Council archive · source document
Minor Change Existing Approval 51986 3023 05 · 51986.3023.05
Page 11 of 13 Document Set ID: 23033864 Version: 3, Version Date: 28/05/2024 [OCR of page images] Letter to SIBMON & BRINKLEY 20/11/86. TPC 1845 TALABAR P/L Page 4. 29. Approval of the Beach Protection Authority shall be obtained prior to the issue of a Building Permit by Council. 30+ An additional setback of two metres shall be made on the Hastings Street frontage of the shops for landscaping purposes. ———~—— 34+ Council will require a contribution of $1,500 towards payment of construction of the paved walkway on the Esplanade of the property. ——-""~ > 32. The developer shall contribute towards roadworks and landscaping in accordance with the Hastings Street policy. The contribution shall be paid within 14 days of issue of a Building Permit. The contribution payable is $4,234 plus CPI from September, 1986. 33. Pour (4) shops only are permitted. — 34. Any sand to be extracted from the site shall be deposited on Noosa Main _ Beach as directed by the Shire Enginer. Enclosed for your use are: (a) List of names and addresses of objectors against your proposal, (b> Copies of relevant parts of the Local Government Act outlining appeal rights against Council's decision. Yours faifhfully, Dede ilpot, SHIRE CLERK. Page 11 of 13 Document Set ID: 23033864 Version: 3, Version Date: 28/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 51986 3023 05.pdfRelated documentApplication case desk ↗
About this file
- File size
- 585 KB (small file)
- File type
No other editions are linked here.