Council archive · source document
20211104OBA_R2_Information_Request_Response - Acoustic RF · MCU21/0146
Very large file (13.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ÿ
"#$ÿ&'(')*+(,-ÿ/0(+'ÿ',1('21+'&ÿ
34ÿ55567ÿ587ÿ9ÿ559ÿ4ÿ:557ÿ;ÿ759<ÿÿ74ÿ6ÿ58<ÿ2ÿ
=ÿ ?5@ÿ7A59ÿ587ÿ69997ÿ64ÿÿ8ÿ7895ÿ7<ÿ55ÿ8B7C8ÿ7ÿ9Bÿ8ÿ656ÿ
D<56ÿEFÿ
=ÿ 587ÿ7ÿDG!ÿ4BÿEÿÿ8ÿ55ÿ4ÿ79ÿ5897ÿÿÿ4ÿ5789ÿ656ÿD9ÿ
EFÿÿ
=ÿ ÿ?5ÿ7A59ÿ587ÿ69997ÿ559ÿ4ÿ95555ÿ487ÿ57ÿ877ÿG!ÿ4Bÿ587ÿ7ÿ
D89ÿEÿ
ÿ
ÿ 587ÿ7ÿDG!ÿ4BEÿ97ÿ899ÿ79ÿ5897ÿ
ÿ 587ÿ6999ÿ5ÿ474ÿ!99ÿ65ÿ5ÿ55ÿÿ
587ÿ7ÿDG!ÿ4BEÿ5ÿ474ÿÿ!99ÿ65ÿ5ÿ55ÿÿ
ÿ
HIJKLMÿNOPÿ2MQRSTIQSUÿ/USTVÿ(QWKXVIQÿYSLLIMLXÿ
(TÿSQWKXVIQÿZSLLIMLÿSUWTJÿVRMÿUWS[ITJÿ[WQ\ÿSXÿLMQW]]MT[M[ÿITÿVRMÿ(QWKXVIQÿ0WJIQÿ,M^WLVÿ_WLÿ+WWXSÿ̀IaIQÿ
bLM_cÿ$dNeNfNf#ghdidj(h,jh*Yklÿ[SVM[ÿiÿmKUnÿ$d$NkÿoSXÿSXXK]M[#ÿÿ
34ÿ778ÿ587ÿ6999ÿ55ÿ474ÿ8Aÿ97ÿ65ÿ4ÿ57ÿ5Bÿÿÿÿ64ÿÿ8ÿ7895ÿ
7<ÿ55ÿ8B7C8ÿ59ÿ4749ÿ34ÿ587ÿ6999ÿ55ÿ7ÿ9Bÿ8ÿÿp789ÿqÿ
;5ÿ64ÿ57ÿ7ÿ7ÿ4ÿ97576<ÿ55ÿ4ÿ7457ÿ9ÿ34ÿ957ÿÿ47ÿ959ÿ9ÿ67ÿ
5ÿ4ÿ4ÿÿ597ÿ7ÿ7ÿ
ÿ
12345673898 3898 989 3898 989 3898 98 44555ÿ !ÿ
ÿ
[OCR of page images]
8.2. STATIONARY PLANT TREATMENTS
The following acoustic treatment for the Noosa Civic stationary plant shall be fully implemented:
e Solid, gap-free acoustic barriers with a minimum surface density of 12kg/m2 as marked up below
(yellow line);
¢ Acoustimax panels (75mm thick ) in lieu of the standard louvers indicated in the figure below (red
line); and
e Solid gap-free acoustic barriers for the rooftop exhaust fans using 75mm thick Acoustimax panels
(purple line).
=== Acoustimax panels (75mm thick) replacing current standard louvers
Acoustic barrier to height 500mm above top of plant
ees Acoustimax panels (75mm thick) to height 500mm above top of plant
Figure 15- Mechanical Plant Acoustic Barriers
An acoustic barrier along the loading dock as recommended in the Acoustic Logic Report for Noosa Civic
(ref: 20191414.3/0607A/R7/OB), dated 6 July 2021) was assumed.
The assumed acoustic barrier of height 2-4 metres above the loading dock pad level and with a minimum surface
density of 12kg/m? or higher. The acoustic barrier location is marked up in Figure 16.
Compliance with noise limits is the responsibility of the shopping centre. The predictions in this report are based
on the mechanical plant operating as is.
IMobs\2021\202 10208\202 10208.3\20210923JJMA_R4_Development_Application_.docx 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20211104OBA_R2_Information_Request_Response - Acoustic RF.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.