8 May 2023 Lisa Pienaar Noosa Council [email protected] RE: Response to Information Request (MCU23/0008) Office & Caretaker’s accommodation situated at 7 Woodland Dr, Peregian Beach Council issued a further information request on 6 March 2023. The following additional information provides a response to Council’s Information Request items: 1. Provide an amended application that fulfills the intent of the Innovation Zone and that outlined above. The revised plan includes tenancy sizes which have been designed to provide for uses and activities that promote knowledge creation and entrepreneurship in industry, research and development, science and technology – consistent with the purpose of the Innovation zone. The location and design connects with the Peregian Digital Hub, so as to promotes the clustering of entrepreneurial businesses around the precinct, as well as the Gigabit Fibre network adjoining the Telstra exchange. The Digital Hub currently includes 3 private office spaces, meeting rooms and areas for sole trader businesses. Discussions with the Peregian Hub have resulted in an amended design to allow for the overflow of businesses with between 2-5 staff seeking to locate in the precinct. There is demand for other similar size businesses to locate within the precinct and this facility and the connection to the hub provides for this demand. The proposed office sizes are similar size and shape to the 3 tenancies at the Digital Hub. The design and location provides for a clustering of uses in the Peregian Innovation Precinct, which are designed to attract Digital Agencies and creative, technologists and startups. 2. It is strongly suggested to amend the proposal to remove the caretaker’s component of the application as this use associated with an office use is not supported. The caretaker residence is a consistent code assessable use within the zone. The Planning Act 2016 prescribes that Council must decide to approve a code assessable application to the extent the development complies with the assessment benchmarks. The proposal meets all relevant assessment benchmarks (Acceptable Outcomes) of the Coastal communities code, Innovation zone code and the Caretaker’s accommodation, Dwelling unit and Rural workers accommodation code. The accommodation is located on the first floor adjoining the offices and is to be associated with the adjoining office space – conditions can be imposed in this regard to ensure the unit is not separately let for other accommodation activities. The caretakers is small scale (<65m2) accessed through the innovation offices and provides casual surveillance over the public space. A dedicated parking space is provided, and line marked for the caretaker. The design of the unit overlooks the park and provides for casual surveillance and security to the precinct, with a balcony meeting the minimum size requirements providing for acceptable amenity to the resident caretaker not overlooking other buildings or adjoining premises.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
3. In conjunction with Item 7 of this letter, provide justification for this approach,
how a short fall in parking (9 spaces) is justified, and explore how the impacts
on the streetscape can be mitigated and if appropriate, provide amended
plans.
Amended plans are provided with no car stackers and a layout that has been designed to
integrate with the existing innovation/Peregian Digital Hub precinct. Carparking is provided
at a rate of 1 per 30m2 as per the rate prescribed for the Major Centre zone.
The Performance Outcomes seek for sufficient parking to be provided, having regard to
the specifics of the use including—
- the type and intensity of land use;
- any existing parking available on the site;
- hours of operation;
- likely numbers of users;
- accessibility to the site by means other than private motor vehicle;
- the peak parking demand periods of uses on the site; and
- the availability of alternative car parking; and
The proposed Innovation offices do not rely on standard 9am to 5pm office hours. Each of
the offices depending on the nature and markets they are working in will work at non-
standard business hours and less client to client meetings, resulting in less of a peak
parking generation time. Discussions with the Peregian Digital Hub indicate the proposed
car parking is at its peak during large meeting events and outside of this time.
The offices do not propose or designed to cater for large events and meeting rooms, rather
the building would rely on the Digital Hub for these activities. There is ample parking
surrounding the precinct with multiple trip generations provided for byway of the stronger
link to the digital hub and overflow parking within Rufous Street.
A Traffic Impact Statement is provided by Fernway Traffic Engineers based on the revised
design. The conclusions of the report demonstrate the site has convenient access to
alternative transport options (bus, cycleways and footpaths); the availability of over 114
public car parking spaces within a 250m distance and the compliance of the parking
generation rates of the development with the RMS Guide to Traffic Generating
Developments 2002.
Furthermore, an analysis of other planning scheme carparking rates has also been
undertaken in relation to office developments within Southeast Queensland and is
presented below.
Council Planning Scheme Office Parking Rate
Moreton Bay Council 3 spaces per 100m2 GFA
Brisbane City 3 spaces per 100m2 GFA
Gold Coast City 3 spaces per 100m2 GFA
Sunshine Coast 1 space per 30m2 or 1 space per 40m2 in Major Centre zone.
Gympie 1 space per 30m2 GFA
Toowoomba 3.5 spaces per 100m2 GFA
Logan City 1 space per 30m2 GFA above the ground level
The design meets the relevant parking standards in all other Council planning scheme
areas. It is further noted The Noosa Plan 2020 prescribes a parking rate of 1 space per
30m2 for above ground floor office space in the Major Centre Zones.
Considering the type and intensity of the proposed innovation office use and layout, the
availability of over 115 public spaces, the sporadic hours of use, access to other means
of transport and the comparison with other carparking standards within the region and
Australia – The proposal meets the relevant Specific Outcome and provides sufficient
onsite parking to accommodate the number and type of vehicles likely to be generated by
the development.
Page 2 of 6
Page 3
4. Provide amended plans that show RL’s from finished and existing ground
level relative to both levels and the highest point of the building.
The building height has been reduced in size as a result of the removal of the car stackers.
Levels are provided on the plans which demonstrate the building is less than 8m.
5. Provide additional detail demonstrating how a B99 vehicle can manoeuvre on-
site to be able to exit the site in a forward gear in the event that all available
parking is occupied. The detail must be prepared by a suitably qualified
person (RPEQ – Registered Professional Engineer of Queensland) and
address, but not be limited to the requirement for manoeuvres to be no more
than 3 total movements.
Updated plans are provided demonstrating cars can access, manoeuvre, and leave the
site in a forward gear. Two tandem bays are provided for the office use which is
appropriate for private office suites with minimal client visitation.
Page 3 of 6
Page 4
6. Provide additional detail demonstrating the how the proposed Car Stackers
will function in the event of a power failure and what impact a power failure
will have on the overall functionality of the carpark.
7. Provide additional detail demonstrating how the parking arrangement
described in Sections 5.4 and 6.0 of Fernway Engineering’s Traffic Impact
Statement dated December 2022 will function. The additional detail must
include, but not be limited to:
a. demonstrate where staff with a SUV will park; and
b. demonstrate if a customer with a Sedan can safely park in the ‘lower’
carpark.
8. Provide additional detail demonstrating how the proposed Car Stackers will
function when both ‘upper’ and ‘lower’ parks are occupied. The additional
detail must include, but not be limited to:
a. demonstrate how tenancy staff parked in the ‘upper’ carpark will access
their vehicle in the event the ‘lower’ customer park is occupied;
b. demonstrate how the owner of a vehicle parked in the ‘lower’ customer
carpark will be identified and their vehicle moved in the event tenancy staff
parked in the ‘upper’ carpark needs to leave the development (e.g.,
emergency); and
c. provide comment discussing if it is practical and reasonable, given the
proposed medical use of the development, to identify and approach a
customer to relocate their vehicle.
9. Provide additional detail demonstrating how the proposed Car Stackers and
carparking area will operate when vehicles enter and exit the Car Stackers.
The detail must assume that all other stackers and spaces are occupied, be
prepared by a suitably qualified person (RPEQ – Registered Professional
Engineer of Queensland) and include, but not be limited to:
a. vehicle paths and manoeuvring areas for each vehicle within the site;
b. demonstrate if the proposal requires the first vehicle to exit the site to
provide space for the second vehicle to manoeuvre and exit the site; and
c. demonstrate the required queuing areas within the site.
10. Provide additional detail demonstrating the proposed carpark has sufficient
width to provide B99 vehicles with a passing opportunity. The detail must be
prepared by a suitably qualified person (RPEQ – Registered Professional
Engineer of Queensland) and include, but not be limited to:
a. demonstrating a B99 vehicle has sufficient area to queue, allow another
B99 vehicle to manoeuvre and exit any of the carparks and pass.
The car stackers have been removed and a more legible layout connecting to the Peregian
Digital Hub with a reduced GFA is proposed.
Page 4 of 6
Page 5
11. Provide amended plans demonstrating that the location of the proposed
crossover has suitable separation and will not compromise the safety of
pedestrians waiting to cross Rufous Street at the existing pedestrian pram
ramp. The amended plans must be prepared by a suitably qualified person
(RPEQ – Registered Professional Engineer of Queensland).
12. Provide an amended plan demonstrating where the proposed grate drain will
discharge to. The amended plan must be prepared by a suitably qualified
person (RPEQ – Registered Professional Engineer of Queensland).
13. Provide an amended Concept Stormwater Management Plan that removes the
‘Small Car’ annotations.
Updated stormwater engineering plans are provided, included on the plans is a pram ramp
to be located across from the existing crossing built by Council to the west. All engineering
may be conditioned as part of the finalised Operational Works package.
14. If the ‘Small Car’ annotation is intended, provide additional detail
demonstrating how this affects the functionality of the carpark as described
in Sections 5.4 and 6.0 of Fernway Engineering’s Traffic Impact Statement
dated December 2022.
The car stackers have been removed and a more legible layout connecting to the Peregian
Digital Hub with a reduced GFA proposed.
15. Provide detailed landscape concept plans prepared by a suitably qualified
landscape architect in accordance with the requirements of the PSP2 –
Landscaping, and that incorporate the following:
a) Vegetation with vertical scale to provide screening/buffering of the built
form when viewed from Woodland Drive, Rufous Street, and the
recreation and open space zones. This landscape should be designed
such, that a minimum 30% of the built form will be screened at maturity.
b) All landscape areas must allow for deep planting in natural ground
unobstructed by infrastructure.
c) Incorporation of 1 street tree per 8 metres of frontage.
Please find attached the updated preliminary concept landscape plan from Place Design
The car stackers have been removed and a more legible layout connecting to the Peregian
Digital Hub with a reduced GFA proposed. A picture of the site looking east across Rufous
Dr is included below showing the existing stormwater infrastructure, mounding in the park
precinct and Digital Hub in the distance.
Page 5 of 6
Page 6
----------------------------------------------------------------------------------------------------------------------
Pursuant to the Development Assessment Rules, the applicant has given the assessment
manager the information requested. Please continue with your assessment in accordance
with the DA Rules. If you have any further queries in relation to the above, please do not
hesitate to contact myself.
Regards,
Jack Lewis B.Sc Hons UNSW M.Plan Otago
Planner/Director
Pivotal Perspective Pty Ltd
0406 334 227
Page 6 of 6
Used in these records
response to information request woodland.pdfRelated documentApplication case desk ↗
About this file
- File size
- 984 KB (small file)
- File type
No other editions are linked here.