to the
issue of a Building Permit. The Construction Management Plan must address the following:
a. site access points for workers, deliveries and heavy machinery;
b. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction;
ii. maintenance of safe pedestrian access for the areas affected by the works during
and after daily construction has ceased;
iii. proposed fencing to the site during the construction phase of the development;
and
iv. provision for worker car parking and delivery/waste areas.
c. maintenance and protection of water quality and existing drainage lines through the
construction site, through the implementation of appropriate erosion and sediment
control measures;
d. works programme identifying key components of the works and their respective
durations
Page 3 of 13
Document Set ID: 23033864
Version: 3, Version Date: 28/05/2024
Page 4
e. establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic, services and other relevant issues
f. identification of complaint management procedures including:
i. contact details for the on-site manager;
ii. dispute resolution procedures; and
iii. signage locations displaying the abovementioned details
g. details on the location of external fill/dump sites/sources, the haulage route, type of
vehicle to be utilised during operations and frequency of usage. NB any damage to the
existing road system as a result of haulage operations must be fully repaired at the
applicant’s expense.
42. Prior to any works (including demolition works) commencing a pre-start meeting is required.
43. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Demolition and building;
b. Civil engineering works;
c. Landscape works;
d. Erosion and sediment control works;
e. Other relevant parties.
Approved Plans – 19 August 2021 & 25 January 2023
44. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
A111 L Proposed Apartment Floor Plan, (Unit 8) prepared by
Natani Design
A112 L Proposed Roof Top Terrace, (Unit 11) prepared by 16.07.2021
Natani Design
A202 L East Elevation, (Unit 11) prepared by Natani Design 16.07.2021
A203 L North Elevation, (Unit 11) prepared by Natani Design 16.07.2021
A211 L 3D East View – Proposed, (Unit 11) prepared by Natani 16.07.2021
Design
A212 L 3D North Views, (Unit 11) prepared by Natani Design 16.07.2021
DD 0.1 A Cover page prepared by Sparks Architects 26.08.2022
DD1.2 A Ground Floor Plan prepared by Sparks Architects 26.08.2022
240922/01 A Landscape Plan Ground Floor prepared by John Hope Sept 2022
Designs as amended by Council with the 2 Pandanus
pedunculatus replaced with Syzygium austral ‘Pinnacle’
DD1.3 A Level 1 Floor Plan prepared by Sparks Architects 26.08.2022
240922/02 A Landscape Plan Level 1 prepared by John Hope Sept 2022
Designs
DD1.4 A Level 2 Floor Plan prepared by Sparks Architects 26.08.2022
Page 4 of 13
Document Set ID: 23033864
Version: 3, Version Date: 28/05/2024
Page 5
240922/02 A Landscape Plan Level 2 prepared by John Hope Sept 2022
Designs
DD1.5 A Level 3 Floor Plan prepared by Sparks Architects 26.08.2022
240922/03 A Landscape Plan Level 3 prepared by John Hope Sept 2022
Designs
DD1.6 A Roof Plan prepared by Sparks Architects 26.08.2022
DD2.1 A South Elevation prepared by Sparks Architects 26.08.2022
DD3.1 A Section A prepared by Sparks Architects 26.08.2022
Damage to infrastructure
45. Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
Approved Plans – 22 May 2024
46. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
WD 1.1 B Floor Plan 15.05.2024
as annotated by Council
WD 1.2 A North Elevation 11.03.2024
as annotated by Council
WD 1.3 A Detail Elevation 11.03.2024
4. REFERRAL AGENCIES
Not Applicable
5. ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Equitable Access and Facilities
1. The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the National Construction Code - Building Code of Australia – (Volume One)
Part D3 as they relate to people with disabilities. Your attention is also directed to the fact
that in addition to the requirements of the National Construction Code as they relate to people
with disabilities, one or both of the following may impact on the proposed building work:
(a) The Disability Discrimination Act 1992 (Commonwealth)
(b) The Anti-Discrimination Act 1991 (Queensland)
(c) The Disability (Access to Premises – Buildings) Standards
Aboriginal Cultural Heritage Act 2003
2. There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the Act can also issue stop orders for an activity that
Page 5 of 13
Document Set ID: 23033864
Version: 3, Version Date: 28/05/2024
Page 6
is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of
Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss any
obligations under the ACH Act.
New Advisory Note – 17 November 2020
3. A separate council permit is required for any works in the public space.
Infrastructure Charges
4. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue.
6. PROPERTY NOTES
Not Applicable
7. VARIATION APPROVAL DETAILS
Not Applicable
8. FURTHER DEVELOPMENT PERMITS REQUIRED
Not Applicable
9. SUBMISSIONS
There were 10 properly made submissions about the original application
10. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a negotiated decision notice will be
issued. Only one negotiated decision notice may be given.
11. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Yours faithfully,
Andrew Gaffney
Senior Development Planner
Enc: Appeal Rights
Approved Plans/Documents
cc. Unitywater
Page 6 of 13
Document Set ID: 23033864
Version: 3, Version Date: 28/05/2024
Page 7
DECISION NOTICE HISTORY
• Original Decision Notice - 20 January 1987.
• Decision Notice - Minor 51986.3023.05 – 22 May 2024 and additional conditions 46 and refuse to include landscape plans.
Page 7 of 13
Document Set ID: 23033864
Version: 3, Version Date: 28/05/2024
Page 8
Page 8 of 13 Document Set ID: 23033864 Version: 3, Version Date: 28/05/2024 [OCR of page images] Ns Town Planning Dept.. TPC 1845 21st November, 1986. Siemon & Brinkley, Solicitors, P.O. Box 695, NOOSA HEADS. 4567 Dear Sirs, Your Re: TPC 1845 - Talabar Pty. Ltd. Multiple Dwelling Nine (9) Units and Four (4) Shops, 37-39 Hastings Street, Noosa Heads. application was considered by Council at its meeting on 18th November, 1986~ Council resolved to propose to approve your application as shown on Plan Numbers 317-SK3, 317-SK4, Option B, subject to conditions listed below: 1 4. Document Set ID: 23033864 Compliance with 411 relevant provisions of the Town Planning Scheme, Chapter XLIV (Town Planning) and other Council Policies. The site shall be developed substantially in accordance with the plans forming part of and approved with this application. In accordance with Section 33 (16D) of the Local Government Act 1936, Council's approval is valid for a period of two (2) years at the expiration of which period the Council may take action to revoke its approval, if in the opinion of the Council substantial progress has not been made in erecting the building or other structure the subject of the Consent Permit; or the land, subject to the Consent Permit, is not being used substantially in accordance with the purposes for which consent was granted. To ensure compliance with any and all conditions of this approval Council will require that you enter into a Bank Guarantee of $25,000 to secure performance. The guarantee shall be lodged with Council prior to the issue of a Building Permit. Any costs incidental thereto will be borne by the Developer. The conditions of this approval are to be completed prior to the occupancy of the building and if this is not done, Council reserves the right to call on the bank guarantee lodged to carry out the works involved. secafd Version: 3, Version Date: 28/05/2024 Page 8 of 13
Page 9
Page 9 of 13 Document Set ID: 23033864 Version: 3, Version Date: 28/05/2024 [OCR of page images] Letter to SIBSMON & BRINKLEY 20/11/86. TPC 1845 TALABAR _P/L Page 2. 10. 1. 12. 136 14. 15. Document Set ID: 23033864 Contributions shall be paid in accordance with Council's Policy on Water Supply and Sewerage Headworks. Such contributions shall be paid within fourteen (14) days of building approval. Contributions shall be payable at the rate current at the date of payment. Current figure is estimated at:- Water Supply - $10940 Sewerage - $4458 (Plus P.I. index rises from September, 1986). Payment of any outstanding rates owing on the property. This consent approval does not imply Building Approval. Working 4@rawings shall be submitted in compliance with the Building Act 1975 as amended and shall be substantially in accorance with the plans the subject of this consent. (Substantial variations will require separate Council approval). The approval herein is for Town Planning Consent only and does not imply that Council approval will be granted to an application under the Building Units and Group Titles Act. Permanent covered car parking is to be provided on site for 16 vehicles All internal roadworks (including parking areas) and access from the existing frontage road to connect to the internal roadworks shall be provided with a sealed pavement, which shall be designed, drained, constructed and maintained in accordance with the standard and requirements of the Shire Engineer. Plans and specifications for the akove works shall be submitted to the Shire Engineer for approval prior to the issue of & Building Permit. The Developer shall bear the cost of alteration of any public utility or facilities necessitated by the development of the land or associated development external to the site. Connection to Council's existing water supply reticulation at the Developer's expense to the standards and requirements of Council's Building Surveyor. Connection to Council's existing Sewerage reticulation system at the Developer's expense to the standards and requirements of Council's Building Surveyor. Filling levels and floor levels of all buildings, other structures and car park area levels shall be established to the requirements of the Shire Engineer. Such levels shall be provided upon application to the Engineering Department. wef 3 Version: 3, Version Date: 28/05/2024 Page 9 of 13
Page 10
Page 10 of 13 Document Set ID: 23033864 Version: 3, Version Date: 28/05/2024 [OCR of page images] Letter to SLEMON & BRINKLEY 20/11/86. TPC 1845 TALABAR P/L Page 3. 16+ 7. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Document Set ID: 23033864 Filling, other development works or the erection of any buildings or other structures shall be carried out so as not to cause any ponding of water on adjoining land or any blockage or interference with natural watercourse or in any other way unduly affect adjoining property. No earthworks or filling shall be carried out on site until the issue of a Building Permit. Stormater, including that from the roofed and paved areas to be piped to Council's exiatin drainage system at the developer's expense to the standards and requiréments of Council's Building Surveyor. Nn identification survey of the subject site is to be carried out by a Licensed Surveyor and is to be submitted to Council at the time of foundation inspection by Council's Building Surveyor or immediately thereafter. Such survey shall set out the boundaries of the site and the position of the buildings on the site. The applicant shall cause minimum disturbance to natural flora and shall only remove that vegetation which would impede building operations. Where practicable, revegetation of the site is te be carried out following completion of building activity. landscaping shall be establishea and maintained in accordance with a landscaping plan approved by Council. Such Plan shall be prepared in accordance with the provisions of the Noosa Design Manual. No signage is approved as part of this consent. Further application to Council is required for signage prior to erection and regard shall be given to the Noosa Design Manual in preparing such an application. The subject site shall be cleared of noxious weeds prior to the issue of a Building Permit by Council. All lots that form part of this application shall be amaigamated in title prior to the issue of 4 Building Permit. Location points for mail delivery shall be to the requirements of Australia Post. The swimming pool shall be licensed annually with the Council's Health Department in accordance with the provisions of Chapter 42 of Council's Bylaws. Any flat, unit, intended to be let out for fee or reward shall be licensed annually with Council's Health Department in accordance with the provisions of Chapter 43 of Council's By-Laws prier to such letting. Adequate facilities shall be provided in accordance with the provisions of the Refuse Management Regulations 1983 for the storage and collection of refuse to the satisfaction of Council's Health Surveyor. senef 4 Version: 3, Version Date: 28/05/2024 Page 10 of 13
Page 11
Page 11 of 13 Document Set ID: 23033864 Version: 3, Version Date: 28/05/2024 [OCR of page images] Letter to SIBMON & BRINKLEY 20/11/86. TPC 1845 TALABAR P/L Page 4. 29. Approval of the Beach Protection Authority shall be obtained prior to the issue of a Building Permit by Council. 30+ An additional setback of two metres shall be made on the Hastings Street frontage of the shops for landscaping purposes. ———~—— 34+ Council will require a contribution of $1,500 towards payment of construction of the paved walkway on the Esplanade of the property. ——-""~ > 32. The developer shall contribute towards roadworks and landscaping in accordance with the Hastings Street policy. The contribution shall be paid within 14 days of issue of a Building Permit. The contribution payable is $4,234 plus CPI from September, 1986. 33. Pour (4) shops only are permitted. — 34. Any sand to be extracted from the site shall be deposited on Noosa Main _ Beach as directed by the Shire Enginer. Enclosed for your use are: (a) List of names and addresses of objectors against your proposal, (b> Copies of relevant parts of the Local Government Act outlining appeal rights against Council's decision. Yours faifhfully, Dede ilpot, SHIRE CLERK. Page 11 of 13 Document Set ID: 23033864 Version: 3, Version Date: 28/05/2024
Page 12
Page 12 of 13 Document Set ID: 23033864 Version: 3, Version Date: 28/05/2024 [OCR of page images] TPC 1845 ~ TALABAR PTY. LID LIST OF OBJECTORS Gail Joly, 12 Dame Patti Drive, Sunrise Estate, SUNSHINE BEACH. 4567 Db. Rooney & D. Massoud, 27 Elizabeth Street, NOOSAVILLE. 4566 Le Massoud, 27 Blizabeth Street, NOOSAVILLE. 4566 D. Grant, Unit 10, Timana, NOOSA HEADS. 4567 G-A. Manning, Iot 5, Cooroy-Noosa Road, TINBEERWAH. 4563 M. Timbs, 64 Varina Street, NOOSA HEADS. 4567 P. McNaught, 34 Bridge Road, “NORTH RYDE. 2113 Document Set ID: 23033864 Version: 3, Version Date: 28/05/2024 I. Skelton, 81 Cooyar Street, NOOSA HEADS. 4567 N. Burns, Shop 1, Laguna Court, Hastings Street, NOOSA HEADS. 4567 a. King, 196 Mary Street, GYMPIE. 4570 Page 12 of 13
Page 13
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 13 of 13
Document Set ID: 23033864
Version: 3, Version Date: 28/05/2024
Used in these records
Minor Change Existing Approval 51986 3023 05.pdfRelated documentApplication case desk ↗
About this file
- File size
- 585 KB (small file)
- File type
No other editions are linked here.